Turkey Creek Trail
Greenway in Missouri
Runs through Joplin · Jasper County
Conditions now
Loading the weather near Joplin…
Forecast by the National Weather Service for Joplin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Turkey Creek Trail is a paved trail of about 1.5 miles in Joplin, Missouri, just east of the Frisco Greenway Trail. Visit Joplin describes it as paved and hilly in places, with single-track trails branching off the main path. Parking is at North Florida Avenue and Newman Road.
The Frisco Greenway Trail, about 3.5 miles on a converted railroad line, is mostly crushed gravel, and has a paved spur that follows Turkey Creek. OpenStreetMap maps the Turkey Creek Trail as about 1.4 miles (2.3 km) of paved path.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Joplin Regional Airport, 5.1 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 45 50 60 69 77 86 90 90 82 71 58 48 Low °F 25 29 37 47 56 65 70 68 59 48 37 28 Precipitation, in 1.9 2 3.3 5 6.6 5.6 4 3.4 4.2 3.8 3.3 2.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Carthage sheet (1:125,000); the 1963 Joplin East sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Frisco Greenway Trail within 0.2 mi · 4.2 mi, gravel
- Thom Station Trail 4.2 mi away · 1.6 mi, surface unknown
- City Metro Trail 4.7 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The Girlfriend's Guide to Joplin Trails — Visit Joplin · web · checked Oct 17, 2026 Supports: length, surface, location, parking, Frisco Greenway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.