States › Indiana

Marquette Greenway

Greenway in Indiana · OpenStreetMap relation

Runs through Hammond, Whiting, Gary and Burns Harbor · Lake and Porter counties

Conditions now

Loading the weather near Gary…

Forecast by the National Weather Service for Gary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.3 mi 18.3 km1
On former railbed
2.2 mi 20%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Calumet Avenue mile 1.4 directions to trailhead 1
  2. Parking at 129th Street mile 3.4 directions to trailhead 2
  3. Parking at 129th Street mile 3.6 directions to trailhead 3
  4. Parking at New York Avenue mile 5.6 directions to trailhead 4
  5. Parking at Front Street mile 5.9 directions to trailhead 5
  6. Parking at Front Street mile 6.1 directions to trailhead 6
  7. Parking at Park Road mile 6.4 · restrooms · water directions to trailhead 7
  8. Parking at Park Road mile 6.5 · restrooms · water directions to trailhead 8
  9. Parking at Park Road mile 6.5 · restrooms · water directions to trailhead 9
  10. Parking at Park Road mile 6.8 directions to trailhead 10
  11. Parking mile 7 directions to trailhead 11
  12. Parking at 114th Street mile 7.4 directions to trailhead 12
  13. Parking mile 7.6 · restrooms directions to trailhead 13
  14. Parking at Railroad Street mile 7.7 directions to trailhead 14
  15. Parking at Casino Center Drive mile 8.2 directions to trailhead 15
  16. Parking mile 8.4 directions to trailhead 16
  17. Parking at East 1st Avenue directions to trailhead 17

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Park Service boundaries.

Marquette Greenway at Whiting Lakefront Park - Whiting, IN - June 2024.jpg (opens in a new tab)
Marquette Greenway at Whiting Lakefront Park - Whiting, IN - June 2024.jpg · Photo: AlphaBeta135 · CC BY 4.0 · Wikimedia Commons

About this trail

The Marquette Greenway is a multi-use trail being assembled along the south shore of Lake Michigan. As planned, it will run about 60 miles from Calumet Park in Chicago east through Northwest Indiana to downtown New Buffalo, Michigan. The Northwestern Indiana Regional Planning Commission (NIRPC) coordinates it with the cities and towns along the route. The greenway became a focal point of the 2005 Marquette Plan, Indiana's lakeshore reinvestment strategy, and was carried forward in a 2009 poster plan and the 2017 Marquette Action Plan. NIRPC reported in February 2024 that 46 miles had been built or funded, with the remaining 14 miles in Gary, Portage and Indiana Dunes National Park.

In Hammond the greenway was completed in 2018 from the Illinois state line, near the former State Line Generating Station, to the Hammond Marina. The sections mapped in this record run through Hammond and Whiting near the lakefront and south through Hammond, with shorter pieces farther east. The greenway is planned to meet the Grand Illinois Trail to the west; the Burnham Greenway, Erie Lackawanna Trail and Dunes-Kankakee Trail to the south; and the Harbor Country trail network in Michigan to the east.

The largest gap is in west Gary, where industry, active railroads and sensitive natural areas leave no straightforward route. NIRPC's 2024 federal grant application proposed a 3.75-mile West Gary Phase from just east of Cline Avenue, where the funded Hammond segment ends on Nature Conservancy land, to Bridge Street, passing under Cline Avenue and crossing the Indiana Toll Road and South Shore Line on a new bridge. A 2021 federal award of $17.8 million was cut to $5.7 million, covering design in Gary, Portage and New Buffalo Township and construction in Michigan City and New Buffalo Township. In December 2023 Indiana's Next Level Trails program granted $5 million for Burns Harbor and almost $2.1 million for Porter. NIRPC hoped to finish the greenway by 2030.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 22% of this route as a trail on former railroad right-of-way.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chicago Midway Airport, 25.3 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333748607181858376634938
Low °F192332415262686659463525
Precipitation, in1.51.51.93.64.143.542.83.52.41.8
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toleston sheet (1:62,500); the 1953 Whiting sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 described riding from Chicago's lakefront through Calumet Park to the old state boundary marker, where the Greenway picks up, then following a paved lakeside trail to Whiting. r/chibike, Aug 2024
  • Two riders in 2024 recommended the Wolf Lake boardwalk, just over the Indiana line, as a picnic or sightseeing stop on the ride south from Chicago. r/chibike, Aug 2024
  • Riders in 2024 said the South Shore Line and Metra take bikes, especially off peak, but advised checking first; one said a refused boarding meant a two-hour wait, so they rode back. r/chibike, Aug 2024
  • One commenter said in November 2025 that opposition in Ogden Dunes blocked a trail through town, leaving a gap a few miles long along a US highway with heavy trucks. r/neoliberal, Nov 2025
3 Reddit threads about this trail, Mar 2024 to Nov 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3487549, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Completing the Vision II: The Marquette Greenway, West Gary Phase — FY 2024 RAISE Project Description, Northwestern Indiana Regional Planning Commission (in.gov) · government source · checked Oct 15, 2026
    Supports: 60 miles from Calumet Park in Chicago to downtown New Buffalo, Michigan; 2005 Marquette Plan, 2009 poster plan, 2017 Marquette Action Plan; 46 miles built or funded as of February 2024, remaining 14 in Gary, Portage and Indiana Dunes National Park; connections to the Grand Illinois Trail, Burnham Greenway, Erie-Lackawanna Trail, Dunes-Kankakee Trail and Harbor Country trail network; West Gary Phase from about 460 feet east of Cline Avenue at the end of the funded Hammond segment on Nature Conservancy land to Bridge Street, about 3.75 miles, under Cline Avenue and over the Indiana Toll Road and South Shore Line; 2021 award of $17.8 million reduced to $5.7 million for design in Gary, Portage and New Buffalo Township and construction in Michigan City and New Buffalo Township
  3. Funding arrangements, planning continue for Marquette Greenway trail — Lakeshore Public Media · organization · checked Oct 15, 2026
    Supports: west Gary has no straightforward route around industry and active railroads, with environmentally sensitive natural areas; December 2023 Next Level Trails grants of $5 million to Burns Harbor and almost $2.1 million to Porter; completion hoped by 2030
  4. More Trail Mileage Opens in The Region — Inside Indiana Business · web · checked Oct 15, 2026
    Supports: July 2018: segment from the Hammond Marina to the Indiana/Illinois state line complete; trailhead near the old State Line Generating Station
  5. Marquette Greenway — OpenStreetMap relation 3487549 · web · checked Oct 15, 2026
    Supports: mapped sections in Hammond and Whiting and shorter pieces farther east

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.