Minuteman Bikeway
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Bedford, Lexington and Arlington · Middlesex County
Conditions now
Loading the weather near Lexington…
Forecast by the National Weather Service for Lexington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Minuteman Bikeway, also known as the Minuteman Commuter Bikeway, is a 10-mile (16-kilometre) paved multi-use rail trail located in the Greater Boston area of Massachusetts. It runs from Bedford to Alewife station, at the northern end of the Red Line in Cambridge, passing through the towns of Lexington and Arlington along the way. Also along the route are several notable regional sites, including Alewife Brook Reservation, the Cyrus Dallin Art Museum, Spy Pond, "Arlington’s Great Meadows", the Battle Green in Lexington, and Hanscom Air Force Base.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Deangelo Drive mile 0.1 directions to trailhead 1
- Parking at Patriots Park mile 0.6 directions to trailhead 2
- Parking at Valley Road mile 2.3 directions to trailhead 3
- Parking at Valley Road mile 2.3 directions to trailhead 4
- Parking at C.W. Trans Way mile 2.5 directions to trailhead 5
- Parking at Bedford Street mile 2.6 · water directions to trailhead 6
- Parking at Bedford Street mile 2.7 · water directions to trailhead 7
- Parking at Bedford Street mile 2.7 · water directions to trailhead 8
- Parking at Revere Street mile 3.1 directions to trailhead 9
- Parking at Edison Way mile 3.9 · water directions to trailhead 10
- Parking at Grant Street mile 4 directions to trailhead 11
- Parking at Grant Street mile 4 directions to trailhead 12
- Parking at Hayes Lane mile 4.2 directions to trailhead 13
- Parking at Woburn Street mile 4.2 directions to trailhead 14
- Parking at Woburn Street mile 4.3 directions to trailhead 15
- Parking at Barnes Place mile 5.6 directions to trailhead 16
- Parking at Massachusetts Avenue mile 5.9 directions to trailhead 17
- Parking at Massachusetts Avenue mile 5.9 directions to trailhead 18
- Parking at Fottler Avenue mile 6 directions to trailhead 19
- Parking at Massachusetts Avenue mile 6.1 directions to trailhead 20
- Parking at Bow Street mile 6.2 · water directions to trailhead 21
- Parking at Bow Street mile 6.2 · water directions to trailhead 22
- Parking at Massachusetts Avenue mile 6.2 · water directions to trailhead 23
- Parking at Massachusetts Avenue mile 6.2 · water directions to trailhead 24
- Parking at Massachusetts Avenue mile 6.3 · water directions to trailhead 25
- Parking at Massachusetts Avenue mile 6.3 directions to trailhead 26
- Parking at Drake Road mile 6.5 · restrooms · water directions to trailhead 27
- Parking at Massachusetts Avenue mile 6.5 · restrooms directions to trailhead 28
- Parking at Massachusetts Avenue mile 6.6 · restrooms · water directions to trailhead 29
- Parking at Colonial Village Drive mile 6.6 directions to trailhead 30
- Parking at Massachusetts Avenue mile 6.6 directions to trailhead 31
- Parking at Colonial Village Drive mile 6.7 directions to trailhead 32
- Parking at Paul Revere Road mile 6.7 directions to trailhead 33
- Parking at Massachusetts Avenue mile 6.7 directions to trailhead 34
- Parking at Park Avenue mile 6.8 directions to trailhead 35
- Parking at Park Avenue mile 6.8 directions to trailhead 36
- Parking at Lowell Street mile 6.8 directions to trailhead 37
- Parking at Lowell Street mile 6.9 directions to trailhead 38
- Parking at Viking Court mile 6.9 directions to trailhead 39
- Parking at Ryder Street mile 7.3 directions to trailhead 40
- Parking at Brattle Court mile 7.6 directions to trailhead 41
- Parking at Dudley Street mile 7.7 directions to trailhead 42
- Parking at Grove Street mile 7.9 directions to trailhead 43
- Parking at Mill Street mile 8.3 directions to trailhead 44
- Parking at Mill Street mile 8.3 directions to trailhead 45
- Parking at Summer Street mile 8.3 directions to trailhead 46
- Parking at Court Street mile 8.4 directions to trailhead 47
- Parking at Court Street mile 8.4 directions to trailhead 48
- Parking at Russell Place mile 8.4 directions to trailhead 49
- Parking at Water Street mile 8.4 directions to trailhead 50
- Parking at David Lamson Way mile 8.5 directions to trailhead 51
- Parking at Winslow Street mile 8.5 directions to trailhead 52
- Parking at Prescott Street mile 8.5 directions to trailhead 53
