Vassar Rail Trail
Rail-trail in Michigan
Runs through Vassar · Tuscola County
Conditions now
Loading the weather near Vassar…
Forecast by the National Weather Service for Vassar · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Oak Street mile 0 directions to trailhead 1
- Parking at North Cass Avenue mile 0 directions to trailhead 2
- Parking at East Spring Street mile 0.1 directions to trailhead 3
- Parking at South Cass Avenue mile 0.1 directions to trailhead 4
- Parking at South Water Street mile 0.1 directions to trailhead 5
- Parking at South West Street mile 0.5 directions to trailhead 6
- Parking at South West Street mile 0.5 directions to trailhead 7
- Parking at South West Street mile 0.5 directions to trailhead 8
- Parking at South West Street mile 0.5 directions to trailhead 9
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Vassar Rail Trail is an asphalt path in Vassar, a city of 2,727 people (2020 census) on the Cass River in Tuscola County, Michigan. A 2025 Tuscola Today guide to the county's trails describes it as a two-mile stretch of asphalt in town for biking, walking, inline skating and cross-country skiing, wheelchair accessible and used in every season. Vassar, founded in 1849, grew as a lumbering town at the crossing of the Michigan Central's Bay City Branch and the Port Huron & Northwestern (later Pere Marquette) line between Saginaw and Port Huron.
TrailLink lists the trail's ends as Canterbury Court, south of King James Court, and Goodrich Street (M-15) at Proctor Street. The section on a former railroad corridor runs along the west bank of the Cass River. At the end of South Cass Avenue is the Townsend North Pavilion and park; west of the park the trail climbs gently through woods to a neighborhood near active railroad tracks.
To the east, the route crosses the Cass River on the East Huron Avenue (M-15) bridge and runs south along South Water Street and Proctor Street to a supermarket. Parking is at the southern end of South Cass Avenue.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Vassar, 0.6 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 43 57 69 78 82 80 74 61 47 35 Low °F 12 13 21 32 43 53 57 56 48 38 29 22 Precipitation, in 2 1.4 1.9 3.3 3.5 3.4 4.1 3.7 3 3.1 2.7 2.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Flint sheet (1:250,000); the 1963 Vassar sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Vassar, Michigan — Wikipedia · organization · checked Oct 15, 2026 Supports: city in Tuscola County; 2,727 people in 2020; founded 1849; lumbering; crossing of the Michigan Central Bay City Branch and the Port Huron & Northwestern (from 1900 Pere Marquette) between Saginaw and Port Huron; Cass River flows through the city
- The Great Trailways: Exploring Recreation in Tuscola County — Tuscola Today (July 23, 2025) · web · checked Oct 15, 2026 Supports: two-mile asphalt stretch in Vassar for biking, walking, inline skating and cross-country skiing; wheelchair accessible; used in every season
- Vassar Rail Trail — TrailLink · web · checked Oct 15, 2026 Supports: endpoints Canterbury Ct. south of King James Ct. and Goodrich St./SR 15 and Proctor St.; asphalt; section on a former railroad corridor on the west bank of the Cass River; Townsend North Pavilion and park at the end of S. Cass Avenue; climb through woods west of the park to a neighborhood near active tracks; E. Huron Avenue/SR 15 bridge, S. Water Street and Proctor Street to a supermarket; parking at the southern end of S. Cass Avenue
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.