States › Washington

Vantage Highway Pathway

Greenway in Washington

Runs through Richland · Benton County

Conditions now

Loading the weather near Richland…

Forecast by the National Weather Service for Richland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.1 mi 3.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Henderson Loop mile 0.8 directions to trailhead 1
  2. Parking at Henderson Loop mile 0.8 directions to trailhead 2
  3. Parking at Henderson Loop mile 0.8 directions to trailhead 3
  4. Parking at Vantage Highway mile 0.8 directions to trailhead 4
  5. Parking at Henderson Loop mile 0.8 directions to trailhead 5
  6. Parking at Vantage Highway mile 0.8 directions to trailhead 6
  7. Parking at Logston Boulevard mile 0.8 directions to trailhead 7
  8. Parking at Logston Boulevard mile 0.8 directions to trailhead 8
  9. Parking at Kingsgate Way mile 1.7 directions to trailhead 9
  10. Parking mile 2.1 directions to trailhead 10
Vantage Highway Pathway (opens in a new tab)
Photo: watmildon · CC BY-SA 4.0 · Mapillary

About this trail

The Vantage Highway Pathway is a paved shared-use path in the Horn Rapids area of Richland, Washington. OpenStreetMap names the way Vantage Highway Pathway and maps it as an asphalt cycleway designated for bicycles and pedestrians; the mapped line covers about 2.1 miles (3.3 km). In May 2023 the Tri-Cities Area Journal of Business reported that the pathway for bicyclists and pedestrians then ran north of Highway 240 between Hagen Road and Kingsgate Drive and was to be connected to Stevens Drive that summer. The Benton-Franklin Council of Governments' 2023 obligation report lists a Richland project, Vantage Highway Path – Phase 2, with construction funds obligated that year (STBG and TAP programs, $204,302 and $295,459).

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Richland, 3.3 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414857657480898879644940
Low °F293035414854605951423428
Precipitation, in10.70.60.60.60.60.20.10.30.50.91.1
Old maps

USGS topographic maps of the trail's middle go back to the 1917 Pasco sheet (1:125,000); the 1951 Richland sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 2023 Calendar Year Project Obligation Report — Benton-Franklin Council of Governments (hosted by WSDOT) · government source · checked Oct 31, 2026
    Supports: Table 3 lists Richland project Vantage Highway Path – Phase 2 (STIP ID R018) with construction (CN) obligations of $204,302 (STBG) and $295,459 (TAP) in the 2023 federal fiscal year
  3. Roadway improvements in full swing across Tri-Cities — Tri-Cities Area Journal of Business · press · checked Oct 31, 2026
    Supports: May 11, 2023 article: in its Richland section, the Vantage Highway Pathway for bicyclists and pedestrians then ran north of Highway 240 between Hagen Road and Kingsgate Drive near Horn Rapids and was to be connected to Stevens Drive that summer
  4. Vantage Highway Pathway (way 703298369) — OpenStreetMap · web · checked Oct 31, 2026
    Supports: name Vantage Highway Pathway; highway=cycleway, bicycle=designated, foot=designated, segregated=no, surface=asphalt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.