States › Tennessee

Wolf River Greenway - Kennedy Park Section

Greenway in Tennessee

Runs through Memphis · Shelby County

Conditions now

Loading the weather near Memphis…

Forecast by the National Weather Service for Memphis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Wolf River Greenway Memphis TN 01 (opens in a new tab)
Wolf River Greenway Memphis TN 01 · Photo: Thomas R Machnitzki · CC BY 3.0 · Wikimedia Commons

About this trail

The Kennedy Park section is a 1.5-mile stretch of the Wolf River Greenway in John F. Kennedy Park, Memphis, Tennessee, mapped here at about 1.4 miles. The Wolf River Conservancy says it opened in 2018 and runs through mature forest along the rolling hills and banks of the Wolf River, with six bridges. The conservancy lists three access points, two of them inside the park, and an address of 4375 Raleigh LaGrange Road. An unpaved nature trail and a boardwalk run next to the greenway trail. The section belongs to the Wolf River Greenway, a planned 26-mile corridor built by the conservancy, Memphis Parks and Shelby County; see the parent trail, wolf-river-greenway.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

61% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Memphis Wfo, 12.4 km from the trail's middle, 23 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495463738188919185756252
Low °F303340495968716962503933
Precipitation, in4.34.85.75.85.54.74.53.43.74.24.85.7
Snow, in0.81.10.8000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1956 Blytheville sheet (1:250,000); the 1965 Northeast Memphis sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Wolf River Greenway — Wolf River Conservancy · organization · checked Oct 18, 2026
    Supports: Kennedy Park section: opened 2018, 1.5 miles, six bridges, access points, address, nature trail and boardwalk; 26-mile plan and partners

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.