States › South Carolina

West Ashley Greenway

Rail-trail in South Carolina

Runs through Charleston · Charleston County

Conditions now

Loading the weather near Charleston…

Forecast by the National Weather Service for Charleston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The West Ashley Greenway is a rail trail in Charleston, South Carolina. It stretches across the West Ashley neighborhood from Main Road in the west to Folly Road in the east. It is a straight and mostly paved path utilized for walking, jogging, roller skating, and off-street cycling. The distance of the main trail currently covers 8.8 miles (14.2 km). It is a contributing segment of the East Coast Greenway. In 2019, the U.S. Department of Transportation gave the city of Charleston a $18 million grant to build a pedestrian bridge across the Ashley River connecting West Ashley to downtown Charleston. As of 2026, the pedestrian bridge is under construction. The planned pedestrian bridge may eventually connect with the Lowcountry Lowline.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
8.1 mi 13.0 km1
On former railbed
7.1 mi 87%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mc Cleod Mill Road mile 0 directions to trailhead 1
  2. Parking at Sanford Road mile 5.7 directions to trailhead 2
  3. Parking at Markfield Drive mile 5.8 directions to trailhead 3
  4. Parking at Leinbach Drive mile 5.8 directions to trailhead 4
  5. Parking at Markfield Drive mile 5.8 directions to trailhead 5
  6. Parking at Leinbach Drive mile 5.9 directions to trailhead 6
  7. Parking at Farmfield Avenue mile 6.4 directions to trailhead 7
  8. Parking at Farmfield Avenue mile 6.5 directions to trailhead 8
  9. Parking at Albemarle Road mile 8 directions to trailhead 9
Jemah and Milo (opens in a new tab)
Jemah and Milo · Photo: tedkerwin · CC BY · Flickr

About this trail

The West Ashley Greenway is a rail-trail of about 8.5 miles across the West Ashley area of Charleston, South Carolina, used for walking, jogging, skating and off-street cycling. It follows the Croghans Branch of the Atlantic Coast Line Railroad, chartered in 1853 and abandoned by the Seaboard Coast Line Railroad in 1981. Utility companies took over the right-of-way, and the City of Charleston leased it from them to open it to the public; the last section was completed in 2007. The greenway is part of the East Coast Greenway.

The east end is at Albemarle Road and Croghan Spur Road near the Ashley River, where a historical marker describes the Croghans Branch. From there the trail runs west through suburban neighborhoods, crossing streets including Wappoo Road, and roughly halfway along a short on-road link leads to the 2.7-mile West Ashley Bikeway. At Parkdale Drive the surface changes from asphalt to compacted gravel for 2.3 miles to Croghan Landing Drive, and the final 1.4 miles to the western end at McLeod Mill Road run on a causeway between marsh and tidal creeks, a spot used for crabbing, fishing and bird watching. Wikipedia gives the ends as Main Road in the west and Folly Road in the east. This record maps about 8.1 miles.

There are no restrooms along the greenway. In 2019 the U.S. Department of Transportation awarded the city an $18 million grant for a pedestrian bridge across the Ashley River toward downtown Charleston, which was under construction in 2026. TrailLink reported that from June 2026 the trail was closed between Campbell Drive and Wesley Drive for drainage work and utility relocation, with completion expected in fall 2026.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charleston City, 9.8 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586066727984888683766761
Low °F444652606874777672635347
Precipitation, in2.62.6332.64.85.16.15.24.12.32.9
Old maps

USGS topographic maps of the trail's middle go back to the 1919 Johns Island sheet (1:21,120); the 1958 Johns Island sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In July 2025, commenters disagreed about crossings: one said drivers normally yield to pedestrians on the greenway but not on the West Ashley Bikeway, while another said cars still have to be dodged on the greenway. r/Charleston, Jul 2025
  • In 2025 and 2026, commenters said the west end near Johns Island runs on gravel to Stono River County Park, which has boardwalk and gravel paths, and quiet roads continue beyond a bridge. r/Charleston, Jul 2025 · r/bicycling, Apr 2026
  • In January 2025, one rider suggested parking at St. John's High School and riding Chisholm Road over the Limehouse Bridge to the greenway, then on downtown and across the Ravenel Bridge. r/bicycling, Jan 2025
3 Reddit threads about this trail, Jan 2025 to Apr 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “West Ashley Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7984328, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. West Ashley Greenway — Wikipedia · organization · checked Oct 16, 2026
    Supports: mostly paved path across West Ashley for walking, jogging, roller skating and cycling; Croghans Branch of the Atlantic Coast Line chartered 1853, abandoned by Seaboard Coast Line 1981; city leased the right-of-way from utility companies; last section 2007; East Coast Greenway; Main Road to Folly Road; 2019 $18 million USDOT grant for an Ashley River pedestrian bridge, under construction as of 2026
  5. West Ashley Greenway — TrailLink · web · checked Oct 16, 2026
    Supports: east end at Albemarle Road and Croghan Spur Road with Croghans Branch historical marker; Wappoo Road; connection to the 2.7-mile West Ashley Bikeway; gravel from Parkdale Drive 2.3 miles to Croghan Landing Drive; 1.4-mile causeway to McLeod Mill Road, crabbing, fishing, birds; asphalt and gravel; no restrooms; June 2026 closure between Campbell Drive and Wesley Drive expected to end fall 2026
  6. West Ashley Greenway — OpenStreetMap way 150852250 · web · checked Oct 16, 2026
    Supports: mapped extent of this record (about 8.1 miles)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.