Westbank Expressway Trail
Greenway in Louisiana
Runs through Harvey, Gretna and Terrytown · Jefferson Parish
Conditions now
Loading the weather near Gretna…
Forecast by the National Weather Service for Gretna · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Westbank Expressway Trail is a paved-path segment of about 2.7 miles on the west bank of the Mississippi River in Jefferson Parish, Louisiana, near the Westbank Expressway. OpenStreetMap maps it as a cycleway designated for bicycles and pedestrians. The name is taken from OpenStreetMap.
The Westbank Expressway is the name of U.S. Route 90 Business through Westwego, Marrero, Harvey and Gretna, an elevated freeway through Marrero and Harvey with frontage roads beneath. Wikipedia's article on the route does not mention a bike path. No fetchable agency page describes this trail, so its manager, surface and opening date are not stated here.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Terrytown 3s, 1.9 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 66 73 78 85 90 92 92 89 81 72 65 Low °F 45 49 54 61 68 74 76 76 73 63 53 48 Precipitation, in 5.8 4 5.2 5.2 4.7 6.9 7.3 6.8 6.8 3.7 4.2 5.4 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 New Orleans sheet (1:62,500); the 1951 New Orleans East sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Mississippi River Trail 0.9 mi away · 79.4 mi, paved
- Canal Street Neutral Ground 2.2 mi away · 0.9 mi, paved
- Lafitte Greenway 3.1 mi away · 2.2 mi, paved
- Forty Arpent Trail 4.0 mi away · 8.0 mi, paved
- Norman C. Francis Trail 4.3 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- U.S. Route 90 Business (New Orleans, Louisiana) - Wikipedia · organization · checked Oct 18, 2026 Supports: Westbank Expressway as US 90 Business through Westwego, Marrero, Harvey, Gretna; elevated freeway with frontage roads; no bike path mentioned
- OpenStreetMap · web · checked Oct 18, 2026 Supports: name Westbank Expressway Trail, cycleway designated for bicycles and foot
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.