Walnut Springs Trail
Greenway in Texas
Runs through Seguin · Guadalupe County
Conditions now
Loading the weather near Seguin…
Forecast by the National Weather Service for Seguin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Vaughan Avenue mile 0.6 directions to trailhead 1
- Parking at Aldama Street mile 0.6 directions to trailhead 2
- Parking at San Antonio Avenue mile 0.7 directions to trailhead 3
- Parking at San Antonio Avenue mile 0.7 directions to trailhead 4
- Parking at San Antonio Avenue mile 0.8 directions to trailhead 5
- Parking at San Antonio Avenue mile 0.8 directions to trailhead 6
- Parking at North Vaughan Avenue mile 0.9 directions to trailhead 7
- Parking at North Vaughan Avenue mile 0.9 directions to trailhead 8
- Parking at North Vaughan Avenue mile 0.9 directions to trailhead 9
- Parking at San Antonio Avenue mile 1 directions to trailhead 10
- Parking at Campbell Street mile 1.2 directions to trailhead 11
- Parking at Medlin Street mile 1.6 directions to trailhead 12
- Parking at Juan N. Seguin mile 1.6 directions to trailhead 13
- Parking at Davila Street mile 1.7 directions to trailhead 14
- Parking at Medlin Street mile 1.7 directions to trailhead 15
- Parking at Dibrell Avenue mile 1.8 directions to trailhead 16
- Parking at South Travis Street mile 2.1 directions to trailhead 17
- Parking at West Nolte Street mile 2.1 directions to trailhead 18
- Parking at West Nolte Street mile 2.2 directions to trailhead 19
- Parking at West Nolte Street mile 2.2 directions to trailhead 20
- Parking at West Nolte Street mile 2.2 directions to trailhead 21
- Parking at West Nolte Street mile 2.2 directions to trailhead 22
- Parking at West Nolte Street mile 2.2 directions to trailhead 23
- Parking at West Nolte Street mile 2.2 directions to trailhead 24
- Parking at West Nolte Street mile 2.2 directions to trailhead 25
- Parking at West Washington Street mile 2.2 directions to trailhead 26
- Parking at West Nolte Street mile 2.2 directions to trailhead 27
(opens in a new tab) About this trail
The Walnut Springs Trail, also called the Walnut Springs Hike and Bike Trail, is a concrete trail along Walnut Branch through Seguin, Texas, built by the City of Seguin as a linear park. It follows a creek, not a railroad. Walnut Springs Park, the creekside park on its route, was designed by architect Robert Hugman, who later designed the San Antonio River Walk; the park later fell into disrepair and floods washed away many of its features before the city invested in a new trail. In March 2023 the city engineer described the trail as roughly 2.5 miles long and about 14 feet wide, from Highway 78 (New Braunfels Street) through town to Convent Street, passing Park West, downtown and the Seguin Public Library.
The city broke ground on an extension in October 2020, and it opened in June 2023. The $5.18 million project, about $2 million of it from the Texas Department of Transportation and the Alamo Area Metropolitan Planning Organization, built 0.5 mile of 12-foot-wide concrete trail on the west side of Walnut Branch from the Ruby P. Vaughan Bridge behind St. James Catholic Church to the Pecan Bottom trail in Max Starcke Park. It added retaining walls, an elevated trail crossing and the city's first below-grade crossing, under the South Austin Street bridge; a historic heart-shaped well was moved and set beside the elevated section. With the extension, city officials put the trail at about 4 miles one way from New Braunfels Street to the Guadalupe River in Starcke Park.
This record maps about 2.3 miles in several pieces, from near New Braunfels Street south to near Convent Street and the Ruby P. Vaughan Walnut Springs Bridge. North of downtown the route is mostly off-street, with short on-street and sidewalk links near Saunders, Medlin and Jones streets, and it curves around Park West, a 48-acre park, before passing the Tyson plant on its way north.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin San Antonio, 15.2 km from the trail's middle, 33 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 64 68 75 82 88 93 96 98 92 84 73 65 Low °F 40 44 51 58 66 71 73 73 68 59 49 42 Precipitation, in 2.1 1.7 2.5 2 3.6 3.4 2.2 2 3.5 3.3 2.5 2.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1911 San Marcos sheet (1:125,000); the 1964 Seguin sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City continues work along Walnut Springs linear park/trail — Seguin Today, reposted by Seguin Economic Development Corporation (March 13, 2023) · web · checked Oct 15, 2026 Supports: roughly 2.5 miles, about 14 feet wide, Highway 78 through town to Convent Street; passes Park West, downtown and library; extension to Starcke Park; heart-shaped well relocated and showcased along elevated segment
- City breaks ground on trail expansion project — Seguin Today, reposted by Seguin Economic Development Corporation (October 25, 2020) · web · checked Oct 15, 2026 Supports: October 2020 groundbreaking of the roughly $5 million expansion; original walkway designed by Robert Hugman, designer of the San Antonio River Walk; features later destroyed or washed away and the walkway fell into disrepair
- Walnut Springs Hike, bike trail officially complete — Seguin Gazette, reposted by Seguin Economic Development Corporation (June 24, 2023) · web · checked Oct 15, 2026 Supports: June 2023 opening; $5.18 million with $2 million from TxDOT and Alamo Area MPO; 0.5 mile of 12-foot concrete trail on the west side of Walnut Branch Creek from the Ruby P. Vaughan Bridge behind St. James Catholic Church to the Pecan Bottom trail in Starcke Park; retaining walls, elevated crossing, first below-grade crossing under the South Austin Street bridge; about 4 miles one way from FM 78/New Braunfels Street to the Guadalupe River
- Walnut Springs Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026 Supports: follows Walnut Branch; mostly off-street with short on-street/sidewalk segments via Saunders, Medlin and Jones streets; Park West 48 acres; past the Tyson plant to an end south of New Braunfels Street; Walnut Springs Park designed by Robert Hugman
- OpenStreetMap ways named Walnut Springs Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped length in several pieces; ends near West New Braunfels Street and near West Convent Street and the Ruby P. Vaughan Walnut Springs Bridge; concrete surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.