States › Texas

West Rail Trail

Rail-trail in Texas · OpenStreetMap relation

Runs through Brownsville · Cameron County

Conditions now

Loading the weather near Brownsville…

Forecast by the National Weather Service for Brownsville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.4 mi 10.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pandana Street mile 3.8 directions to trailhead 1
  2. Parking at Oliveira Park Road mile 3.9 directions to trailhead 2
Brownsville, along the trail (opens in a new tab)
Brownsville, along the trail · Photo: Michael Martin from Cypress, Texas · CC BY-SA 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The West Rail Trail is a paved hike-and-bike trail in Brownsville, Cameron County, Texas, built on an abandoned railroad corridor that runs north from Palm Boulevard, near downtown, to Interstate 69E (Expressway 77/83) near Olmito. The Cameron County Regional Mobility Authority, the City of Brownsville, Cameron County and the Texas Department of Transportation (TxDOT) proposed the project, which TxDOT's fact sheet put at 6.60 miles; city agenda documents gave 6.89 miles, and Valley Business Report called it nearly 7 miles at its opening. This record maps about 6.4 miles.

The corridor became available after Union Pacific relocated its line away from the city center. Developers proposed a toll road or a new north-south thoroughfare on the right-of-way, and an advocacy group, Friends of the West Rail Trail, formed to campaign for a trail instead and presented a petition to the City Commission. TxDOT's fact sheet described a 100-foot right-of-way holding only the rock foundation of the old railroad, 25 to 30 feet wide, with grass drainage ditches on both sides that would remain to drain the trail. In late 2021 the City Commission awarded an $8.8 million construction contract to Foremost Paving; the trail officially opened on October 14, 2022, at Oliveira Park.

From Palm Boulevard the trail runs north past Alton Gloor Boulevard and the 77 Flea Market toward Olmito. The fact sheet planned a 12-foot shared-use path with two new structures over water and neighborhood connections at more than two dozen points, among them Old Military Highway, Honeydale Road, Oliveira Park Road, Pandana Street and El Paso Road. The fact sheet specified asphalt, while the city's contract, as reported by The Rider, called for concrete. Valley Business Report said $900,000 would go to later benches, shade structures and other amenities.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Brownsville, 10.9 km from the trail's middle, 5 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F737681869094959692878074
Low °F535762687477787875696155
Precipitation, in1.111.41.52.22.922.25.73.81.81.2
Snow, in000000000000
Wildlife refuges

Passes beside Lower Rio Grande Valley National Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1930 West Brownsville sheet (1:24,000); the 1956 West Brownsville sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14370067, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Rail Trail, Palm Boulevard to I-69 East — Fact Sheet, Texas Department of Transportation · government source · checked Oct 15, 2026
    Supports: project partners (CCRMA, City of Brownsville, Cameron County, TxDOT); abandoned railroad corridor from Palm Boulevard to I-69 East, 6.60 miles; 12-foot asphalt shared-use path; rock foundation 25 to 30 feet wide, 100-foot right-of-way, drainage ditches; 2 new structures over water; access connections including Old Military Highway, Honeydale Road, Oliveira Park Road, Pandana Street, El Paso Road
  3. Brownsville commission approves $8.8M award for West Rail Trail Project — The Rider (November 2021) · web · checked Oct 15, 2026
    Supports: $8.8 million contract to Foremost Paving Inc.; concrete hike-and-bike trail; Palm Boulevard to I-69E, 6.89 miles per agenda documents
  4. West Rail Joins Brownsville's Trails Network — Valley Business Report (October 2022) · web · checked Oct 15, 2026
    Supports: official opening Oct. 14 (2022) at Oliveira Park; nearly 7 miles from Palm Boulevard past Alton Gloor Boulevard to Expressway 77/83 near Olmito and the 77 Flea Market; Union Pacific line relocation; toll road and thoroughfare proposals; Friends of the West Rail Trail and petition; $900,000 for future benches and shade structures

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.