Western Canal Path
Canal towpath in Arizona · OpenStreetMap relation
Runs through Phoenix and Tempe · Maricopa County
Conditions now
Loading the weather near Phoenix…
Forecast by the National Weather Service for Phoenix · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Baseline Road mile 3.8 directions to trailhead 1
- South Parking Lot mile 5.5 · restrooms directions to South Parking Lot
- Parking at South 29th Terrace mile 6.3 directions to trailhead 3
- Parking at East Dunbar Drive mile 6.3 directions to trailhead 4
- Parking at South 44th Way mile 8.4 · restrooms directions to trailhead 5
- Parking at Baseline Mobile Home Park mile 10.8 directions to trailhead 6
- Parking at South Ash Avenue mile 11.1 · restrooms directions to trailhead 7
- Parking at South All America Way mile 11.8 directions to trailhead 8
About this trail
The Western Canal Path is a canal-bank path along the Western Canal in the Phoenix area of Arizona. This record covers about 9.4 miles with a gravel surface tag. The City of Phoenix and Salt River Project (SRP) are upgrading part of it, and the visitphoenix.com guide describes the Western Canal as running along south Phoenix through Tempe to Gilbert.
The city's Western Canalscape Phase 1 covers the south bank between 4th Avenue and 24th Street. The City of Phoenix Street Transportation Department, working with SRP, plans to replace the dirt path with a concrete pedestrian and bicycle pathway, with lighting, crossing infrastructure at arterial and collector streets and, where right-of-way allows, seating, shade structures, pedestrian bridges and public art. Design was finalized in spring 2025, and the city says construction is on hold until an SRP transmission line project in the same area is complete, expected in summer 2027, with Phase 1 construction expected in 2027 and 2028. A pre-design study for Phase 2, from 24th Street to 48th Street, began in March 2024.
A visitphoenix.com guide notes that a 1964 agreement between SRP and Maricopa County allows walking, biking, running and horseback riding on the canal banks, and that canal banks combine paved and hard-packed multi-use trails.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
South Phoenix, 4.4 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 67 71 78 85 92 101 102 101 97 87 74 65 Low °F 42 44 48 54 62 69 77 78 71 59 48 40 Precipitation, in 0.9 1 0.9 0.3 0.1 0.1 0.8 0.8 0.6 0.7 0.7 0.8 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Salt River Project Diversion and Conveyance System Historic District, Phoenix · historic district, listed 2017
- Old maps
USGS topographic maps of the trail's middle go back to the 1912 Phoenix sheet (1:62,500); the 1952 Phoenix sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/arizona
Nearby trails
- Sun Circle Trail within 0.2 mi · 84.8 mi, paved
- Phoenix–Sonoran Bikeway 0.3 mi away · 2.8 mi, paved
- Highline Canal Path 0.3 mi away · 10.5 mi, paved
- Kyrene Canal Path 0.6 mi away · 2.9 mi, paved
- South Overbank Trail 2.5 mi away · 1.3 mi, paved
- North Overbank Trail 2.6 mi away · 3.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9737236, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Western Canalscape Phase 1: 4th Avenue to 24th Street - City of Phoenix · government source · checked Oct 17, 2026 Supports: Phase 1 extent, planned concrete path, SRP partnership, timeline, Phase 2 study
- Explore the Phoenix Canals - Visit Phoenix · web · checked Oct 17, 2026 Supports: Western Canal runs along south Phoenix through Tempe to Gilbert; 1964 SRP-Maricopa County agreement; paved and hard-packed canal trails
- OpenStreetMap relation 9737236 · web · checked Oct 17, 2026 Supports: record length (about 9.4 miles) and gravel surface tag
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.