Alewife Brook Greenway
Greenway in Massachusetts · OpenStreetMap relation
Runs through Somerville, Arlington and Cambridge · Middlesex County
Conditions now
Loading the weather near Arlington…
Forecast by the National Weather Service for Arlington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Alewife Brook Parkway mile 0.3 directions to trailhead 1
- Parking at Decatur Street mile 0.5 directions to trailhead 2
- Parking at Alewife Brook Parkway mile 0.7 directions to trailhead 3
- Parking at Capen Court mile 0.7 directions to trailhead 4
- Parking at Capen Court mile 0.7 directions to trailhead 5
- Parking at Stephenson Aman Street mile 1.1 directions to trailhead 6
- Parking at Broadway mile 1.2 directions to trailhead 7
- Parking at Alewife Brook Parkway mile 1.3 directions to trailhead 8
- Parking at Alewife Brook Parkway mile 1.4 directions to trailhead 9
- Parking at Matignon Road mile 1.5 directions to trailhead 10
- Parking at Sunapee Road mile 1.6 directions to trailhead 11
- Parking at Sunapee Road mile 1.6 directions to trailhead 12
- Parking at Acorn Park Drive mile 2.3 directions to trailhead 13
(opens in a new tab) About this trail
The Alewife Brook Greenway, usually called the Alewife Greenway, is a bicycle and pedestrian path along Alewife Brook and the Alewife Brook Parkway in Cambridge, Somerville and Arlington, Massachusetts, linking the Minuteman Bikeway with the Mystic River Reservation. It runs through the Alewife Brook Reservation, a 136-acre state park and urban wild managed by the Massachusetts Department of Conservation and Recreation. This record maps about 2.5 miles, the length Boston.com gave at completion; Wikipedia gives 1.5 miles. It is not a rail trail.
The reservation was established in 1900, planned by landscape designer Charles Eliot together with the Alewife Brook Parkway as part of the Metropolitan Park District; the brook beside the parkway was straightened and channelized from 1909 to 1912. The path was built over three years with federal stimulus money from the 2009 American Recovery and Reinvestment Act and completed in October 2012. The project also added two accessible paths within the reservation, restored sections of Alewife Brook and created pedestrian crossings at two major intersections.
Most of the path in Somerville and Cambridge is asphalt or boardwalk, and much of the Arlington section has a crushed-stone surface. The reservation's southern end is next to Alewife station on the MBTA Red Line; the Minuteman Bikeway ends at the reservation, and the Fitchburg Cutoff Path also runs through it. West of the station, a 3.4-acre stormwater wetland built by the City of Cambridge opened in October 2013.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boston Logan International Airport, 11.3 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 46 56 66 76 82 80 73 62 52 42 Low °F 23 25 31 41 50 60 66 65 58 48 38 29 Precipitation, in 3.4 3.2 4.2 3.6 3.2 3.9 3.3 3.2 3.6 4 3.7 4.3 Snow, in 14.3 14.4 9 1.6 0 0 0 0 0 0.2 0.7 9 - On the National Register
- Alewife Brook Parkway, Cambridge · historic district, listed 2004 · nomination file for Alewife Brook Parkway
- Mystic Valley Parkway, Metropolitan Park System of Greater Boston MPS, Arlington · historic district, listed 2006 · nomination file for Mystic Valley Parkway, Metropolitan Park System of Greater Boston MPS
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Lexington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Minuteman Bikeway within 0.2 mi · 10.1 mi, paved
- Mass Central Rail Trail within 0.2 mi · 70.4 mi, paved
- Alewife Linear Park within 0.2 mi · 1.3 mi, paved
- Fresh Pond Path 0.7 mi away · 2.5 mi, paved
- Watertown-Cambridge Greenway 0.9 mi away · 2.7 mi, paved
- Dr. Paul Dudley White Path 1.7 mi away · 17.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11890261, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Alewife Brook Reservation — Wikipedia · organization · checked Oct 13, 2026 Supports: DCR management, 136 acres, Cambridge, Somerville and Arlington, established 1900, Charles Eliot and the parkway, Metropolitan Park District, channelization 1909–1912, Alewife Greenway 1.5 miles from the Mystic River to the Minuteman Bikeway, ARRA funding, completed October 2012, Minuteman and Fitchburg Cutoff Path, Alewife station, 3.4-acre stormwater wetland opened October 2013
- New path links Alewife, Mystic areas — Boston.com (November 4, 2012) · press · checked Oct 13, 2026 Supports: 2.5 miles through Arlington, Cambridge and Somerville linking the Minuteman Bikeway and the Mystic River Reservation, three years of work, ARRA grant, two accessible paths, brook restoration, two intersection crossings, asphalt or boardwalk in Somerville and Cambridge and crushed stone in Arlington
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.