War Eagle Trail
Rail-trail in Arkansas · OpenStreetMap relation
Runs through Rogers · Benton County
Conditions now
Loading the weather near Rogers…
Forecast by the National Weather Service for Rogers · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South 1st Street mile 0.2 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The War Eagle Trail is a paved shared-use path of about 2 miles in Rogers, Benton County, Arkansas, mapped in OpenStreetMap as a local bicycle route with the reference WE in the Rogers cycle network. It runs along South 1st Street, with mapped parking at trailheads on that street. Rogers grew up as a stop on the Frisco Railroad, and the city says its first official trail opened in 1995.
In 2005 the Rogers City Council approved a Greenway and Trails Master Plan calling for a 60-mile loop of trails, supported by a $1 million matching grant announced from the Walton Family Foundation. The city requires helmets for bicycle riders on its trails and bans motorized vehicles. The trail's own page on the city site could not be found, so the surface, opening date and exact endpoints are not stated here.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bentonville 4 S, 8.5 km from the trail's middle, 42 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 51 60 69 77 85 89 90 82 71 59 49 Low °F 24 27 36 44 54 63 66 65 57 46 36 27 Precipitation, in 2.7 2.7 4.2 4.8 6.3 5.5 3.9 2.7 4 3.4 3.9 3.3 Snow, in 3.2 2.3 2.6 0 0 0 0 0 0 0 0.2 1.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1958 Rogers sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Railyard Loop within 0.2 mi · 8.2 mi, paved
- Veterans Park Loop within 0.2 mi · 2.0 mi, paved
- 13th St Trail 0.5 mi away · 3.2 mi, paved
- Pleasant Ridge Trail 1.0 mi away · 1.4 mi, paved
- Lake Atalanta Loop 1.2 mi away · 1.3 mi, paved
- Razorback Regional Greenway 2.8 mi away · 17.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10741535, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- History - City of Rogers, Arkansas · government source · checked Oct 18, 2026 Supports: Frisco Railroad stop, 1995 first trail, 2005 master plan, 60-mile loop, Walton grant
- Trails and Greenways - City of Rogers, Arkansas · government source · checked Oct 18, 2026 Supports: helmets required, motorized vehicles prohibited
- OpenStreetMap · web · checked Oct 18, 2026 Supports: route WE in Rogers cycle network, South 1st Street trailheads and parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.