Tomahawk Creek Trail
Greenway in Kansas · OpenStreetMap relation
Runs through Overland Park and Leawood · Johnson County
Conditions now
Loading the weather near Overland Park…
Forecast by the National Weather Service for Overland Park · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Switzer Road mile 3.1 directions to trailhead 1
- Parking at West 135th Street mile 4.6 directions to trailhead 2
- Parking mile 5.4 directions to trailhead 3
- Parking at Nall Avenue mile 7.4 directions to trailhead 4
- Parking at Nall Avenue mile 7.4 directions to trailhead 5
- Parking mile 8.7 directions to trailhead 6
- Parking at West 119th Street mile 8.8 directions to trailhead 7
- Parking at Tomahawk Creek Parkway mile 9 directions to trailhead 8
- Parking at Tomahawk Creek Parkway mile 9.1 directions to trailhead 9
- Parking at Tomahawk Creek Parkway mile 9.9 directions to trailhead 10
- Parking at Tomahawk Creek Parkway mile 10 directions to trailhead 11
About this trail
The Tomahawk Creek Trail is a paved trail of roughly 12 miles in Leawood and Overland Park, Kansas, in Johnson County. OpenStreetMap maps it at about 11.8 miles as a bicycle route, and a hiking guide gives 12 miles. It begins at Leawood City Park and runs southwest, usually beside Tomahawk Creek, to Amesbury Lake Park in Overland Park.
The Tomahawk Creek trail joins the Indian Creek trail system near the confluence of the two creeks, and the trail splits near the entrance of Leawood City Park, one branch continuing north and east and the other following Indian Creek west. Access points listed by the guide include Leawood City Park, Tomahawk Park at 119th Street, 12300 Roe Avenue, I-Lan Park, Beth Torah Park and Amesbury Lake Park. The route passes parks, lakes and a golf course. The guide reports restrooms at Leawood City Park and I-Lan Park and describes the trail as paved with minimal elevation change.
The pages that would name the managing agency, history and closures were not available to automated requests, so those are not stated here.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Olathe 3e, 8 km from the trail's middle, 47 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 44 55 65 74 84 88 87 79 68 54 42 Low °F 20 24 34 44 56 65 69 67 58 47 35 25 Precipitation, in 1.3 1.7 2.5 4.1 5.3 5.2 4.8 4.5 4.2 3 2.4 1.8 Snow, in 3.9 3.3 1.4 0.3 0 0 0 0 0 0.3 1.2 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1887 Olathe sheet (1:125,000); the 1957 Lenexa sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/kansas
Nearby trails
- Indian Creek Trail within 0.2 mi · 22.7 mi, paved
- Eastbrooke Trail 1.1 mi away · 2.0 mi, paved
- Heritage Trail (Olathe) 1.2 mi away · 8.8 mi, paved
- Metcalf Avenue Trail 2.0 mi away · 2.9 mi, paved
- Blue River Greenway Trail 2.6 mi away · 4.3 mi, paved · Missouri
- Blue River Trail 2.9 mi away · 6.1 mi, paved · Missouri
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9725063, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tomahawk Creek Trail: 12 miles of suburban splendor - Kansas City Hiker · web · checked Oct 18, 2026 Supports: length, endpoints, trailheads, restrooms, surface, parks
- Introduction to Tomahawk Creek Trail - Clio · web · checked Oct 18, 2026 Supports: junction with the Indian Creek trail system, split near Leawood City Park
- OpenStreetMap relation 9725063 · web · checked Oct 18, 2026 Supports: route name, mapped length about 11.8 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.