States › Massachusetts

Minuteman Bikeway

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Bedford, Lexington and Arlington · Middlesex County

Conditions now

Loading the weather near Lexington…

Forecast by the National Weather Service for Lexington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Minuteman Bikeway, also known as the Minuteman Commuter Bikeway, is a 10-mile (16-kilometre) paved multi-use rail trail located in the Greater Boston area of Massachusetts. It runs from Bedford to Alewife station, at the northern end of the Red Line in Cambridge, passing through the towns of Lexington and Arlington along the way. Also along the route are several notable regional sites, including Alewife Brook Reservation, the Cyrus Dallin Art Museum, Spy Pond, "Arlington’s Great Meadows", the Battle Green in Lexington, and Hanscom Air Force Base.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
10.1 mi 16.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Deangelo Drive mile 0.1 directions to trailhead 1
  2. Parking at Patriots Park mile 0.6 directions to trailhead 2
  3. Parking at Valley Road mile 2.3 directions to trailhead 3
  4. Parking at Valley Road mile 2.3 directions to trailhead 4
  5. Parking at C.W. Trans Way mile 2.5 directions to trailhead 5
  6. Parking at Bedford Street mile 2.6 · water directions to trailhead 6
  7. Parking at Bedford Street mile 2.7 · water directions to trailhead 7
  8. Parking at Bedford Street mile 2.7 · water directions to trailhead 8
  9. Parking at Revere Street mile 3.1 directions to trailhead 9
  10. Parking at Edison Way mile 3.9 · water directions to trailhead 10
  11. Parking at Grant Street mile 4 directions to trailhead 11
  12. Parking at Grant Street mile 4 directions to trailhead 12
  13. Parking at Hayes Lane mile 4.2 directions to trailhead 13
  14. Parking at Woburn Street mile 4.2 directions to trailhead 14
  15. Parking at Woburn Street mile 4.3 directions to trailhead 15
  16. Parking at Barnes Place mile 5.6 directions to trailhead 16
  17. Parking at Massachusetts Avenue mile 5.9 directions to trailhead 17
  18. Parking at Massachusetts Avenue mile 5.9 directions to trailhead 18
  19. Parking at Fottler Avenue mile 6 directions to trailhead 19
  20. Parking at Massachusetts Avenue mile 6.1 directions to trailhead 20
  21. Parking at Bow Street mile 6.2 · water directions to trailhead 21
  22. Parking at Bow Street mile 6.2 · water directions to trailhead 22
  23. Parking at Massachusetts Avenue mile 6.2 · water directions to trailhead 23
  24. Parking at Massachusetts Avenue mile 6.2 · water directions to trailhead 24
  25. Parking at Massachusetts Avenue mile 6.3 · water directions to trailhead 25
  26. Parking at Massachusetts Avenue mile 6.3 directions to trailhead 26
  27. Parking at Drake Road mile 6.5 · restrooms · water directions to trailhead 27
  28. Parking at Massachusetts Avenue mile 6.5 · restrooms directions to trailhead 28
  29. Parking at Massachusetts Avenue mile 6.6 · restrooms · water directions to trailhead 29
  30. Parking at Colonial Village Drive mile 6.6 directions to trailhead 30
  31. Parking at Massachusetts Avenue mile 6.6 directions to trailhead 31
  32. Parking at Colonial Village Drive mile 6.7 directions to trailhead 32
  33. Parking at Paul Revere Road mile 6.7 directions to trailhead 33
  34. Parking at Massachusetts Avenue mile 6.7 directions to trailhead 34
  35. Parking at Park Avenue mile 6.8 directions to trailhead 35
  36. Parking at Park Avenue mile 6.8 directions to trailhead 36
  37. Parking at Lowell Street mile 6.8 directions to trailhead 37
  38. Parking at Lowell Street mile 6.9 directions to trailhead 38
  39. Parking at Viking Court mile 6.9 directions to trailhead 39
  40. Parking at Ryder Street mile 7.3 directions to trailhead 40
  41. Parking at Brattle Court mile 7.6 directions to trailhead 41
  42. Parking at Dudley Street mile 7.7 directions to trailhead 42
  43. Parking at Grove Street mile 7.9 directions to trailhead 43
  44. Parking at Mill Street mile 8.3 directions to trailhead 44
  45. Parking at Mill Street mile 8.3 directions to trailhead 45
  46. Parking at Summer Street mile 8.3 directions to trailhead 46
  47. Parking at Court Street mile 8.4 directions to trailhead 47
  48. Parking at Court Street mile 8.4 directions to trailhead 48
  49. Parking at Russell Place mile 8.4 directions to trailhead 49
  50. Parking at Water Street mile 8.4 directions to trailhead 50
  51. Parking at David Lamson Way mile 8.5 directions to trailhead 51
  52. Parking at Winslow Street mile 8.5 directions to trailhead 52
  53. Parking at Prescott Street mile 8.5 directions to trailhead 53
  54. Parking at Winslow Street mile 8.5 directions to trailhead 54
  55. Parking at Winslow Street mile 8.5 directions to trailhead 55
  56. Parking at Pleasant Street mile 8.6 directions to trailhead 56
  57. Parking at Swan Place mile 8.6 directions to trailhead 57
  58. Parking at Winslow Street mile 8.6 directions to trailhead 58
  59. Parking at Winslow Street mile 8.7 directions to trailhead 59
  60. Parking at Swan Place mile 8.7 directions to trailhead 60
  61. Parking at Park Terrace mile 8.7 directions to trailhead 61
  62. Parking at Swan Street mile 8.7 directions to trailhead 62
  63. Parking at Medford Street mile 8.7 directions to trailhead 63
  64. Parking at Medford Street mile 8.7 directions to trailhead 64
  65. Parking at Whittemore Street mile 8.8 directions to trailhead 65
  66. Spy Pond Parking Lot mile 8.9 · water directions to Spy Pond Parking Lot
  67. Parking at Wyman Terrace mile 9 · water directions to trailhead 67
  68. Parking at Adams Street mile 9.1 directions to trailhead 68
  69. Parking at Hamilton Road mile 9.3 directions to trailhead 69
  70. School parking mile 9.5 directions to School parking
  71. Parking at Lake Street mile 9.5 directions to trailhead 71
  72. Parking at Margaret Street mile 9.8 · water directions to trailhead 72
060528bikepath (opens in a new tab)
060528bikepath · Photo: Dan4th · CC BY · Flickr

