Tedesco Connector Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Ames · Story County
Conditions now
Loading the weather near Ames…
Forecast by the National Weather Service for Ames · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Tedesco Connector Trail is a 10-foot-wide paved trail on the south side of Ames, Iowa, managed by Story County Conservation. The county lists it at 2.6 miles and says it was built in 2020; this record maps about 2.7 miles. It runs from University Boulevard to county highway R-38, connecting the Tedesco Environmental Learning Corridor and the rest of Ames with surrounding communities, the Heart of Iowa Nature Trail and the High Trestle Trail.
The trail was the third phase of the Tedesco Environmental Learning Corridor, a 37-acre county park in the latest expansion of the Iowa State University Research Park. In February 2020 the Story County Board of Supervisors approved plans and opened bidding for the phase, described in the Ames Tribune as a 2.5-mile trail running west from the middle roundabout on University Boulevard along the vacated Chicago and North Western railroad bed, diagonally to 260th Street and on toward R-38. Mike Cox, the county's conservation board director, said then that all the needed easements had been acquired. The county describes the trail as making the old Ames-to-Kelley railroad line a gateway into Ames again.
Bluebird nesting boxes and native plantings line the route, and the trail is a wildlife refuge where hunting is not allowed. The Tedesco corridor, at 1815 Plaza Loop, has paved primary trails, natural secondary trails, a wetland boardwalk and stream access. Story County reports park enhancement work under way there in 2026, with a section of trail off University Boulevard into the park closed until the project is finished, which the county expects in late 2026.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Chicago & North Western / Fort Dodge, Des Moines & Southern line, built 1874–1907, abandoned 1965–1985 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ames Municipal Airport, 3.1 km from the trail's middle, 25 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 29 33 47 61 72 81 84 82 76 63 47 34 Low °F 11 15 27 38 50 60 63 60 51 39 27 16 Precipitation, in 0.6 0.8 1.9 3.9 5.2 5.2 4.4 4.8 3.3 2.8 1.9 1.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1911 Slater sheet (1:62,500); the 1954 Des Moines sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- University Boulevard Trail within 0.2 mi · 3.2 mi, paved
- Skunk River Trail 2.3 mi away · 2.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14435503, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tedesco Connector Trail — Story County, IA (Story County Conservation) · government source · checked Oct 15, 2026 Supports: 10-foot paved trail from University Boulevard to county highway R-38, connections to Tedesco corridor, Heart of Iowa Nature Trail and High Trestle Trail, 2.6 miles, constructed 2020, bluebird boxes and native plantings, wildlife refuge with no hunting, Ames-to-Kelley railroad line
- Tedesco Environmental Learning Corridor — Story County, IA · government source · checked Oct 15, 2026 Supports: 37-acre park in the ISU Research Park expansion, 1815 Plaza Loop, paved primary and natural secondary trails, wetland boardwalk and stream access, 2026 enhancement work and closed trail section off University Boulevard until late 2026
- Phase 3 of Tedesco Learning Corridor aims to connect city to bike trails (Ames Tribune, February 16, 2020) — BikeIowa · web · checked Oct 15, 2026 Supports: Phase III of the corridor, February 2020 approval of plans and bidding by the Board of Supervisors, 2.5 miles along the vacated Chicago and North Western railroad bed from the University Boulevard roundabout to 260th Street and R-38, easements acquired, Mike Cox quote
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.