States › Alabama

Tennessee River Greenway

Greenway in Alabama

Runs through Huntsville · Madison County

Conditions now

Loading the weather near Huntsville…

Forecast by the National Weather Service for Huntsville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.7 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Trailhead at Harbor Road Southeast mile 1 directions to trailhead 1
  2. Parking at Harbor Road Southeast mile 1 directions to trailhead 2
  3. Parking at Ditto Landing Road Southeast mile 1 · restrooms directions to trailhead 3
Tennessee River Greenway (opens in a new tab)
Photo: ShanMcG213 · CC BY-SA · Flickr

About this trail

The Tennessee River Greenway is a paved City of Huntsville greenway along the Tennessee River in South Huntsville, Alabama. The city's listing places it from Ditto Landing to the Madison County Marina, gives its length as 0.93 mile and shows a paved path along the river; parking is at the trailhead at Ditto Landing. The city lists connections to Ditto Landing Park, the Madison County Marina, the river and the Aldridge Creek Greenway.

The greenway has since been extended to the north. In April 2023 the Huntsville City Council approved a design contract with Garver for Phase 3 of the Tennessee River Greenway, about 1.5 miles between Hobbs Road and Green Cove Road intended to link the Elgie's Walk Greenway with Ditto Landing, WAFF reported. Construction of the addition began in September 2025, and on July 29, 2026 Mayor Tommy Battle cut the ribbon on the 1.5-mile section from Redstone Road to Green Cove Road. The city says it completes a continuous 17-mile loop in South Huntsville that includes sections of the Aldridge Creek Greenway and connects to Ditto Landing and the river; WAFF described a loop of nearly 15 miles.

The record's map line, from OpenStreetMap, is about 3.7 miles of asphalt in two pieces that do not join: about 2.6 miles in the north, from Redstone Road south past Green Cove Road to near Buxton Road, which takes in the area where the 2026 section was built, and about 1.1 miles running southeast from Ditto Landing along the river toward the marina. The gap between Buxton Road and Ditto Landing is not mapped under this name.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Owens Cross Roads 3s, 13.6 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505563717886888884746253
Low °F303239465664686659473632
Precipitation, in5.95.55.55.14.94.54.23.74.23.74.56.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Huntsville sheet (1:125,000); the 1950 Farley sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Tennessee River Greenway — City of Huntsville · government source · checked Oct 16, 2026
    Supports: South Huntsville, from Ditto Landing to the Madison County Marina; 0.93 miles; paved trail along the river; parking at the Ditto Landing trailhead; connections to Ditto Landing Park, the marina, the Tennessee River and the Aldridge Creek Greenway
  3. Tennessee River Greenway addition completes South Huntsville Greenway Loop — City of Huntsville (July 29, 2026) · government source · checked Oct 16, 2026
    Supports: ribbon-cutting led by Mayor Tommy Battle; 1.5 miles from Redstone Road to Green Cove Road; construction began September 2025; continuous 17-mile loop including sections of the Aldridge Creek Greenway, connecting to Ditto Landing and the river
  4. City Council authorizes expansion of greenway access in South Huntsville — WAFF (April 28, 2023) · web · checked Oct 16, 2026
    Supports: council approved Garver contract for Phase 3 design; about 1.5 miles between Hobbs Road and Green Cove Road; links Elgie's Walk Greenway to Ditto Landing
  5. New section of Tennessee River Greenway opens in South Huntsville — WAFF (July 29, 2026) · web · checked Oct 16, 2026
    Supports: ribbon-cutting on Wednesday; Redstone Road to Green Cove Road; nearly 15-mile loop
  6. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: record's map line, about 3.7 miles of asphalt in two unconnected pieces: about 2.6 miles from Redstone Road south past Green Cove Road to near Buxton Road and about 1.1 miles southeast from Ditto Landing

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.