William C O'Neill Bike Path
Rail-trail in Rhode Island · OpenStreetMap relation
Runs through Kingston, South Kingstown, Wakefield-Peace Dale, Narragansett Pier and Narragansett · Washington County
Conditions now
Loading the weather near Wakefield-Peace Dale…
Forecast by the National Weather Service for Wakefield-Peace Dale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The William C. O'Neill Bike Path is a paved rail trail extending from Kingston station parking lot in West Kingston, Rhode Island, to Mumford Road in Narragansett, Rhode Island. The whole path is in Washington County, Rhode Island. The trail is 6.8 miles (11 km) long, largely on the former right of way of the Narragansett Pier Railroad. An extension opened up to the University of Rhode Island in 2019. A future extension will bring it to Boston Neck Road.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Mumford Road mile 0 directions to trailhead 1
- Parking at Patton Avenue mile 1 directions to trailhead 2
- Parking at Kingstown Road mile 1.1 directions to trailhead 3
- Parking at Kingstown Road mile 1.1 directions to trailhead 4
- Parking at Kingstown Road mile 1.2 directions to trailhead 5
- Parking at Robinson Street mile 1.7 directions to trailhead 6
- Parking at Robinson Street mile 1.7 · restrooms directions to trailhead 7
- Parking at Robinson Street mile 1.7 directions to trailhead 8
- Parking at Robinson Street mile 1.7 · restrooms directions to trailhead 9
- Parking at Main Street mile 1.7 · restrooms directions to trailhead 10
- Parking at Main Street mile 1.7 · restrooms directions to trailhead 11
- Parking at Main Street mile 1.7 · restrooms directions to trailhead 12
- Parking at Main Street mile 1.8 · restrooms directions to trailhead 13
- Parking mile 2.5 directions to trailhead 14
- Parking at Kingstown Road mile 2.6 directions to trailhead 15
- Parking at Kingstown Road mile 2.6 directions to trailhead 16
- Parking at Kingstown Road mile 2.7 directions to trailhead 17
- Parking at Kersey Road mile 2.7 directions to trailhead 18
- Parking at Kingstown Road mile 2.7 directions to trailhead 19
- Parking at Kingstown Road mile 2.8 directions to trailhead 20
- Parking at Kingstown Road mile 2.8 directions to trailhead 21
- Parking at Kingstown Road mile 2.9 directions to trailhead 22
- Parking at Kersey Road mile 2.9 directions to trailhead 23
- Parking at Sweet Fern Lane mile 3 directions to trailhead 24
- Parking at Dam Street mile 3.1 · water directions to trailhead 25
- Parking at Curtis Corner Road mile 4 directions to trailhead 26
- Parking at Curtis Corner Road mile 4 directions to trailhead 27
- Parking mile 4.1 directions to trailhead 28
- Parking at Railroad Avenue mile 7.3 directions to trailhead 29
Plan your visit
- By trainAmtrak: Kingston, RI (KIN) under 0.1 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
About this trail
The William C. O'Neill Bike Path, also known as the South County Bike Path, is a paved rail trail in Washington County, Rhode Island, running 7.8 miles from Kingston Station in West Kingston, South Kingstown, to Mumford Road in Narragansett; 7.3 miles are mapped here. It largely follows the former Narragansett Pier Railroad, which opened in 1876 to connect the mills of Wakefield and Peace Dale with the New York, Providence and Boston Railroad at West Kingston. Passenger service ended in 1952, and railroad operations ceased in the late 1960s. The path is named for the late Senator William C. O'Neill, who advocated reusing the corridor so that children could ride to school more safely.
The path was built in phases: 4.1 miles from Kingston Station to Rodman Street in 2000, 2.9 miles on to Route 108 in 2003, and 0.8 miles to Mumford Road, opened by Governor Lincoln Chafee on July 27, 2011. From Kingston Station it runs briefly beside Amtrak's Northeast Corridor, then along the northern edge of the Great Swamp Management Area. It follows Railroad Avenue on-road through Peace Dale, crosses the Saugatucket River into Wakefield, and passes through a tunnel used as a public art space. A 2-mile connector to West Alumni Avenue at the University of Rhode Island opened in 2019, and a 0.3-mile extension from Mumford Road toward the Narragansett Community Center was under construction in 2020.
The route is mostly flat, descending gradually from west to east; approaching Route 108 a series of switchbacks is best walked. The Rhode Island Department of Transportation lists the South Kingstown Recreation Department and the Narragansett Parks and Recreation Department as maintenance contacts. Parking is at Kingston Station, temporarily in the overflow lot north of Route 138, and at Main Street and Robinson Street in Wakefield. The Friends of the South County Bike Path, formed in 1995, worked to create the path.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 84% of this route as a trail on former railroad right-of-way.
- Shade
59% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Kingston 1 W, 3.1 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 46 56 66 75 80 79 73 62 52 43 Low °F 19 21 27 36 45 54 60 59 52 41 32 25 Precipitation, in 4.2 3.9 5.7 4.5 3.6 4 3.3 4.1 4.3 4.5 4.4 5.2 - Wildlife refuges
Passes beside John H. Chafee National Wildlife Refuge.
- On the National Register
- Kingston Railroad Station, South Kingstown · building, listed 1978 · nomination file for Kingston Railroad Station
- Wakefield Historic District, South Kingstown · historic district, listed 2022 · nomination file for Wakefield Historic District
- Peace Dale Historic District, South Kingstown · historic district, listed 1987 · nomination file for Peace Dale Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1889 Charlestown sheet (1:62,500); the 1957 Kingston sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- URI Connector Bike Path within 0.2 mi · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9709939, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “William C. O'Neill Bike Path”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q24824024, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- South County Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026 Supports: 7.8 miles Kingston Station to Mumford Road, phases 2000 (4.1 mi), 2003 (2.9 mi), 2011 (0.8 mi), 2019 URI connector, 2020 extension toward the Narragansett Community Center, Narragansett Pier Railroad 1876, operations ceased late 1960s, Senator O'Neill, Northeast Corridor, Great Swamp Management Area, Railroad Avenue in Peace Dale, Saugatucket River, tunnel art space, switchbacks, west-to-east grade, maintenance contacts, parking
- Governor Chafee, RIDOT Open Next Segment of the William C. O'Neill (South County) Bike Path — RI.gov (July 27, 2011) · government source · checked Oct 13, 2026 Supports: 0.8-mile segment to Mumford Road opened July 27, 2011
- William C. O'Neill Bike Path — Wikipedia · organization · checked Oct 13, 2026 Supports: South County Bike Path name, Washington County, railroad connecting Wakefield and Peace Dale mills with the New York, Providence and Boston Railroad, passenger service ended 1952, Friends of the South County Bike Path formed 1995
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
