States › Wisconsin

Wild River Trail

Rail-trail in Wisconsin

Runs through Cable · Bayfield County

Conditions now

Loading the weather near Cable…

Forecast by the National Weather Service for Cable · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.5 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pine Street mile 0 directions to trailhead 1
  2. Parking at Pine Street mile 0 directions to trailhead 2
  3. Parking at Pine Street mile 0 · restrooms directions to trailhead 3
  4. Parking at Pine Street mile 0 directions to trailhead 4
  5. Parking at Kavanaugh Road mile 0 directions to trailhead 5
  6. Parking mile 0.4 directions to trailhead 6
  7. Parking mile 0.6 directions to trailhead 7
  8. Parking mile 0.8 directions to trailhead 8

Plan your visit

Links checked Oct 18, 2026. Sources: National Park Service boundaries.

Forest Lodge Library, beside the trail (opens in a new tab)
Forest Lodge Library, beside the trail · Photo: Billertl · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Wild River Trail is a short trail of about 1.5 miles on a former railroad grade at Cable, in the Town of Cable in Bayfield County, Wisconsin. It is one of the trails of the Chequamegon Area Mountain Bike Association (CAMBA), the nonprofit that develops and manages a regional system of more than 130 miles of mountain bike trails and more than 200 miles of gravel routes around the Chequamegon-Nicolet National Forest and the Bayfield and northern Sawyer county forests. No source was found naming the railroad.

In 2020 and 2021 the National Park Service (NPS) at the St. Croix National Scenic Riverway completed an environmental assessment and a Finding of No Significant Impact for the Cable Connector Trail, a 0.25-mile natural-surface connection built in partnership with CAMBA from the end of a segment of the Wild River Trail, across NPS land, to Parker Road. A special regulation published on February 17, 2022, allowed bicycles on the connector from March 21, 2022, the first trail on the Riverway open to bikes. It was planned for hiking, trail running, mountain bikes and e-bikes in summer and fat-tire biking, snowshoeing and cross-country skiing in winter, with no horses or motorized use.

OpenStreetMap shows the Wild River Trail as an unpaved path on the abandoned railbed, with a bridge near its southern end and its northern end near Pine Street in Cable.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

57% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to June and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Drummond, 15.3 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F192537506473767568533624
Low °F3618284151565548352311
Precipitation, in1.21.12.13.24.13.75.23.53.83.22.11.6
Snow, in15.512.112.56.50.100001.212.913.4
Old maps

USGS topographic maps of the trail's middle go back to the 1944 Hayward sheet (1:48,000); the 1953 Ashland sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Cable Connector Trail — NPS Planning, Environment & Public Comment (St. Croix National Scenic Riverway) · government source · checked Oct 14, 2026
    Supports: Town of Cable, Bayfield County; CAMBA's Wild River Trail on an abandoned railroad grade; 0.25-mile natural-surface connector across NPS land to Parker Road; planned uses; bikes allowed from March 21, 2022; first Riverway trail open to bikes
  3. St. Croix National Scenic Riverway finalizes bike rule for Cable Connector Trail — National Park Service news release (PDF) · government source · checked Oct 14, 2026
    Supports: 2020-2021 environmental assessment and Finding of No Significant Impact; regulation published February 17, 2022; built in partnership with CAMBA from the end of a segment of the Wild River Trail on a former railroad grade; winter uses; no equestrian or motorized use
  4. About Us — Chequamegon Area Mountain Bike Association · organization · checked Oct 14, 2026
    Supports: CAMBA is a 501(c)(3) nonprofit managing over 130 miles of mountain bike trails and 200+ miles of gravel routes in and around the Chequamegon-Nicolet National Forest and Bayfield and northern Sawyer county forests
  5. Way: Wild River Trail (956045285) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: unpaved path on an abandoned railway; with neighbouring ways, the bridge near the south end and the north end near Pine Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.