Winnipesaukee Trail
Rail-trail in New Hampshire · OpenStreetMap relation
Runs through Franklin, Northfield and Tilton Northfield · Merrimack County
Conditions now
Loading the weather near Tilton Northfield…
Forecast by the National Weather Service for Tilton Northfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Cross Mill Road mile 1.1 directions to trailhead 1
(opens in a new tab) About this trail
The Winnipesaukee Trail is the western part of the Winnipesaukee River Trail, a multi-use path along the Winnipesaukee River linking Franklin, Northfield and Tilton, New Hampshire. The mapped section covers about 3 miles from Franklin east into Tilton; the Lakes Region Planning Commission gives the whole trail's current length as 5.9 miles, from Franklin to Route 140 in Tilton. The trail was developed by the Winnipesaukee River Trail Association, an all-volunteer 501(c)(3) nonprofit formed in 1999 that works with the three towns as a public-private partnership and has raised more than $300,000 in private grants and donations.
The first phase, from Franklin to Northfield, was built in 2005, and the second, from Northfield to Route 140 in Tilton, in 2010. In 2025 Tilton and the association applied for federal Transportation Alternatives funds toward a $594,360 design, engineering and right-of-way budget for a third phase: 1.9 miles east from Route 140 at Exit 20 to Silver Lake Road in Lochmere near the Belmont line, planned as a rail-with-trail beside the state-owned Concord to Lincoln railroad corridor, which still carries freight.
The western end is at Trestle View Park in downtown Franklin, and the surface combines pavement with crushed stone, dirt and gravel. In Tilton the trail reaches East Main Street at a short gap and resumes at Gibson Mill Road off Park Street before continuing east past Interstate 93 to Tilton Road. The Sulphite Railroad Bridge can be seen from the trail: a Pratt truss built by the Boston and Maine Railroad around 1896–97 with the rails on its roof, believed to be the only surviving upside-down covered railroad bridge in the United States. It replaced an 1892 trestle of the Franklin and Tilton Railroad and carried sulfite to Franklin's paper mills until the line shut down in 1973; it was listed on the National Register of Historic Places in 1975.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 84% of this route as a trail on former railroad right-of-way.
Franklin - Tilton, Concord - Lincoln Branch and State of New Hampshire - Abandoned. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
67% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Salisbury, 13.6 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 42 55 67 75 80 79 71 58 47 36 Low °F 13 15 22 31 41 51 57 55 46 36 29 20 Precipitation, in 3.3 3.2 3.5 4 4.1 4.5 4.1 4.4 3.9 5.1 4.1 4.3 - On the National Register
- Sulphite Railroad Bridge, Franklin · structure, listed 1975 · nomination file for Sulphite Railroad Bridge
- Franklin Falls Historic District, Franklin · historic district, listed 1982 · nomination file for Franklin Falls Historic District
- Concord Historic District, Concord · historic district, listed 1975 · nomination file for Concord Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1927 Penacook sheet (1:62,500); the 1956 Penacook sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Northern Rail Trail 0.9 mi away · 58.0 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9728460, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tilton, NH TAP Application: Winnipesaukee River Trail Phase III — Lakes Region Planning Commission · government source · checked Oct 13, 2026 Supports: Winnipesaukee River Trail Association (1999, 501(c)(3), volunteers, three towns, $300,000 raised), 5.9-mile current length to Route 140, 2005 and 2010 phases, proposed Phase III route, cost and rail-with-trail corridor
- Sulphite Railroad Bridge — Wikipedia · organization · checked Oct 13, 2026 Supports: bridge visible from the trail, Pratt truss, Boston and Maine c. 1896–97, upside-down covered bridge, 1892 Franklin and Tilton Railroad trestle, sulfite to paper mills, 1973 closure, 1975 National Register listing
- New Hampshire Lakes Region: Winnipesaukee River Trail — Great Runs · web · checked Oct 13, 2026 Supports: Trestle View Park and Tilton Road endpoints, surface, gap at East Main Street and Gibson Mill Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.