States › Kansas

Välkommen Trail

Rail-trail in Kansas · OpenStreetMap relation

Runs through Lindsborg · McPherson County

Conditions now

Loading the weather near Lindsborg…

Forecast by the National Weather Service for Lindsborg · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.6 mi 5.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Välkommen Trail Bethany Drive Trailhead mile 0 directions to Välkommen Trail Bethany Drive Trailhead
  2. Välkommen Trail Bethany Drive Trailhead Parking mile 0 directions to Välkommen Trail Bethany Drive Trailhead Parking
  3. Parking at North Kansas Street mile 1.5 directions to trailhead 3
  4. Parking at North Kansas Street mile 1.5 directions to trailhead 4
  5. Välkommen Trail East Lindsborg Street Trailhead mile 2.2 directions to Välkommen Trail East Lindsborg Street Trailhead
  6. Parking at South 1st Street mile 2.4 · restrooms directions to trailhead 6
Smoky Hill River Bridge (Lindsborg, Kansas), beside the trail (opens in a new tab)
Smoky Hill River Bridge (Lindsborg, Kansas), beside the trail · Photo: mom and dad · CC BY 2.0 · Wikimedia Commons

About this trail

The Välkommen Trail is a paved bicycle and pedestrian path in Lindsborg, Kansas, built on former rail corridors. The City of Lindsborg says the trail was converted from the abandoned Missouri-Pacific and Union Pacific rail beds and opened on July 29, 2006. The city and the Lindsborg Convention & Visitors Bureau both give its length as about 4.5 miles; the OpenStreetMap route relation is mapped at about 3.6 miles.

The trail winds through town and crosses a refurbished railroad bridge at its southern end, which the visitors bureau describes as a place to take in the sounds and sights of nature. OpenStreetMap marks trailheads with parking at Bethany Drive at the northern end and at East Lindsborg Street about 1.4 miles along the route. The city's master plan includes further phases of the trail, among them a skate park alongside it.

The city describes the trail as all-weather and free for public use year round. Neither the city nor the visitors bureau page states daily hours, and a 2024 trail map is linked from the visitors bureau page.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Salina Municipal Airport, 24.9 km from the trail's middle, 19 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414657677788939082695543
Low °F202433425364696758453223
Precipitation, in0.70.91.82.753.83.93.72.62.21.21.1
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Salina sheet (1:125,000); the 1965 Lindsborg sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 8203675, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Välkommen Trail — City of Lindsborg · organization · checked Oct 18, 2026
    Supports: opening date July 29, 2006; conversion from Missouri-Pacific and Union Pacific rail beds; about 4.5 miles; free year-round use; master plan phases including a skate park
  3. Välkommen Trail — Visit Lindsborg · web · checked Oct 18, 2026
    Supports: 4.5 miles; all-weather bicycle and pedestrian path; refurbished railroad bridge at the southern end; 2024 trail map
  4. OpenStreetMap relation 8203675 · web · checked Oct 18, 2026
    Supports: mapped length, trailhead locations at Bethany Drive and East Lindsborg Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.