Twin Cities Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Fitchburg and Leominster · Worcester County
Conditions now
Loading the weather near Leominster…
Forecast by the National Weather Service for Leominster · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Water Street mile 0 directions to trailhead 1
- Parking at Mechanic Street mile 0 directions to trailhead 2
- Parking at Columbia Street mile 0.1 directions to trailhead 3
- Parking at Main Street mile 0.1 directions to trailhead 4
- Parking at Columbia Street mile 0.1 directions to trailhead 5
- Parking at Columbia Street mile 0.1 directions to trailhead 6
- Parking at Main Street mile 0.1 directions to trailhead 7
- Parking at Main Street mile 0.1 directions to trailhead 8
- Parking at Main Street mile 0.2 directions to trailhead 9
- Parking at Main Street mile 0.2 directions to trailhead 10
- Parking at Walnut Street mile 0.3 directions to trailhead 11
- Parking at Main Street mile 0.3 directions to trailhead 12
- Parking at High Street mile 0.3 directions to trailhead 13
- Parking at North Main Street mile 0.4 directions to trailhead 14
- Parking at North Main Street mile 0.4 directions to trailhead 15
- Parking at North Main Street mile 0.5 directions to trailhead 16
- Parking at North Main Street mile 0.5 directions to trailhead 17
- Parking at Green Street mile 0.6 directions to trailhead 18
- Parking at North Main Street mile 0.6 directions to trailhead 19
- Parking at North Main Street mile 0.6 directions to trailhead 20
- Parking at North Main Street mile 0.7 directions to trailhead 21
- Parking at North Main Street mile 0.7 directions to trailhead 22
- Parking at North Main Street mile 0.8 directions to trailhead 23
- Parking at Hammond Street mile 0.8 directions to trailhead 24
- Parking at North Main Street mile 1 directions to trailhead 25
- Parking at Water Tower Place mile 1.1 directions to trailhead 26
- Parking at North Main Street mile 1.1 directions to trailhead 27
- Parking at Nelson Street mile 1.1 directions to trailhead 28
- Parking at Fruit Street mile 1.2 directions to trailhead 29
- Parking at North Main Street mile 1.2 directions to trailhead 30
- Parking at Lindell Avenue mile 1.3 directions to trailhead 31
- Parking at Erdman Way mile 1.5 directions to trailhead 32
- Parking at Erdman Way mile 1.6 directions to trailhead 33
- Parking at Erdman Way mile 1.6 directions to trailhead 34
- Parking at State Street mile 2.2 directions to trailhead 35
- Parking at State Street mile 2.3 directions to trailhead 36
- Parking at State Street mile 2.3 directions to trailhead 37
- Parking at State Street mile 2.3 directions to trailhead 38
- Parking at State Street mile 2.3 directions to trailhead 39
- Parking at State Street mile 2.3 directions to trailhead 40
- Parking at Holman Avenue mile 2.4 directions to trailhead 41
- Parking at Nichols Street mile 2.5 directions to trailhead 42
- Parking at Wanoosnoc Road mile 3.1 directions to trailhead 43
- Parking at Wanoosnoc Road mile 3.1 directions to trailhead 44
- Parking at Middle Street mile 4 directions to trailhead 45
- Parking at Water Street Lane mile 4.1 directions to trailhead 46
- Parking at Middle Street Lane mile 4.1 directions to trailhead 47
- Parking at Second Street mile 4.2 directions to trailhead 48
- Parking at Granite Street mile 4.2 directions to trailhead 49
- Parking at Second Street mile 4.2 directions to trailhead 50
- Parking at Middle Street Lane mile 4.2 directions to trailhead 51
- Parking at Water Street Lane mile 4.2 directions to trailhead 52
- Parking at Water Street Lane mile 4.2 directions to trailhead 53
- Parking at Granite Street mile 4.2 directions to trailhead 54
- Parking at First Street mile 4.3 directions to trailhead 55
- Parking at Sawyer Passway mile 4.3 directions to trailhead 56
(opens in a new tab) About this trail
The Twin Cities Rail Trail is a paved rail trail of about 4.3 miles between the downtowns of Leominster and Fitchburg, Massachusetts. It follows the abandoned Leominster–Fitchburg section of the Fitchburg and Worcester Railroad, which was chartered in 1840 and opened on February 11, 1850 over 18 miles from Fitchburg through Leominster and Sterling to Sterling Junction; the line later passed to the Old Colony, the New Haven, Penn Central, Conrail and CSX. The cities own the right-of-way, and the Twin Cities Rail Trail Association, formed in 2004, maintains the trail with its own non-municipal funding.
