States › Michigan

White Lake Pathway

Rail-trail in Michigan

Runs through Montague and Whitehall · Muskegon County

Conditions now

Loading the weather near Whitehall…

Forecast by the National Weather Service for Whitehall · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.3 mi 5.4 km1
On former railbed
2.2 mi 67%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Thompson Street mile 0.3 · restrooms directions to trailhead 1
  2. Parking at West Colby Street mile 0.5 directions to trailhead 2
  3. Parking at 1st Street mile 0.5 directions to trailhead 3
  4. Parking at Lake Street mile 0.6 directions to trailhead 4
Whitehall, MI (opens in a new tab)
Whitehall, MI · Photo: TCP04 · CC BY 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The White Lake Pathway is a 3.2-mile asphalt-paved linear park joining the cities of Whitehall and Montague in Muskegon County, Michigan, at the east end of White Lake. The City of Whitehall describes it as running from White Lake Drive near Cogswell Avenue north to Stanton Boulevard in Montague. TrailLink classes it as a rail-trail.

The pathway links two longer trails. At its south end it meets the Berry Junction Trail, about 6 miles long, and at its north end the 22-mile Hart-Montague Trail State Park, together giving more than 31 miles of continuous paved trail. The City of Montague calls the Hart-Montague Michigan's first linear state park and says the trail has been extended south of the White River through Whitehall and west through Montague. In 1999 Montague began moving its old trailhead from Stanton Boulevard and extending the trail south from Stanton Boulevard to the White River and west to Whitbeck Road. The $377,000 project was completed in 2006 with funds from MDOT's Transportation Enhancement program, MDEQ Coastal Zone Management, the City of Montague and local groups. Its trailhead at the east end of Spring Street, north of the Trailway Campground, has parking for 70 cars, restrooms, a picnic shelter and an information kiosk.

The route passes woodlands, landscaped flower beds, outdoor sculptures, White Lake and its marinas, and the White River flood plain. Since 2012 the pathway has been open to snowmobiles, linking the snowmobile route between Montague and Muskegon. Montague allows them on its section with at least four inches of snow, while Whitehall bars them from its trail east of the White River's universally accessible fishing bridge. The White Lake Area Chamber of Commerce and Visitors Bureau sits beside the trail at Thompson and Hanson streets.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 49% of this route as a trail on former railroad right-of-way.

Shade

37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Montague 4 NW, 9.2 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303242556775797872584535
Low °F191925344453585751413224
Precipitation, in2.61.42.33.83.43.333.33.24.13.11.8
Snow, in2613.86.71.7000000.14.715.9
Old maps

USGS topographic maps of the trail's middle go back to the 1929 Montague sheet (1:48,000); the 1959 Montague sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Whitehall, MI :: Play · government source · checked Oct 15, 2026
    Supports: 3.2-mile asphalt-paved linear park, White Lake Drive near Cogswell Avenue to Stanton Boulevard in Montague, views along the route, 6-mile Berry Junction Trail and 22-mile Hart-Montague Trail connections, over 31 miles of continuous paved trail, opened to snowmobiles in 2012 between Montague and Muskegon, chamber office on the trail at Thompson and Hanson streets
  3. City of Montague, MI :: Bike Trail · government source · checked Oct 15, 2026
    Supports: Hart-Montague as Michigan's first linear state park, extension south of the White River through Whitehall and west through Montague, 1999 trailhead relocation and extension to the White River and Whitbeck Road, $377,000 completed in 2006, funding sources, Spring Street trailhead with 70 parking spaces, restrooms, shelter, kiosk, snowmobile rule of four inches of snow, Whitehall snowmobile ban east of the White River fishing bridge
  4. White Lake Pathway | Michigan Trails — TrailLink · web · checked Oct 15, 2026
    Supports: rail-trail category, Muskegon County, endpoints at the Hart-Montague Trail and the Berry Junction Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.