States › Texas

Trinity Forest Spine Trail

Greenway in Texas · OpenStreetMap relation

Runs through Dallas · Dallas County

Conditions now

Loading the weather near Dallas…

Forecast by the National Weather Service for Dallas · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Valleyglen Drive mile 0.9 directions to trailhead 1
Railroad Bridge over White Rock Creek, Dallas, Texas 1303261133BW (opens in a new tab)
Railroad Bridge over White Rock Creek, Dallas, Texas 1303261133BW · Photo: Patrick Feller · CC BY · Flickr

About this trail

The Trinity Forest Spine Trail is a paved trail being built in eastern and southern Dallas, Texas, as a nine-mile corridor linking White Rock Lake with the Great Trinity Forest and the Trinity River Audubon Center. It is a project of The Loop Dallas, which is assembling a 50-mile trail circuit around the city, working with the Dallas Park and Recreation Department, Dallas County, TxDOT and the North Central Texas Council of Governments. It is planned in five phases and serves neighborhoods along White Rock Creek rather than a railroad.

Construction of the first phase began on September 30, 2021, and it opened in fall 2023. It runs from the Santa Fe Trail just north of Tenison Park Golf Course in East Dallas to Samuell Boulevard, just north of I-30, passing under a historic railroad trestle south of the White Rock Lake spillway. The second phase, built with TxDOT leading construction, opened in Pleasant Grove in April 2026: a one-mile elevated trail alongside US-175 and a new Lake June Road bridge with bike lanes and wide sidewalks, reaching the Lake June DART station and joining the AT&T and Trinity Forest trails. A $12 million federal RAISE grant and $18 million from TxDOT, the city and Dallas County paid for that phase.

This record maps about 3.1 miles in pieces: about 2 miles at the northern end and about 1.1 miles farther south. In May 2026 the Dallas City Council approved a $16 million construction award for the third phase, which will extend the trail toward the 110-acre Parkdale Lake from both ends to close the gap between Samuell Boulevard and the Lawnview DART station. In December 2025 The Loop Dallas announced a $10.9 million award from the Texas Transportation Commission for a segment with a 1,200-foot pedestrian bridge over the Union Pacific line to Parkdale Lake, backed by $3 million in 2024 city bond funds.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dallas Love Field, 13.6 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586270778593979790806859
Low °F384249576674787770594840
Precipitation, in2.62.83.53.14.63.81.72.23.14.82.93.2
Snow, in0.10.90.300000000.10.3
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1957 White Rock Lake sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders between 2023 and 2026 who came south from White Rock Lake said the paved trail stopped at Samuell Boulevard, with no visible continuation toward Lawnview Station, despite maps suggesting otherwise. r/Dallas, Dec 2023 · r/dfwbike, Apr 2026 · r/Dallas, Apr 2026
  • In 2026 riders said getting between the two built pieces meant dirt paths behind Lawnview station, quiet streets, or taking the train from Fair Park to Lake June after riding the Santa Fe Trail. r/dfwbike, Apr 2026 · r/Dallas, Apr 2026
  • Riders in April 2026 complained that official maps did not show which Loop segments were open, and pointed to OpenStreetMap-based maps and a rider-made map instead. r/Dallas, Apr 2026
  • One rider in late 2026 reported work at the Samuell Boulevard end: drilling equipment arriving for bridge piers, then concrete poured for piers planned to carry the trail beneath Samuell and I-30. r/dfwbike, Oct 2026 · r/dfwbike, Nov 2026
7 Reddit threads about this trail, Dec 2023 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17696336, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Trinity Forest Spine Trail — The Loop Dallas · organization · checked Oct 15, 2026
    Supports: nine-mile length, five phases, White Rock Lake to Trinity River Audubon Center, Phase I route (Santa Fe Trail near Tenison Park Golf Course to Samuell Boulevard), railroad trestle near spillway, Phase II elevated trail along US-175 and Lake June Road bridge, Lake June DART station, AT&T and Trinity Forest trail connections, $12M RAISE grant and $18M partner funds
  4. Trinity Forest Spine Trail - North Phase — The Loop Dallas · organization · checked Oct 15, 2026
    Supports: construction start September 30, 2021; Phase 1 opened fall 2023
  5. Connecting Our Community Through the Trinity Forest Spine Trail — The Loop Dallas · organization · checked Oct 15, 2026
    Supports: partners (Dallas Park and Recreation Department, Dallas County, TxDOT, NCTCOG), TxDOT leading Phase II construction, Pleasant Grove, neighborhoods along White Rock Creek, Great Trinity Forest
  6. The Loop Dallas Secures $10.9M TxDOT Award — The Loop Dallas · organization · checked Oct 15, 2026
    Supports: December 2025 Texas Transportation Commission award of $10.9 million, 1,200-foot bridge over the UP rail line, Parkdale Lake, $3 million 2024 bond funds, 50-mile circuit
  7. New Dallas trail project unlocks hidden Parkdale Lake — NBC 5 Dallas-Fort Worth · web · checked Oct 15, 2026
    Supports: Phase II opened April 2026; May 2026 council approval of $16 million Phase III award; extension toward 110-acre Parkdale Lake from north and south between Samuell Boulevard and the Lawnview DART station

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.