States › Michigan

Troy Trails

Greenway in Michigan

Runs through Troy · Oakland County

Conditions now

Loading the weather near Troy…

Forecast by the National Weather Service for Troy · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Livernois Road mile 0 · restrooms · water directions to trailhead 1
  2. Parking at Timberview Drive mile 0 directions to trailhead 2
  3. Parking at Livernois Road mile 0.1 · restrooms · water directions to trailhead 3
  4. Parking at Westmoreland Drive mile 2.7 directions to trailhead 4
  5. Parking at Westmoreland Drive mile 2.8 directions to trailhead 5
Troy, along the trail (opens in a new tab)
Troy, along the trail · Photo: Cadiomals · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Troy Trails is the City of Troy's name for a paved, non-motorized trail built in phases through its parks, in Oakland County, Michigan. The city's Troy Trails page describes three phases, each a segment of the Troy Trail. Phase One is a roughly one-mile (1.6 km) asphalt pathway through P. Terry & Barbara Knight Park, at 3401 Livernois, that connects the Civic Center Campus to the Troy Historic Village. Phase Two is a roughly 0.75-mile (1.2 km) asphalt pathway within Sylvan Glen Lake Park. Phase Three is a 0.80-mile (1.3 km) paved pathway with a bridge crossing in Jaycee Park, at 1755 E. Long Lake Road. The city says all Troy Trails are maintained in winter for year-round non-motorized use.

Metromode reported in 2018 that the first trail, 1.3 miles (2.1 km) of asphalt from the Troy Town Center through Knight Park and past Wattles Road to the Troy Historic Village, already had bikers and walkers on it as each section of asphalt was poured, with a grand opening planned for August 1 of that year. The mapped line, about 1.7 miles (2.8 km), is in two separate pieces about 1.8 miles (2.9 km) apart: one at Knight Park, Phase One, and one in Jaycee Park, Phase Three. The Sylvan Glen path, Phase Two, is not part of it. OpenStreetMap tags both pieces as asphalt cycleways with bicycles and pedestrians designated.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pontiac Wwtp, 11.5 km from the trail's middle, 67 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444586978828174604736
Low °F171826364959636254423224
Precipitation, in2.21.92.22.93.83.33.13.22.92.93.12.2
Snow, in12.194.10.9000000.11.78.1
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Rochester sheet (1:62,500); the 1952 Birmingham sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Troy Trails — City of Troy Parks and Recreation · government source · checked Oct 31, 2026
    Supports: three phases, each called a segment of the Troy Trail, with locations, lengths and surfaces (Phase One, Knight Park / Daisy Knight Dog Park, 3401 Livernois, about one mile asphalt; Phase Two, Sylvan Glen Lake Park, about 0.75 mile asphalt; Phase Three, Jaycee Park, 1755 E Long Lake Rd, 0.80 mile paved with a bridge crossing); Phase One connects the Civic Center Campus to the Troy Historic Village; winter maintenance of all Troy Trails for year-round non-motorized use
  3. Troy Trails & Pathways — Metromode (July 12, 2018) · web · checked Oct 31, 2026
    Supports: 1.3-mile asphalt trail from the Troy Town Center through P. Terry & Barbara Knight Park, past Wattles Road, to Troy Historic Village; bikers and walkers on the heels of construction workers as each section of asphalt was poured; celebration planned for Wednesday, Aug. 1
  4. Troy Trails — OpenStreetMap way 965792898 (Knight Park piece) · web · checked Oct 31, 2026
    Supports: name Troy Trails; highway=cycleway, surface=asphalt, bicycle=designated, foot=designated
  5. Troy Trails — OpenStreetMap way 465538675 (Jaycee Park piece) · web · checked Oct 31, 2026
    Supports: name Troy Trails; highway=cycleway, surface=asphalt, bicycle=designated, foot=designated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.