In 2004 Congressman John W. Olver secured $4 million in federal funding for the trail. Phase One, from Carter Park in Leominster to First Street in Fitchburg, opened in the summer of 2022. Its last element, a bicycle and pedestrian bridge over Route 2 in Leominster, was completed and dedicated to Olver on August 3, 2024; Phase One cost $8.5 million, 80 percent of it federal. On November 14, 2025 a ribbon-cutting at Water Street and Depot Square in Leominster marked the completion of Phase III, which links Carter Park with the old Leominster train depot.
The trail is asphalt, and the association began plowing it in its first winter, 2022–23. MassDOT's plans for the Fitchburg end, announced in August 2024, extend the trail from the Phase One terminus to the intermodal transportation center in downtown Fitchburg as a 12-foot paved path with two new structures and signalized crossings. In 2025 the association said its next project would connect the trail with the Sterling section of the Mass Central Rail Trail.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fitchburg Municipal Airport, 1.1 km from the trail's middle, 16 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 45 58 70 78 83 82 74 62 50 40 Low °F 16 17 25 35 46 56 62 60 51 40 30 22 Precipitation, in 2.6 2.8 3.8 3.8 3.6 4.1 3.5 3.4 4 4.5 3.6 3.7 - On the National Register
- Monument Square Historic District, Leominster · historic district, listed 1982 · nomination file for Monument Square Historic District
- Whitney, F. A., Carriage Company Complex Historic District, Leominster · historic district, listed 1988 · nomination file for Whitney, F. A., Carriage Company Complex Historic District
- W. S. Reed Toy Company-Wachusett Shirt Company Historic District, Leominster · historic district, listed 2021
- Pine Grove Cemetery, Leominster · site, listed 2008 · nomination file for Pine Grove Cemetery
- Old maps
USGS topographic maps of the trail's middle go back to the 1887 Fitchburg sheet (1:62,500); the 1954 Fitchburg sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationTwin Cities Rail Trail Association
- FacebookTwin Cities Rail Trail (Facebook)
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13999887, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Healey-Driscoll Administration Celebrates Route 2 Multimodal Bridge — MassDOT press release, Mass.gov (August 3, 2024) · government source · checked Oct 13, 2026 Supports: Route 2 bridge completed and dedicated to John W. Olver, association maintenance with non-municipal funding, Phase One from Carter Park to First Street complete, $8.5 million at 80 percent federal, Phase Two plans to the Fitchburg intermodal facility with a 12-foot paved path, crossings and two new structures
- Fitchburg and Worcester Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 1840 charter, February 11, 1850 opening, 18-mile route through Leominster and Sterling, later owners, abandonment between Leominster and Fitchburg
- Twin Cities Rail Trail — Freedom's Way National Heritage Area · organization · checked Oct 13, 2026 Supports: association established 2004, Olver's $4 million in 2004, Phase One endpoints
- Leominster and Fitchburg's New Rail Trail Gets Creative with Winter Maintenance — Streetsblog Massachusetts (January 27, 2023) · press · checked Oct 13, 2026 Supports: Phase One opened summer 2022, cities own the right-of-way, association maintenance, first-winter plowing, asphalt surface
- Twin Cities Rail Trail Phase III completed, connects cities' downtowns — Sentinel & Enterprise (November 19, 2025) · web · checked Oct 13, 2026 Supports: November 14, 2025 ribbon-cutting at Water Street and Depot Square, Carter Park to old Leominster depot, planned connection to the Mass Central Rail Trail in Sterling
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.