- Parking at Winslow Street mile 8.5 directions to trailhead 54
- Parking at Winslow Street mile 8.5 directions to trailhead 55
- Parking at Pleasant Street mile 8.6 directions to trailhead 56
- Parking at Swan Place mile 8.6 directions to trailhead 57
- Parking at Winslow Street mile 8.6 directions to trailhead 58
- Parking at Winslow Street mile 8.7 directions to trailhead 59
- Parking at Swan Place mile 8.7 directions to trailhead 60
- Parking at Park Terrace mile 8.7 directions to trailhead 61
- Parking at Swan Street mile 8.7 directions to trailhead 62
- Parking at Medford Street mile 8.7 directions to trailhead 63
- Parking at Medford Street mile 8.7 directions to trailhead 64
- Parking at Whittemore Street mile 8.8 directions to trailhead 65
- Spy Pond Parking Lot mile 8.9 · water directions to Spy Pond Parking Lot
- Parking at Wyman Terrace mile 9 · water directions to trailhead 67
- Parking at Adams Street mile 9.1 directions to trailhead 68
- Parking at Hamilton Road mile 9.3 directions to trailhead 69
- School parking mile 9.5 directions to School parking
- Parking at Lake Street mile 9.5 directions to trailhead 71
- Parking at Margaret Street mile 9.8 · water directions to trailhead 72
(opens in a new tab) About this trail
The Minuteman Bikeway, also called the Minuteman Commuter Bikeway, is a paved rail trail of about 10 miles in Greater Boston, Massachusetts. It runs from Bedford through Lexington and Arlington to Alewife station, the northern end of the MBTA Red Line, in Cambridge. The MBTA owns the right-of-way and leases it to the four communities, which manage and maintain the path; the Commonwealth built it. The corridor was laid out east of Lexington in 1846 by the Lexington and West Cambridge Railroad and west of Lexington in 1873 by the Middlesex Central Railroad. Passenger service ended about 1977 and all rail service in 1981.
A bike path on the line was proposed in 1974. Construction began in 1991, and the corridor was railbanked in July 1992. The Arlington–Lexington section was dedicated in September 1992, and the Lexington–Bedford section, delayed by water main work, opened in May 1993. The path was extended from East Arlington to Alewife in 1998. In 2008 it became the fifth trail inducted into the Rail-Trail Hall of Fame of the Rails-to-Trails Conservancy. At Alewife it connects with the Fitchburg Cutoff Path, Alewife Linear Park toward the Somerville Community Path, and the Alewife Brook Greenway; in Bedford it meets the Narrow Gauge Rail Trail and the Reformatory Branch Trail.
The path is used for cycling, walking, jogging and inline skating; motor vehicles are banned except powered wheelchairs and emergency vehicles, and the path is plowed in winter from Alewife to Bedford. The bikeway ends at Depot Park in Bedford. MassDOT project 607738 would extend it west along the Reformatory Branch Trail for about 1.7 miles to the Concord–Bedford town line as a 12-foot path, with a box culvert under Concord Road; MassDOT's project page records the 100 percent design stage in February 2022 and lists no construction contract. Arlington's planning department is running a Minuteman Bikeway Planning Project on safety, access and improvements.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
52% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bedford, 7.6 km from the trail's middle, 8 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 39 47 59 70 78 84 82 74 62 51 41 Low °F 18 19 27 36 46 55 61 60 52 40 31 23 Precipitation, in 3.8 3.4 4.8 3.9 3.8 4.1 3.8 3.9 3.7 4.8 4.1 4.8 Snow, in 16.1 12.5 12.9 2.3 0 0 0 0 0 0.1 1.9 13.2 - On the National Register
- Bedford Depot, Bedford · historic district, listed 2003 · nomination file for Bedford Depot
- Arlington Pumping Station, Arlington · building, listed 1985 · nomination file for Arlington Pumping Station
- Old Schwamb Mill, Arlington · building, listed 1971 · nomination file for Old Schwamb Mill
- Arlington Center Historic District (Boundary Increase), Arlington · historic district, listed 1985 · nomination file for Arlington Center Historic District (Boundary Increase)
- Arlington Center Historic District, Arlington · historic district, listed 1974 · nomination file for Arlington Center Historic District
- Orvis Road Historic District, Arlington · historic district, listed 1985 · nomination file for Orvis Road Historic District
