Wolftever Greenway
Greenway in Tennessee
Runs through Collegedale · Hamilton County
Conditions now
Loading the weather near Collegedale…
Forecast by the National Weather Service for Collegedale · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at McKee Road mile 0.1 · water directions to trailhead 1
- Parking at McKee Road mile 0.1 · water directions to trailhead 2
- Parking at McKee Road mile 0.1 · restrooms · water directions to trailhead 3
- Parking at Tucker Road mile 0.3 · restrooms · water directions to trailhead 4
- Ooltewah Middle School's Parking Lot mile 1.4 · restrooms · water directions to Ooltewah Middle School's Parking Lot
- Parking at Main Street mile 1.4 · restrooms · water directions to trailhead 6
- Parking at Main Street mile 1.5 · restrooms · water directions to trailhead 7
- Parking at Main Street mile 1.5 directions to trailhead 8
- Parking at Main Street mile 1.5 · restrooms · water directions to trailhead 9
- Parking at Main Street mile 1.5 directions to trailhead 10
- Parking at Main Street mile 1.7 directions to trailhead 11
- Parking at Main Street mile 1.7 directions to trailhead 12
- Parking at Main Street mile 1.7 · restrooms · water directions to trailhead 13
- Parking mile 1.7 directions to trailhead 14
- Parking mile 1.8 · water directions to trailhead 15
- Parking at Apison Pike mile 2.1 directions to trailhead 16
- Parking at Leyland Drive mile 2.5 directions to trailhead 17
(opens in a new tab) About this trail
The Wolftever Greenway, more widely called the Wolftever Creek Greenway, is a concrete multi-use path of about 2.6 to 2.9 miles in Collegedale, in southeastern Hamilton County, Tennessee, part of the Chattanooga metropolitan area. It follows Wolftever Creek through the city, and the City of Collegedale's Parks and Recreation Department, which manages it among the city's parks, continues to extend it. TrailLink classes it as a rail-trail because part of the route runs along a railroad right-of-way; riders report an active railroad beside the path.
TrailLink's description, which reports the greenway's extent as of 2011, has the route starting at the Imagination Station Playground behind City Hall, passing under Apison Pike, crossing Wolftever Creek and reaching a pond on Ooltewah-Ringgold Road. From there a bridge carries the path over the road, and it runs east on the far side of the creek to Spalding Drive, then across Tucker Road to the Nature Nook at Tallant Road and Apison Pike. In that description it ends on Southern Adventist University property near Tallant Road, with planned extensions that include a Robinson Farm connection along the railroad and a segment from Apison Pike to the Landrem subdivision. Veterans Memorial Park, with plaques, sculptures and flags honoring United States war veterans, lies along the greenway.
The path is paved in concrete. Parking is available at the Nature Nook, at Tallant Road and Apison Pike, and at the Tucker Road Recreational Area, at Tucker Road and Apison Pike. Along the way are a playground, a dog park, picnic tables and restrooms. Reviewers note that the path is narrow and has sharp turns in places and that it is busy with walkers on weekends.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chattanooga Lovell Airport, 13.1 km from the trail's middle, 30 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 51 56 64 74 81 88 90 90 84 74 62 53 Low °F 32 36 42 50 59 67 71 70 64 51 40 35 Precipitation, in 5 5 5.3 4.9 3.9 4.2 5.1 3.7 4.2 3.6 4.8 5.2 Snow, in 1 1.2 1.1 0 0 0 0 0 0 0 0 0.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Chattanooga sheet (1:125,000); the 1964 Ooltewah sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Collegedale, Tennessee — Wikipedia · organization · checked Oct 15, 2026 Supports: Wolftever Creek Greenway managed by Collegedale Parks and Recreation, spans the city and continues to be expanded, Veterans Memorial Park along the greenway with plaques, sculptures and flags, city in the valley of Wolftever Creek, location in southeastern Hamilton County in the Chattanooga metropolitan area
- Wolftever Creek Greenway — TrailLink · web · checked Oct 15, 2026 Supports: 2.9 miles, concrete surface, rail-trail category, part along a railroad right-of-way, route from Imagination Station behind City Hall to Tallant Road, end on Southern Adventist University property, planned Robinson Farm and Landrem extensions, parking at the Nature Nook and Tucker Road Recreational Area, playground, dog park, picnic tables, reviewers on the active railroad, restrooms, narrow path, sharp turns and weekend crowds
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 15, 2026 Supports: the name Wolftever Greenway, length of about 2.6 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.