States › New Jersey

Trolley Line Trail

Trolley trail in New Jersey

Runs through West Windsor Township · Mercer County

Conditions now

Loading the weather near Princeton Junction…

Forecast by the National Weather Service for Princeton Junction · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bernt Midland Boulevard mile 1.8 · restrooms directions to trailhead 1
  2. Parking at Bernt Midland Boulevard mile 1.8 · restrooms directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Trolley Line Trail drawn on the 1954 USGS topographic map of Hightstown, New Jersey
Then: the 1954 USGS Hightstown sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Trolley Line Trail is a paved path of about 2.8 miles in West Windsor Township, Mercer County, New Jersey, between Rabbit Hill Road and Village Road West; 2.6 miles are mapped here. It lies beneath PSE&G power lines on the bed of the Fast Line, the electric line that connected Trenton and New Brunswick early in the 20th century. The Trenton and New Brunswick Railroad opened from Trenton to Milltown on May 13, 1904, and became part of Public Service's Newark–Trenton Fast Line; service south of New Brunswick ended on January 16, 1936, and the right-of-way now carries high-voltage power lines.

The trail runs in a straight line, crosses Big Bear Brook on a bridge and passes through West Windsor Community Park, then continues behind residential neighborhoods and beside undeveloped wetlands. A 2014 description put its end at Penn Lyle Road, 2.5 miles from Rabbit Hill Road; current listings carry it on to Village Road West.

The asphalt path is flat, wheelchair accessible and bordered by mowed grass, with signs at each end, ground plaques every half mile and a map at the Bernt Midland Boulevard crossing. It is used for walking, biking, inline skating and cross-country skiing, and leashed dogs are allowed. Parking is only in West Windsor Community Park, entered from Route 571 by Bernt Midland Boulevard; there is none at either end. The park has restrooms, picnic areas, play equipment, sports fields, the Community Waterworks pools and a skateboard park.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hightstown 2 W, 5.4 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404351637382878578665546
Low °F212330394858636154423327
Precipitation, in3.52.64.33.74.14.64.84.34.243.34.2
Snow, in5.884.60.60000000.34.4
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Princeton sheet (1:62,500); the 1954 Hightstown sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Newark–Trenton Fast Line — Wikipedia · organization · checked Oct 14, 2026
    Supports: Trenton and New Brunswick Railroad opened Trenton–Milltown May 13, 1904, Public Service Fast Line, service south of New Brunswick ended January 16, 1936, right-of-way now used for high-voltage power lines
  3. Trolley Line Trail — New Jersey Trails Association · organization · checked Oct 14, 2026
    Supports: 2.5-mile straight paved path from Rabbit Hill Road to Penn Lyle Road (2014), under PSE&G power lines, bed of the Fast Line between Trenton and New Brunswick, through West Windsor Community Park, behind residential areas and beside wetlands, Big Bear Brook crossing, mowed grass, signs at each end, plaques every half mile, map at Bernt Midland Blvd, leashed dogs, wheelchair accessible, parking only in the park via Bernt Midland Blvd from Route 571, park amenities
  4. Trolley Line Trail (NJ) — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 14, 2026
    Supports: 2.8 miles, Rabbit Hill Rd. to Village Rd. W, asphalt, biking, inline skating, walking, cross-country skiing, wheelchair accessible, no parking at either end

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.