Wagon Wheel Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through La Crescent · Houston County
Conditions now
Loading the weather near La Crescent…
Forecast by the National Weather Service for La Crescent · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Historic Bluff Country Scenic Byway mile 2.3 directions to trailhead 1
Plan your visit
- By trainAmtrak: La Crosse, WI (LSE) 1.6 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Wagon Wheel Trail is a multi-use trail in La Crescent, Houston County, Minnesota, built in phases to link La Crescent with La Crosse, Wisconsin, across the Mississippi River. A 2015 bill in the Minnesota Legislature sought $2.5 million from the parks and trails fund for a grant to the city for a second phase, including a bike and pedestrian bridge or underpass. A 2018 bonding bill proposed $2.5 million for phase three of four: a grade-separated crossing of Trunk Highways 14, 16 and 61 near downtown La Crescent, connecting to the existing trail.
That crossing, the Wagon Wheel Trail Bridge over Highway 14/61, opened with a ribbon cutting on September 19, 2022. It cost $3.5 million, paid with $2.5 million from the 2018 bonding bill and a $1 million grant from MnDOT. East of town, TrailLink describes the trail running through the Upper Mississippi National Wildlife and Fish Refuge, with Blue Lake to the south, between Main Street on the west and Shore Access Road on the east, where it has views of the Mississippi River. TrailLink lists a crushed gravel surface for that section and no designated parking.
The fourth phase carries the trail into Wisconsin. WXOW reported in June 2026 that the trail currently ends at the boat landing on the Minnesota side and that the 10-foot-wide extension will continue under the Cass Street and Cameron Avenue bridges in La Crosse, giving people on bikes and on foot a route separated from traffic on Highway 14/61. Construction of the extension's bridge was set to begin in September 2027.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
La Crosse Municipal Airport, 6.1 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 27 32 46 60 72 82 85 83 76 62 46 33 Low °F 10 14 26 38 50 60 64 62 54 42 30 18 Precipitation, in 1.2 1.2 2 3.8 4.3 5.1 4.2 3.9 3.6 2.5 1.9 1.5 Snow, in 11.8 9.7 7.3 2.9 0 0 0 0 0 0.3 3.4 10.9 - Wildlife refuges
Passes through Upper Mississippi River National Wildlife and Fish Refuge.
- Old maps
USGS topographic maps of the trail's middle go back to the 1930 La Crescent sheet (1:62,500); the 1956 La Crescent sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- La Crosse Marsh Trails 1.1 mi away · 6.0 mi, paved · Wisconsin
- Swift Creek Trail 1.4 mi away · 1.9 mi, paved · Wisconsin
- Great River State Trail 3.9 mi away · 23.7 mi, crushed stone · Wisconsin
- Pammel Creek Trail 4.2 mi away · 2.5 mi, paved · Wisconsin
- La Crosse River State Trail 4.5 mi away · 21.7 mi, crushed stone · Wisconsin
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14464262, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- HF 2187 Introduction - 89th Legislature (2015 - 2016) — Minnesota Office of the Revisor of Statutes · government source · checked Oct 15, 2026 Supports: 2015 bill, $2.5 million parks and trails fund grant to La Crescent for Wagon Wheel Trail Phase II including a bike and pedestrian bridge or underpass
- SF 2923 Introduction - 90th Legislature (2017 - 2018) — Minnesota Office of the Revisor of Statutes · government source · checked Oct 15, 2026 Supports: phase three of four phases, $2.5 million bond proposal, grade-separated crossing of Trunk Highways 14, 16 and 61 near downtown La Crescent connecting to the existing trail
- Senate Majority Leader Jeremy Miller in Attendance for Opening of New Bridge in La Crescent — Winona Radio (KWNO), September 22, 2022 · web · checked Oct 15, 2026 Supports: bridge opening on Monday, September 19, 2022; phase three of a four-phase project begun in 2015; $3.5 million cost, $2.5 million 2018 bond and $1 million MnDOT grant; crossing of Hwy 14/61; connects La Crescent to La Crosse
- Sen. Miller congratulates La Crescent on completion of Wagon Wheel Trail Bridge — Minnesota Senate Republicans, September 20, 2022 · web · checked Oct 15, 2026 Supports: bicycle/pedestrian bridge over Highway 14/61 was Phase 3; $3.5 million total, $2.5 million from 2018 bonding bill and $1 million MnDOT grant
- Bike ride with the mayor highlights new project to connect La Crescent and La Crosse — WXOW, June 12, 2026 · web · checked Oct 15, 2026 Supports: current trail ends at the boat landing in Minnesota; 10-foot-wide extension under the Cass and Cameron Street bridges; separation from Highway 14/61 traffic; bridge construction set to begin September 2027
- Wagon Wheel Trail | Minnesota Trails — TrailLink · web · checked Oct 15, 2026 Supports: section through the Upper Mississippi National Wildlife and Fish Refuge, Blue Lake to the south, Main Street and Shore Access Road ends, river views, crushed gravel surface, no designated parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.