Union Chapel Road Trail
Greenway in Indiana
In Allen County
Conditions now
Loading the weather near Fort Wayne…
Forecast by the National Weather Service for Fort Wayne · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Union Chapel Road Trail is a paved path along Union Chapel Road in Allen County, Indiana, being built in phases. Fort Wayne Trails, which acts as partner and project coordinator for Allen County trail projects, lists the project owners as Allen County and the City of Fort Wayne. The full Union Chapel Trail from Auburn Road to Corbin Road is planned as a 1.5-mile, 10-foot trail on the north side of the road, running from the existing trail west of Auburn Road to the Life Bridge Church Trailhead and the Pufferbelly Trail just west of Corbin Road. Parkview donated $90,000 toward construction, and Northwest Allen County Schools voted in January 2025 to donate remaining right of way to the county.
Phase 1, a 0.68-mile stretch from the Pufferbelly Trail at Life Bridge Church to Coldwater Road, opened with a ribbon cutting reported on October 9, 2026, along with a sidewalk connection to Maple Creek Middle School. Construction of phase 2, from Coldwater Road to Auburn Road, is planned for 2027. Future phases are meant to extend the trail to Metea Park and the Cedar Creek Parks Trail. OpenStreetMap maps the path as asphalt, open to bicycles and pedestrians.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Garrett 1 S, 15.2 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 34 46 59 70 78 81 79 73 61 47 35 Low °F 16 19 27 37 48 57 60 58 51 41 31 22 Precipitation, in 2.5 2.3 2.7 4 4.7 4 3.5 3.9 3.2 3 3.1 2.6 Snow, in 10.6 9.7 4.8 1.2 0 0 0 0 0 0.1 2.5 7.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1956 Cedarville sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFort Wayne Trails — Union Chapel Trail project
Nearby trails
- Diebold Road Trail within 0.2 mi · 1.7 mi, paved
- Parkview Trail within 0.2 mi · 2.2 mi, paved
- Pufferbelly Trail 1.4 mi away · 12.9 mi, paved
- Dupont Road Trail 1.4 mi away · 4.1 mi, paved
- Gump Road Trail 2.0 mi away · 1.5 mi, paved
- Cedar Creek Parks Trail 2.5 mi away · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Union Chapel Trail: Auburn Road to Corbin Road — Fort Wayne Trails · organization · checked Oct 18, 2026 Supports: 1.5 miles, 10-foot trail on the north side; Auburn Road to Corbin Road; project owners; Parkview $90,000; January 2025 right-of-way donation; two phases
- Newest Section of Union Chapel Trail Celebrated with Ribbon Cutting — Fort Wayne Trails · organization · checked Oct 18, 2026 Supports: 0.68-mile phase 1 from Pufferbelly Trail at Life Bridge Church to Coldwater Road; school sidewalk connection; phase 2 construction planned for 2027; future extension to Metea Park and the Cedar Creek Parks Trail
- OpenStreetMap way 480573925 (Union Chapel Road Trail) — OpenStreetMap contributors · web · checked Oct 18, 2026 Supports: name; asphalt; bicycle and foot designated
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.