Ward Creek Trail
Greenway in Louisiana
Runs through Baton Rouge · East Baton Rouge Parish
Conditions now
Loading the weather near Baton Rouge…
Forecast by the National Weather Service for Baton Rouge · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bluebonnet Boulevard mile 0 directions to trailhead 1
- Parking at Bluebonnet Parc Avenue mile 0.3 directions to trailhead 2
- Parking at Bluebonnet Parc Avenue mile 0.4 directions to trailhead 3
- Parking at Mall of Louisiana Boulevard mile 0.6 directions to trailhead 4
- Parking at Mall of Louisiana Boulevard mile 0.6 directions to trailhead 5
- Parking at Mall of Louisiana Boulevard mile 0.7 directions to trailhead 6
(opens in a new tab) About this trail
The Ward Creek Trail is a concrete path of about 2 miles in Baton Rouge, East Baton Rouge Parish, Louisiana, running along Ward Creek near the Mall of Louisiana. A 2013 article in 225 Baton Rouge, which spells the name Wards Creek, described a trail from Bluebonnet Boulevard behind the mall, through The Grove development, to Siegen Lane, about 2.2 miles, then under construction by BREC.
The same article said BREC was seeking grants for a later phase to link the trail to Pennington Biomedical Research Center and the Rouzan development. OpenStreetMap maps the built sections as concrete cycleway designated for bicycles and pedestrians, with one section tagged as under construction. Current length and status are not confirmed by a BREC page, which refused automated access.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to April and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lsu Ben-Hur Farm, 9 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 61 65 71 78 84 89 91 91 88 80 70 63 Low °F 40 44 50 56 65 71 73 72 68 57 47 42 Precipitation, in 5.8 4.7 4.4 4.9 5.6 6.5 4.7 6.1 4.5 4.2 4 5.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1908 Baton Rouge sheet (1:62,500); the 1953 Baton Rouge East sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Baton Rouge getting smarter: recent progress on parks and trails - 225 Baton Rouge · web · checked Oct 18, 2026 Supports: route, 2.2 miles, BREC building in 2013, planned next phase
- OpenStreetMap · web · checked Oct 18, 2026 Supports: concrete surface, designated bicycle, section tagged under construction
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.