Waverly Rail Trail
Rail-trail in Iowa · OpenStreetMap relation
Runs through Waverly · Bremer County
Conditions now
Loading the weather near Denver…
Forecast by the National Weather Service for Denver · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 2nd Avenue Northeast mile 0.4 directions to trailhead 1
- Parking at 2nd Avenue Northeast mile 0.4 directions to trailhead 2
- Parking at 1st Avenue Northeast mile 0.5 directions to trailhead 3
- Parking at 2nd Street Northeast mile 0.5 directions to trailhead 4
- Parking at 5th Street Southeast mile 0.7 directions to trailhead 5
- Parking at Killdeer Avenue mile 6.6 · restrooms directions to trailhead 6
(opens in a new tab) About this trail
The Waverly Rail Trail is a paved rail trail of about 7 miles in Bremer County, Iowa, run by the City of Waverly from downtown Waverly southeast to US Highway 63. It follows the former railroad line from Waverly toward Readlyn. In 1991, after the Cedar Valley Railroad applied to abandon that line, residents formed a Bremer County chapter of the Iowa Trails Council to seek it for a trail, but in bankruptcy proceedings a dinner train was found to own the Waverly-to-Highway 63 section and kept using it. When Trains Unlimited later went out of business, the city bought the right-of-way from its creditors and won a $1 million development grant, $700,000 from the Iowa Department of Transportation and $300,000 matched by the city.
The trail starts at the 480-foot Cedar River bridge downtown and runs on a 10-foot asphalt path over eight bridges and under two roads, through mostly rural country, to US 63. There the Denver-Jefferson Trail continues about 2 miles south to Denver, and the Readlyn Grump Trail, also included in the line mapped on this page, continues about 6 miles east to Readlyn. Bremer County bought that right-of-way in 2003 and in 2007 pledged $25,000 toward a $250,000 state grant for the Grump Trail, which crosses Quarter Section Run and ends at Water Tower Park and Friendly People Ball Park in Readlyn, both with parking and restrooms. These trails belong to the planned Rolling Prairie Trail system.
Benches and picnic tables stand at key points, with a restroom at the Kwik Star downtown and primitive restrooms at the 2- and 6-mile marks. In winter the section from the Kwik Star trailhead to US 63 is left unplowed for skiing, snowshoeing and fat-tire biking. Hunting and firearms are banned within 50 feet of the trail. An annual candlelight walk, generally on the first Saturday of November, lines 1.1 miles with about 400 luminaries.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Chicago & North Western line, built 1903, abandoned 1991. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tripoli, 14.9 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 29 43 58 70 80 83 81 74 61 44 31 Low °F 7 12 24 36 48 59 62 59 50 38 26 15 Precipitation, in 1.2 1.1 2 3.9 5.1 6 4.8 4.3 3.8 3 2 1.5 - On the National Register
- Harmon and LeValley Northwest Historic District, Waverly · historic district, listed 2014
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Waterloo sheet (1:250,000); the 1963 Denver sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesRail Trail & Trail System — City of Waverly
- RedditSearch Reddit: r/Iowa
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8815693, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Rail Trail & Trail System — City of Waverly · web · checked Oct 14, 2026 Supports: starts at the 480-foot Cedar River Bridge downtown; 10-foot asphalt; about 7 miles southeast over 8 bridges and under 2 roads to US 63; Denver-Jefferson Trail about 2 miles south to Denver, Readlyn-Grump Trail about 6 miles east to Readlyn; mostly rural; benches and picnic tables, Kwik Star restroom, primitive restrooms at the 2- and 6-mile marks; Kwik Star trailhead east to Hwy 63 not cleared in winter for skiing, snowshoeing and fat-tire biking; no hunting or firearms within 50 feet; leashed pets; Candlelight Walk first Saturday of November, about 400 luminaries over 1.1 miles
- History & Development — City of Waverly · web · checked Oct 14, 2026 Supports: 1991 Cedar Valley Railroad abandonment application for the Waverly-Readlyn line; Bremer County chapter of the Iowa Trails Council; Dinner Train found in bankruptcy proceedings to own Waverly to Highway 63; Trains Unlimited went out of business; land purchased from its creditors; $1 million grant project, $700,000 DOT and $300,000 city match
- Bremer County approves $25,000 for trail to Readlyn — BikeIowa, from the Waterloo-Cedar Falls Courier (August 1, 2007) · web · checked Oct 14, 2026 Supports: county grant of $25,000 to the Readlyn Grump Trail as a condition of a $250,000 state grant; six-mile course from Readlyn to US 63; county bought the right-of-way in 2003; Rolling Prairie Trails planned in Bremer, Butler and Franklin counties
- Readlyn Grump Trail — TrailLink · web · checked Oct 14, 2026 Supports: Readlyn Grump Trail bridge over Quarter Section Run; ends at Water Tower Park and Friendly People Ball Park, both with parking and restrooms
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.