Tempe Town Lake North Path
Greenway in Arizona
Runs through Tempe · Maricopa County
Conditions now
Loading the weather near Tempe…
Forecast by the National Weather Service for Tempe · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Lake View Road mile 1.1 · water directions to trailhead 1
- Parking mile 1.6 directions to trailhead 2
- Parking at North College Avenue mile 1.7 · restrooms · water directions to trailhead 3
- Parking at North College Avenue mile 1.8 · restrooms · water directions to trailhead 4
- Parking at East Playa Del Norte Drive mile 2.3 directions to trailhead 5
About this trail
The Tempe Town Lake North Path is a paved path of about 2.6 miles along the north bank of Tempe Town Lake in Tempe, Arizona. The lake is an artificial reservoir about two miles long at the confluence of the Salt River and Indian Bend Wash, developed by the City of Tempe under the Rio Salado Master Plan adopted in March 1989. It opened to the public on November 7, 1999.
Tempe Beach Park connects to about five miles of paths for biking, jogging and in-line skating that circle the lake. OpenStreetMap maps the north path as concrete, lit, and open to bicycles and pedestrians. Downtown Tempe's listing for the lakeside park describes its east section as running from Rural Road to Mill Avenue and its west section from just west of the Mill Avenue Bridges to Priest Road, and describes a multi-use path that commuters use to reach offices from the Indian Bend Wash greenbelt.
A gap remains in the off-street path around the lake. In January 2025 Tempe was announced as receiving a $25 million RAISE grant for a bridge west of McClintock Drive and an approximately 0.25-mile shared-use path along the north bank that would connect the bridge to the Indian Bend Wash Path.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tempe Asu, 1.9 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 71 74 80 87 95 104 106 105 101 91 79 69 Low °F 38 41 46 51 59 67 76 75 69 56 45 38 Precipitation, in 1 1.1 1 0.2 0.2 0.1 1 1.3 0.7 0.6 0.7 0.9 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Tempe Concrete Arch Highway Bridge, Tempe · structure, listed 1984 · nomination file for Tempe Concrete Arch Highway Bridge
- Moeur Park, Tempe · historic district, listed 2014
- Old maps
USGS topographic maps of the trail's middle go back to the 1913 Mesa sheet (1:62,500); the 1952 Tempe sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Nearby trails
- North Linear Park Path within 0.2 mi · 1.4 mi, dirt
- Grand Canalscape within 0.2 mi · 33.8 mi, paved
- Crosscut Canal Multi-Use Path 0.3 mi away · 3.7 mi, paved
- Indian Bend Wash path 1.1 mi away · 4.8 mi, paved
- Salt River Shore 1.2 mi away · 2.3 mi, paved
- Tempe Canal Path 2.4 mi away · 7.0 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Stanton, Woods announce $25 million in federal funds for bicycle and pedestrian bridge across Rio Salado — Office of Rep. Greg Stanton · government source · checked Oct 17, 2026 Supports: RAISE grant, bridge west of McClintock Drive, 0.25-mile north bank path, off-street gap
- Tempe Town Lake — Wikipedia · organization · checked Oct 17, 2026 Supports: lake size and location, Rio Salado Master Plan, opening date, five miles of paths around the lake
- Linear Park — Downtown Tempe · web · checked Oct 17, 2026 Supports: east and west sections, commuter use, Indian Bend Wash connection
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: concrete surface, lit, bicycle and foot use of the path named Tempe Town Lake North Path
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

