States › Arizona

Tempe Town Lake North Path

Greenway in Arizona

Runs through Tempe · Maricopa County

Conditions now

Loading the weather near Tempe…

Forecast by the National Weather Service for Tempe · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Lake View Road mile 1.1 · water directions to trailhead 1
  2. Parking mile 1.6 directions to trailhead 2
  3. Parking at North College Avenue mile 1.7 · restrooms · water directions to trailhead 3
  4. Parking at North College Avenue mile 1.8 · restrooms · water directions to trailhead 4
  5. Parking at East Playa Del Norte Drive mile 2.3 directions to trailhead 5
Tempe Town Lake North Path (opens in a new tab)
Photo: kc7mod · CC BY-SA 4.0 · Mapillary

About this trail

The Tempe Town Lake North Path is a paved path of about 2.6 miles along the north bank of Tempe Town Lake in Tempe, Arizona. The lake is an artificial reservoir about two miles long at the confluence of the Salt River and Indian Bend Wash, developed by the City of Tempe under the Rio Salado Master Plan adopted in March 1989. It opened to the public on November 7, 1999.

Tempe Beach Park connects to about five miles of paths for biking, jogging and in-line skating that circle the lake. OpenStreetMap maps the north path as concrete, lit, and open to bicycles and pedestrians. Downtown Tempe's listing for the lakeside park describes its east section as running from Rural Road to Mill Avenue and its west section from just west of the Mill Avenue Bridges to Priest Road, and describes a multi-use path that commuters use to reach offices from the Indian Bend Wash greenbelt.

A gap remains in the off-street path around the lake. In January 2025 Tempe was announced as receiving a $25 million RAISE grant for a bridge west of McClintock Drive and an approximately 0.25-mile shared-use path along the north bank that would connect the bridge to the Indian Bend Wash Path.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Tempe Asu, 1.9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F7174808795104106105101917969
Low °F384146515967767569564538
Precipitation, in11.110.20.20.111.30.70.60.70.9
Snow, in000000000000
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1913 Mesa sheet (1:62,500); the 1952 Tempe sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Tempe, 1902: Train wreck on the Maricopa and Phoenix Railroad caused by bridge failure after flood damage
Tempe, 1902: Train wreck on the Maricopa and Phoenix Railroad caused by bridge failure after flood damagePhoto: Photographer unknown; original print located at University Archives, Hayden Library, Arizona State University, Tempe, Arizona · Copy in HAER AZ-29 · Library of Congress, Prints & Photographs Division (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Stanton, Woods announce $25 million in federal funds for bicycle and pedestrian bridge across Rio Salado — Office of Rep. Greg Stanton · government source · checked Oct 17, 2026
    Supports: RAISE grant, bridge west of McClintock Drive, 0.25-mile north bank path, off-street gap
  3. Tempe Town Lake — Wikipedia · organization · checked Oct 17, 2026
    Supports: lake size and location, Rio Salado Master Plan, opening date, five miles of paths around the lake
  4. Linear Park — Downtown Tempe · web · checked Oct 17, 2026
    Supports: east and west sections, commuter use, Indian Bend Wash connection
  5. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: concrete surface, lit, bicycle and foot use of the path named Tempe Town Lake North Path

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.