About this trail

The Minuteman Bikeway, also called the Minuteman Commuter Bikeway, is a paved rail trail of about 10 miles in Greater Boston, Massachusetts. It runs from Bedford through Lexington and Arlington to Alewife station, the northern end of the MBTA Red Line, in Cambridge. The MBTA owns the right-of-way and leases it to the four communities, which manage and maintain the path; the Commonwealth built it. The corridor was laid out east of Lexington in 1846 by the Lexington and West Cambridge Railroad and west of Lexington in 1873 by the Middlesex Central Railroad. Passenger service ended about 1977 and all rail service in 1981.

A bike path on the line was proposed in 1974. Construction began in 1991, and the corridor was railbanked in July 1992. The Arlington–Lexington section was dedicated in September 1992, and the Lexington–Bedford section, delayed by water main work, opened in May 1993. The path was extended from East Arlington to Alewife in 1998. In 2008 it became the fifth trail inducted into the Rail-Trail Hall of Fame of the Rails-to-Trails Conservancy. At Alewife it connects with the Fitchburg Cutoff Path, Alewife Linear Park toward the Somerville Community Path, and the Alewife Brook Greenway; in Bedford it meets the Narrow Gauge Rail Trail and the Reformatory Branch Trail.

The path is used for cycling, walking, jogging and inline skating; motor vehicles are banned except powered wheelchairs and emergency vehicles, and the path is plowed in winter from Alewife to Bedford. The bikeway ends at Depot Park in Bedford. MassDOT project 607738 would extend it west along the Reformatory Branch Trail for about 1.7 miles to the Concord–Bedford town line as a 12-foot path, with a box culvert under Concord Road; MassDOT's project page records the 100 percent design stage in February 2022 and lists no construction contract. Arlington's planning department is running a Minuteman Bikeway Planning Project on safety, access and improvements.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

Shade

52% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bedford, 7.6 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363947597078848274625141
Low °F181927364655616052403123
Precipitation, in3.83.44.83.93.84.13.83.93.74.84.14.8
Snow, in16.112.512.92.3000000.11.913.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Lexington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Arlington, c. 1908: Railroad depot
Arlington, c. 1908: Railroad depotPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • Riders in November 2025 reported the path closed in Lexington between Maple and Bow streets, tied to water main work expected into winter, with little signage and a Massachusetts Avenue detour. r/bikeboston, Nov 2025
  • Riders in May 2025 said the path gets crowded with walkers, children and strollers, especially around Arlington and on weekend afternoons, limiting speed; one rider used Massachusetts Avenue to bypass the busiest stretch. r/bikeboston, May 2025
  • Riders in November 2024 described parts of the path as unlit after dark and advised a bright headlight aimed at the path, not at faces; some said unlit walkers were hard to spot. r/bikeboston, Nov 2024
  • Two people in August 2024 reported the Bedford Depot Park restrooms locked early in the morning despite a posted 7 a.m. opening, one on weekends and one on a weekday. r/bikeboston, Aug 2024
11 Reddit threads about this trail, Jul 2024 to Nov 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 147539, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Minuteman Bikeway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q12061865, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Project 607738: Bedford, Minuteman Bikeway Extension (Loomis Street to Concord Road/Route 62) — MassDOT Highway Division project information · government source · checked Oct 13, 2026
    Supports: bikeway currently ends at Depot Park, extension along the Reformatory Branch Trail, 100% design package comments February 23, 2022, no contracts listed
  6. BEDFORD - Minuteman Bikeway Extension project (public hearing notice) — MassDOT Highway Division, Mass.gov · government source · checked Oct 13, 2026
    Supports: 12-foot path along the Reformatory Branch Trail to the Concord–Bedford town line, about 1.7 miles, box culvert under Concord Road
  7. Minuteman Bikeway — Wikipedia · organization · checked Oct 13, 2026
    Supports: length, endpoints and towns, MBTA ownership and lease, 1846 and 1873 railroads, end of passenger service about 1977 and of rail service in 1981, 1974 proposal, 1991 construction, July 1992 railbanking, 1992 and 1993 openings, 1998 Alewife extension, 2008 Hall of Fame, connections, permitted uses, motor vehicle ban, winter plowing
  8. Minuteman Commuter Bikeway · organization · checked Oct 13, 2026
    Supports: managed and maintained by Bedford, Lexington, Arlington and Cambridge; built by the Commonwealth; Arlington's Minuteman Bikeway Planning Project

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.