Tav-Lee Trail
Rail-trail in Florida · OpenStreetMap relation
Runs through Leesburg and Tavares · Lake County
Conditions now
Loading the weather near Leesburg…
Forecast by the National Weather Service for Leesburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Vindale Road mile 7.4 directions to trailhead 1
- Parking mile 7.9 directions to trailhead 2
- Parking mile 7.9 directions to trailhead 3
- Parking mile 8 directions to trailhead 4
- Parking at West Maud Street mile 9 directions to trailhead 5
- Parking at West Alfred Street mile 9 directions to trailhead 6
- Parking at West Alfred Street mile 9 directions to trailhead 7
- Parking at West Maud Street mile 9.2 directions to trailhead 8
- Parking at West Maud Street mile 9.2 directions to trailhead 9
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Tav-Lee Trail is a paved multi-use path in Lake County, Florida, that runs beside US 441 between Tavares and Leesburg. The City of Leesburg lists it as 3.5 miles of paved pathway that starts in downtown Tavares and ends at the Via Port Mall. No Lake County page describing the trail or its manager could be fetched.
TrailLink describes the built path as running about 3 miles from West Main Street in Tavares, parallel to US 441, to a point just past Kinne Pearce Road on the Leesburg side. It has a couple of at-grade road crossings and no designated parking; TrailLink suggests parking at the mall or at shops and restaurants along the route. An undated City of Leesburg notice for an open house on a Project Development and Environment reevaluation study describes a further segment of about six miles, near and along US 441, from the Venetian Gardens Trail near North Canal Street in Leesburg east to Lakes Boulevard, just past the Lake Square Mall, where it would link with the Tavares trail. OpenStreetMap maps that gap as a proposed path.
The record's map line covers about 3.4 miles, from the downtown streets near Sinclair Avenue and West Alfred Street in Tavares west along an asphalt path to US 441 in Leesburg. That is all of the built trail OpenStreetMap maps under this name.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Leesburg Municipal Airport, 5.3 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 70 73 77 83 88 91 91 92 90 84 77 72 Low °F 49 52 56 62 68 73 75 75 73 66 57 52 Precipitation, in 2.5 2.1 3.2 2 2.7 7 5.9 6.6 5.2 2.6 1.8 2.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Orlando sheet (1:250,000); the 1965 Leesburg East sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Fountain Lake Trail within 0.2 mi · 0.9 mi, paved
- Leesburg-Wildwood Trail 0.9 mi away · 2.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2113721, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Facilities — City of Leesburg, Florida · government source · checked Oct 16, 2026 Supports: Tavares-Leesburg (Tav-Lee) Trail: 3.5 miles of paved pathway; starts in downtown Tavares and ends at Via Port Mall
- City to host Open House for Tav-Lee Trail Project — City of Leesburg, Florida · government source · checked Oct 16, 2026 Supports: PD&E reevaluation study; recommended route of about six miles near and along US 441 from the Venetian Gardens Trail near N. Canal Street east to Lakes Boulevard, just past the Lake Square Mall, linking with the Tavares trail
- Tav-Lee Trail — TrailLink · web · checked Oct 16, 2026 Supports: paved multipurpose trail; about 3 miles from W Main St. in Tavares parallel to US 441 to just after Kinne Pearce Rd.; at-grade road crossings; no designated parking, park at the mall or businesses
- Relation 2113723, Tav-Lee Trail, and ways named Tav-Lee Trail (e.g. way 157918595) — OpenStreetMap · web · checked Oct 16, 2026 Supports: proposed path west toward Leesburg; record's 3.4-mile line from the Tavares end near Sinclair Avenue and West Alfred Street west to US 441 in Leesburg; asphalt
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.