States › Vermont

Bennington Rail Trail

Rail-trail in Vermont

Runs through Bennington · Bennington County

Conditions now

Loading the weather near Bennington…

Forecast by the National Weather Service for Bennington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.8 mi 1.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at River Street mile 0.7 directions to trailhead 1
  2. Parking at River Street mile 0.8 directions to trailhead 2
Old Bennington, VT, train station (opens in a new tab)
Old Bennington, VT, train station · Photo: Daniel Case · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Bennington Rail Trail is a shared-use path on a former railroad corridor in Bennington, Vermont, running north from downtown toward the Northside Drive neighborhoods; this record maps about 0.8 mile of it, from River Street northward. The Town of Bennington opened the trail to the public in November 2022, after more than ten years of planning, and held a formal ribbon-cutting in spring 2023. Work began with vegetation removal in fall 2021 and included removing the old rails, new surfaces, crosswalks, signs, bridge work and landscaping. About 90 percent of the cost was paid by federal and state grants.

The trail begins at the western end of the Walloomsac Pathway, at the public parking area on Depot Street, and is paved north to the intersection with Orchard Road off Northside Drive; a packed-gravel section continues to Emma Street. It connects with the Orchard Village/Willowbrook Pathway and with the Kocher Drive Pathway, which leads to the East Road Pathway. With the Ninja Trail, a new connector and the downtown Riverwalk, it forms a nearly continuous north–south path from downtown Bennington to Bennington College in North Bennington. On March 11, 2024, the Select Board approved the Planning Commission's recommendation to sign the whole route as the Walloomsac Valley Path, replacing the informal names "Rail Trail" and "Ninja Trail".

The trail is for bicycles and pedestrians; motorized vehicles are prohibited, but Class 1, 2 and 3 electric bicycles are allowed, and riders under 16 may not use Class 3 e-bikes. Dogs must be leashed, and users are asked to keep right except when passing and to warn pedestrians before passing.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bennington Morse St Airport, 3.8 km from the trail's middle, 55 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323544576976817972604838
Low °F131423344452575548382921
Precipitation, in2.41.92.62.53.544.73.93.83.62.82.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1898 Bennington sheet (1:62,500); the 1954 Bennington sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

PostcardRRStationBenningtonVT1913
PostcardRRStationBenningtonVT1913Photo: Unknown authorUnknown author · Public domain · Wikimedia Commons (opens in a new tab)

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Pathway Naming Committee — Town of Bennington · organization · checked Oct 13, 2026
    Supports: completed Bennington Rail Trail, Ninja Trail, connector and Riverwalk forming a nearly continuous north–south pathway from downtown to Bennington College in North Bennington, Walloomsac Valley Path name replacing the informal Rail Trail and Ninja Trail names, Select Board approval March 11, 2024
  3. New Bennington rail trail opens — Bennington Banner (November 22, 2022) · press · checked Oct 13, 2026
    Supports: opening to the public, start at the west end of the Walloomsac Pathway at the Depot Street parking area, paved to Orchard Road, packed gravel to Emma Street, over 10 years of planning, vegetation removal from fall 2021, rails removed, surfaces, crosswalks, signs, bridge work, landscaping, about 90 percent grant funded, connections, rules including e-bike classes, dogs, keep right
  4. Bennington Rail Trail formal dedication is Saturday — Bennington Banner (April 30, 2023) · press · checked Oct 13, 2026
    Supports: formal ribbon-cutting in spring 2023 after the trail opened the previous fall, link between downtown and the Northside Drive area

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.