Waughtown Connector Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Winston-Salem · Forsyth County
Conditions now
Loading the weather near Winston-Salem…
Forecast by the National Weather Service for Winston-Salem · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Winston Salem.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Quarry Road mile 0.6 directions to trailhead 1
- Parking at Quarry Road mile 0.7 · restrooms directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Waughtown Connector Greenway is a City of Winston-Salem greenway in southeast Winston-Salem, North Carolina, linking Quarry Park, now known as The Quarry at Grant Park, with Marble Street near Waughtown Street and with the Peachtree Greenway toward the Salem Creek Greenway and the city's downtown greenway system. The family of former City Council member Molly Leight donated land used for the connector. Quarry Park, on a 165-acre former quarry property Vulcan donated to the city in 1998, opened in August 2017.
OpenStreetMap maps the connector at about 1.6 miles of asphalt path with bridges, designated for bicycles and pedestrians, with leashed dogs allowed; parking is off Quarry Road at the park. A Visit Winston-Salem trail guide places the bike rack and footbridge where the connector leaves the park about 0.4 mile from the park's main lot, the unsigned Peachtree Greenway junction at about 0.6 mile, and the Salem Creek Greenway junction at about 1.2 miles, after a crossing of Peachtree Street.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
55% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Winston Salem Rynlds Airport, 6.5 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 53 61 71 78 85 88 86 80 71 60 52 Low °F 31 33 40 48 57 65 69 68 61 49 39 34 Precipitation, in 3.4 2.9 3.6 3.7 3.8 3.6 4.2 4.5 3.9 3.3 3.1 3.3 - On the National Register
- Waughtown--Belview Historic District, Winston-Salem · historic district, listed 2005 · nomination file for Waughtown--Belview Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1950 Winston-Salem East sheet (1:24,000); the 1951 Winston-Salem East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Salem Creek Greenway 0.5 mi away · 4.8 mi, paved
- Salem Lake Trail 0.9 mi away · 7.0 mi, crushed stone
- Long Branch Trail 1.4 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10794151, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Quarry Park opens to public — The Chronicle (Winston-Salem), August 17, 2017 · web · checked Oct 17, 2026 Supports: land donated by Molly Leight's family, connector from Marble Street near Waughtown Street to the park, Vulcan donated 165 acres in 1998, park opened August 2017
- Quarry Park + Waughtown Trail Guide — Visit Winston-Salem · web · checked Oct 17, 2026 Supports: The Quarry at Grant Park name, footbridge and bike rack at 0.4 mile, unsigned Peachtree Greenway junction, Peachtree Street crossing, Salem Creek Greenway junction at 1.2 miles, link to downtown greenway system
- OpenStreetMap relation 10794151 (Waughtown Connector Greenway) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: City of Winston-Salem operator, mapped length, asphalt, bridges, bicycle designation, leashed dogs, Quarry Road parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.