States › Arkansas

Tsa-La-Gi Trail

Greenway in Arkansas · OpenStreetMap relation

Runs through Fayetteville · Washington County

Conditions now

Loading the weather near Fayetteville…

Forecast by the National Weather Service for Fayetteville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.6 mi 2.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Martin Luther King Junior Boulevard mile 0.6 directions to trailhead 1
  2. Parking at West Martin Luther King Junior Boulevard mile 0.7 directions to trailhead 2
  3. Parking at West Martin Luther King Junior Boulevard mile 0.7 directions to trailhead 3
  4. Parking at West Indian Trail mile 0.7 directions to trailhead 4
  5. Parking at West Indian Trail mile 0.7 directions to trailhead 5
Tsa-La-Gi Trail (opens in a new tab)
Photo: jpinar · CC BY-SA 4.0 · Mapillary

About this trail

The Tsa-La-Gi Trail is a paved path of about 1.6 miles in Fayetteville, Arkansas, mapped in OpenStreetMap as part of the city's bicycle network. It runs beside Martin Luther King Jr. Boulevard on the south side, east of Interstate 49, and links student housing developments to the Frisco Trail. The name is the word for "Cherokee" in the tribe's language.

A 1.8-mile stretch was reported nearing completion in 2014. At that time, extending the trail west of I-49 depended on the Arkansas Highway and Transportation Department's redesign of the Martin Luther King Jr. Boulevard interchange, and city officials had asked for a separated path on the street's south side.

Experience Fayetteville describes the trail as part of a 7-mile paved loop: riders join it from the Razorback Regional Greenway, follow it west, and meet the Town Branch Trail further along. The 40-mile greenway, dedicated May 2, 2015, runs from Fayetteville to Bella Vista.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April, June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fayetteville Exp Stn, 5.2 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465159697684898981715950
Low °F273038475666696860483830
Precipitation, in2.62.33.74.564.73.63.44.5442.9
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1958 Fayetteville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Tsa-La-Gi Trail (opens in a new tab)
  1. 360° view 1 of 3, photo by jpinar
  2. 360° view 2 of 3, photo by jpinar
  3. 360° view 3 of 3, photo by jpinar
360° panorama · Photo: jpinar · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10772747, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Razorback Regional Greenway - Wikipedia · organization · checked Oct 18, 2026
    Supports: greenway length of about 40 miles, route, May 2, 2015 dedication
  3. Fayetteville trails head south, southwest - Northwest Arkansas Democrat-Gazette · web · checked Oct 18, 2026
    Supports: 1.8-mile stretch nearing completion in 2014, student housing link to Frisco Trail, name meaning, I-49 extension dependence
  4. Chasing Squirrels Bike Route - Experience Fayetteville · web · checked Oct 18, 2026
    Supports: paved surface, route from the greenway, meeting the Town Branch Trail, 7-mile loop
  5. OpenStreetMap relation 10772747 · web · checked Oct 18, 2026
    Supports: trail name, route, mapped length and surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.