States › Rhode Island

Trestle Trail

Rail-trail in Rhode Island · OpenStreetMap relation

Runs through Greene and Coventry · Kent County

Conditions now

Loading the weather near Greene…

Forecast by the National Weather Service for Greene · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
10.3 mi 16.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Washington Secondary Rail Trail Parking mile 4.7 directions to Washington Secondary Rail Trail Parking
  2. Canoe Parking mile 8.1 directions to Canoe Parking
  3. Parking at Phillips Hill Road mile 8.1 directions to trailhead 3
  4. Washington Secondary Rail Trail Parking mile 8.2 directions to Washington Secondary Rail Trail Parking
  5. Parking at Hill Farm Road mile 8.2 directions to trailhead 5
  6. Parking at Phillips Hill Road mile 8.2 directions to trailhead 6
  7. Washington Secondary Rail Trail Parking mile 9.1 directions to Washington Secondary Rail Trail Parking
  8. Parking at Ayoho Road mile 10.1 directions to trailhead 8
  9. Parking at Ayoho Road mile 10.1 directions to trailhead 9
Trestle Trail drawn on the 1943 USGS topographic map of Putnam, Connecticut
Then: the 1943 USGS Putnam sheet (1:125,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Trestle Trail is the westernmost part of the Washington Secondary Bike Path, the 19-mile rail trail that the Rhode Island Department of Transportation (RIDOT) describes as the state's longest bike path. It lies in western Coventry, Rhode Island; the route mapped here, about 10.4 miles, runs from the Connecticut line at Sterling east to Town Farm Road. The corridor is the Washington Secondary Line, built in the 1840s by the Hartford, Providence and Fishkill Railroad and later operated by the New Haven Railroad as its Willimantic Branch. The Providence and Worcester Railroad acquired the line from Conrail in 1982, and the Rhode Island Department of Environmental Management (DEM) later took ownership of the western Coventry section from Narragansett Electric.

The paved section, opened in 2014 as Trestle Trail East, runs 4.8 miles from Town Farm Road west to Log Bridge Road, just past Route 102 near the Summit General Store. DEM maintains it, interpretive panels describe the former railroad, and an equestrian trail runs from Route 117 at Old Main Street to Log Bridge Road. East of Town Farm Road the path continues as the Coventry Greenway toward Cranston. West of Log Bridge Road an unpaved section continues past the Moosup River bridge to an access area at Route 14A in Sterling, Connecticut, where the railbed becomes the Moosup Valley State Park Trail.

The Trestle Trail has the greatest elevation change on the Washington Secondary corridor. The western section has a compacted gravel surface. A RIDOT and DEM project from 2018 to 2020 closed it to rehabilitate two bridges and replace culverts, including two granite culverts replaced by a single precast concrete culvert to address beaver flooding and erosion. Paving of the gravel section was in design in 2018, but RIDOT now says it is subject to a cost and readiness review and is not scheduled, and it lists rehabilitation of old rail bridges there as ongoing.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

76% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
N Foster 1 E, 18.7 km from the trail's middle, 49 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353846586876807972615040
Low °F182027374656616053423324
Precipitation, in4.53.95.24.73.84.53.64.54.454.55.2
Snow, in15.515.613.42.6000000.5212.4
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kent sheet (1:62,500); the 1955 Coventry Center sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

5 Reddit threads about this trail, Mar 2024 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5446564, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Washington Secondary Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026
    Supports: 19 miles, state's longest bike path, segment names west to east, Providence Hartford and Fishkill corridor, 2014 Trestle Trail East Town Farm Road to Log Bridge Road 4.8 mi, Log Bridge Road past Route 102 near Summit General Store, interpretive panels, equestrian trail Route 117–Log Bridge Road, DEM maintenance west of Town Farm Road, greatest elevation change on Trestle Trail, gravel section paving not scheduled pending cost and readiness review, ongoing rail bridge rehabilitation
  3. The Coventry Greenway — Town of Coventry, RI · government source · checked Oct 13, 2026
    Supports: Washington Secondary Line built in the 1840s by the Hartford, Providence and Fishkill Railroad, New Haven Railroad Willimantic Branch, P&W acquired from Conrail 1982, DEM ownership of the western Coventry section (Trestle Trail) from Narragansett Electric, corridor extends to the Connecticut border
  4. Trestle Trail News, August 10, 2018 — Rhode Island Department of Transportation · government source · checked Oct 13, 2026
    Supports: RIDOT work on the undeveloped segment, two bridges rehabilitated, culvert replaced, closure, access at Route 14A in Sterling, Conn., paved section opened 2014, paving a separate project in design
  5. Reconstruction of Culverts Under Trestle Trail Underway (July 25, 2019) — RI.gov / DEM · government source · checked Oct 13, 2026
    Supports: closure from the Connecticut Route 14A access area to the Moosup River bridge, compacted gravel trail top, two granite culverts replaced with one precast concrete culvert because of beaver flooding and erosion, completion expected January 2020
  6. Moosup Valley State Park Trail — Connecticut State Parks and Forests (CT DEEP) · government source · checked Oct 13, 2026
    Supports: Connecticut continuation from the Rhode Island border

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.