States › Missouri

West Alton Bike Trail

Rail-trail in Missouri

Runs through West Alton · St. Charles County

Conditions now

Loading the weather near West Alton…

Forecast by the National Weather Service for West Alton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.1 mi 1.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lock & Dam Road mile 0 directions to trailhead 1
West Alton, along the trail (opens in a new tab)
West Alton, along the trail · Photo: Paul Sableman · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The West Alton Bike Trail is a short path in West Alton, St. Charles County, Missouri, near the Missouri end of the Clark Bridge over the Mississippi River. The name comes from OpenStreetMap, which maps the path on an abandoned railroad embankment; the trail directory TrailLink lists the same route as the West Alton Trail, a rail-trail of 1.1 miles between US 67 north of Machens Club Drive and the Lincoln-Shields Recreation Area, though its description gives 2 miles. No page from a managing agency describing the trail was found.

The mapped line runs about 1.1 miles southwest from a parking area on Lock & Dam Road. The Lincoln-Shields Recreation Area at its river end has a boat launch, picnic facilities and restrooms, according to TrailLink. Riders posting on a Katy Trail forum in 2024 described using the trail as part of a route between St. Charles County and the Clark Bridge: the trail does not quite reach Machens Club Drive, and riders cover the short gap to St. Charles Street on the shoulder of US 67.

The surface is mixed. OpenStreetMap maps most of the path as asphalt and one stretch as gravel, and a TrailLink contributor's photo captions describe pavement near the Clark Bridge end that soon gives way to a rougher surface, with overgrowth closing in further along; a forum rider in 2024 called the stretch from a gravel parking lot just under a mile north of St. Charles Street to the bridge in great condition.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April, June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Alton - Melvin Price L&D, 4.4 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394454667584878680685444
Low °F222535455666696760483627
Precipitation, in2.52.53.54.95.53.443.33.42.93.42.6
Wildlife refuges

Passes beside Big Muddy National Fish and Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1927 Alton sheet (1:62,500); the 1954 Alton sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Way: West Alton Bike Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: name, cycleway designated for bicycles and pedestrians on an abandoned railroad embankment, asphalt surface; way 1567216150 gravel; parking on Lock & Dam Road
  3. West Alton Trail — TrailLink · web · checked Oct 15, 2026
    Supports: alternate name, 1.1-mile length (2 miles in the description), endpoints, Lincoln-Shields Recreation Area facilities, contributor photo captions on pavement and overgrowth
  4. Route across Clark Bridge — KT / RI Forum (bikekatytrail.com, August 2024) · web · checked Oct 15, 2026
    Supports: riders' use of the trail toward the Clark Bridge, gap at Machens Club Drive and US 67 shoulder, condition from the gravel lot to the bridge

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.