WV Northern Rail-Trail
Rail-trail in West Virginia · OpenStreetMap relation
Runs through Kingwood and Tunnelton · Preston County
Conditions now
Loading the weather near Kingwood…
Forecast by the National Weather Service for Kingwood · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sisler Street mile 0.4 directions to trailhead 1
(opens in a new tab) About this trail
The WV Northern Rail-Trail is a rail-trail under development on the former West Virginia Northern Railroad between Kingwood and Tunnelton in Preston County, West Virginia. The Preston County Parks and Recreation Commission manages it. The finished trail is planned to run 10 miles; the West Virginia Rails-to-Trails Council lists 3 miles open in two disconnected sections, and this record maps about 2.4 miles in two pieces, one at Kingwood and one at Tunnelton.
The West Virginia Northern was a short-line railroad that from 1886 to 1991 carried coal from Preston County mines to the Baltimore and Ohio interchange at Tunnelton. Kingwood Northern, Inc. ran it as a tourist railroad from August 1994 until 1999. Kern Valley Railroad bought the line in the early 2000s, mainly for its scrap value, and the tracks were gone by 2005. Most structures at the former Kingwood Junction yard were removed in the late 2010s, and plans call for rebuilding its water tower as a gateway to the trail.
The Kingwood section, about 2 miles, opened in 2020 from the Kingwood Trailhead Park at 147 Sisler Street, which has split-log benches, a natural playground and a weather shelter; a $420,000 Recreational Trails Program award paid for its design and construction. A separate section of about a mile near Tunnelton begins at the Tunnelton Trailhead, 755 Campground Road, which has a community park, a fitness station, game tables, cornhole and bocce courts and a weather shelter; parking there is beside Biggins' convenience store on Route 26. The surface is compacted stone, used for walking, running, bicycling and cross-country skiing. The commission is seeking funding to build the rest of the corridor and join the two sections.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
68% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rowlesburg 1, 13.4 km from the trail's middle, 79 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 42 51 64 72 79 82 82 76 65 53 42 Low °F 20 22 29 37 48 57 61 60 54 41 31 25 Precipitation, in 4.4 4.1 5 4.9 5.4 5.5 6.6 4.7 4.4 3.9 3.7 4.7 Snow, in 19.7 13.3 10.2 0.8 0 0 0 0 0 0.1 2.2 10.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 St. George sheet (1:125,000); the 1960 Kingwood sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationWest Virginia Rails-to-Trails Council — WV Northern Rail-Trail
Nearby trails
- Deckers Creek Trail 4.7 mi away · 19.7 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17360320, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- WV Northern Rail-Trail — West Virginia Rails To Trails · organization · checked Oct 14, 2026 Supports: open and under construction; 3.0 miles open; planned 10 miles between Kingwood and Tunnelton, Preston County; manager Preston County Parks and Recreation Commission; Kingwood section of two miles from the Kingwood Trailhead Park, 147 Sisler Street, opened 2020, with benches, natural playground and weather shelter; $420,000 Recreational Trails Program award; Tunnelton section of about one mile from the Tunnelton Trailhead, 755 Campground Rd, with community park, fitness station, game tables, cornhole, bocce and weather shelter; parking beside Biggins' convenience store on Route 26; compacted stone; walking, running, biking, mountain biking, cross-country skiing; seeking funding for the remaining corridor
- West Virginia Northern Railroad — Wikipedia · organization · checked Oct 14, 2026 Supports: short line from Kingwood to Tunnelton operating 1886 to 1991; coal from Preston County mines to the B&O interchange at Tunnelton; tourist railroad by Kingwood Northern, Inc. from August 1994, ended 1999; Kern Valley Railroad purchase for scrap in the early 2000s; tracks removed by 2005; Kingwood Junction yard structures removed in the late 2010s; plan to rebuild the water tower as a trail gateway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.