States › Maryland

Wayne Gilchrest Trail

Rail-trail in Maryland · OpenStreetMap relation

Runs through Chestertown · Kent County

Conditions now

Loading the weather near Chestertown…

Forecast by the National Weather Service for Chestertown · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Manor Avenue mile 0 directions to trailhead 1
  2. Parking at High Street mile 0.3 directions to trailhead 2
  3. Parking mile 0.6 directions to trailhead 3
  4. Parking at South Cross Street mile 1.5 directions to trailhead 4
Northern end of the Wayne Gilchrest Trail.jpg (opens in a new tab)
Northern end of the Wayne Gilchrest Trail.jpg · Photo: Eplack · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Wayne Gilchrest Trail, also called the Gilchrest Rail Trail and formerly the Chestertown Rail Trail, is a paved rail-trail of about 2.2 miles in Chestertown, Kent County, Maryland. It follows the railbanked right-of-way of the Kent County Railroad, which reached Chestertown on February 20, 1872, and opened a short extension to the wharf on the Chester River that August. The line later passed to the Pennsylvania Railroad, which ran it as the Chestertown Railroad within its Delaware Railroad system, and then to Penn Central. Maryland began leasing the line in 1976, the Maryland Department of Transportation bought it in late 1981 or early 1982, and freight service into Chestertown ended in the late 1980s or early 1990s.

The trail covers the line between mileposts 18.82 and 20.29, a 20th-century extension to the river from High Street, and the former Strawboard Branch, which once served a paper mill north of town along High Street. Its southern end is near Cross Street (MD 289) and the Chestertown Railroad Station, close to Wilmer Park on the river. To the north the trail meets Morgnec Road (MD 291) by Washington College, and a spur reaches Gateway Park on High Street. Plans call for extending it over the 1.8 miles between the railbanked section and the active Maryland and Delaware Railroad track toward Worton. This record maps about 2 miles.

The surface is asphalt, and TrailLink lists it for bicycles, inline skates, walkers and wheelchairs. Parking is at Wilmer Park, 413 South Cross Street, at Gateway Park, 872 High Street, and on the Washington College campus near the northern end.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 77% of this route as an abandoned rail line.

Chestertown Secondary. From MDOT SHA Railroad Centerline Routes.

Shade

33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chestertown, 1.8 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414452647482878578675645
Low °F272835455564696760483831
Precipitation, in3.32.94.23.73.94.44.33.64.93.73.23.8
Snow, in5.27.91.70.200000001.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1898 Tolchester sheet (1:125,000); the 1953 Chestertown sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14663519, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kent County Rail Road — Wikipedia · organization · checked Oct 14, 2026
    Supports: line reached Chestertown February 20, 1872, wharf extension August 1, 1872; Pennsylvania Railroad (Chestertown Railroad, Delaware Railroad system), Penn Central; Maryland leasing from 1976; MDOT purchase late 1981 or early 1982; freight ended late 1980s-early 1990s; railbanked as the 2.2-mile Wayne Gilchrest Trail (nee Chestertown Rail Trail) between mileposts 18.82 and 20.29 with the river extension and Strawboard Branch; 1.8-mile extension plans
  3. Maryland Route 289 — Wikipedia · organization · checked Oct 14, 2026
    Supports: southern terminus of the Gilchrest Rail Trail near Cross Street and the Chestertown Railroad Station
  4. Maryland Route 291 — Wikipedia · organization · checked Oct 14, 2026
    Supports: northern terminus at Morgnec Road by Washington College
  5. Wayne Gilchrest Trail — TrailLink · web · checked Oct 14, 2026
    Supports: asphalt; bike, inline skating, walking, wheelchair; Wilmer Park and Gateway Park end points; spur to Gateway Park; extension toward Worton; parking addresses
  6. Wayne Gilchrest Trail (relation 14663519) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: record length about 2 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.