- Lexington Green, Lexington · site, listed 1966 · nomination file for Lexington Green
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Lexington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 4
Community
What riders say on Reddit
- Riders in November 2025 reported the path closed in Lexington between Maple and Bow streets, tied to water main work expected into winter, with little signage and a Massachusetts Avenue detour. r/bikeboston, Nov 2025
- Riders in May 2025 said the path gets crowded with walkers, children and strollers, especially around Arlington and on weekend afternoons, limiting speed; one rider used Massachusetts Avenue to bypass the busiest stretch. r/bikeboston, May 2025
- Riders in November 2024 described parts of the path as unlit after dark and advised a bright headlight aimed at the path, not at faces; some said unlit walkers were hard to spot. r/bikeboston, Nov 2024
- Two people in August 2024 reported the Bedford Depot Park restrooms locked early in the morning despite a posted 7 a.m. opening, one on weekends and one on a weekday. r/bikeboston, Aug 2024
11 Reddit threads about this trail, Jul 2024 to Nov 2025
- Minuteman section closed today r/bikeboston · Nov 2025 · 11 comments
- Access to Road Cycling from Cambridge r/bikeboston · May 2025 · 19 comments
- [Minuteman Bikeway] PSA to all joggers, dog walkers, and general pedestrians r/bikeboston · Nov 2024 · 41 comments
- Restroom in Bedford Depot park not open? r/bikeboston · Aug 2024 · 3 comments
- E-bike Commute From Cambridge -> Burlington r/bikeboston · Mar 2025 · 9 comments
- History of cleared snow on popular bike paths? ❄️ r/bikeboston · Jan 2025 · 21 comments
- Minuteman Bikeway Bridge closing June 9, detour map released r/bikeboston · Jun 2025 · 5 comments
- Boston Globe: 8/6 Two people suffer life-threatening injuries in separate bike, scooter crashes in Boston r/bikeboston · Aug 2025 · 86 comments
- Where do you go in order to see a good sunrise? r/bikeboston · Dec 2024 · 16 comments
- Cyclists Are Dying in Cambridge. Copenhagen Might Have The Answer. | Opinion | The Harvard Crimson r/CambridgeBikeSafety · Nov 2024 · 7 comments
- Best paved trails for road bikes in the U.S.? r/cycling · Jul 2024 · 92 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMinuteman Commuter Bikeway
- Trail organizationBedford Friends of the Minuteman Bikeway
- Trail organizationArlington Bicycle Advisory Committee
- RedditSearch Reddit: r/massachusetts
Nearby trails
- Mass Central Rail Trail within 0.2 mi · 70.4 mi, paved
- Alewife Brook Greenway within 0.2 mi · 2.5 mi, paved
- Narrow Gauge Rail Trail within 0.2 mi · 3.0 mi, crushed stone
- Alewife Linear Park within 0.2 mi · 1.3 mi, paved
- Reformatory Branch Trail 0.3 mi away · 3.8 mi, dirt
- Fresh Pond Path 0.7 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 147539, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Minuteman Bikeway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q12061865, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Project 607738: Bedford, Minuteman Bikeway Extension (Loomis Street to Concord Road/Route 62) — MassDOT Highway Division project information · government source · checked Oct 13, 2026 Supports: bikeway currently ends at Depot Park, extension along the Reformatory Branch Trail, 100% design package comments February 23, 2022, no contracts listed
- BEDFORD - Minuteman Bikeway Extension project (public hearing notice) — MassDOT Highway Division, Mass.gov · government source · checked Oct 13, 2026 Supports: 12-foot path along the Reformatory Branch Trail to the Concord–Bedford town line, about 1.7 miles, box culvert under Concord Road
- Minuteman Bikeway — Wikipedia · organization · checked Oct 13, 2026 Supports: length, endpoints and towns, MBTA ownership and lease, 1846 and 1873 railroads, end of passenger service about 1977 and of rail service in 1981, 1974 proposal, 1991 construction, July 1992 railbanking, 1992 and 1993 openings, 1998 Alewife extension, 2008 Hall of Fame, connections, permitted uses, motor vehicle ban, winter plowing
- Minuteman Commuter Bikeway · organization · checked Oct 13, 2026 Supports: managed and maintained by Bedford, Lexington, Arlington and Cambridge; built by the Commonwealth; Arlington's Minuteman Bikeway Planning Project
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.



