States › Virginia

Arlington Boulevard Trail

Greenway in Virginia

Runs through Arlington · Arlington County

Conditions now

Loading the weather near Arlington…

Forecast by the National Weather Service for Arlington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Fairfax Drive mile 0 directions to trailhead 1
  2. Parking at Arlington Boulevard mile 0.1 directions to trailhead 2
  3. Parking at 16th Road North mile 0.1 directions to trailhead 3
  4. Parking at 16th Street North mile 0.2 directions to trailhead 4
  5. Parking at 16th Street North mile 0.2 directions to trailhead 5
  6. Parking at North Ode Street mile 0.3 directions to trailhead 6
  7. Parking at North Quinn Street mile 0.3 directions to trailhead 7
  8. Parking at North Quinn Street mile 0.3 directions to trailhead 8
  9. Parking at North Quinn Street mile 0.3 directions to trailhead 9
  10. Parking at 16th Street North mile 0.3 directions to trailhead 10
  11. Parking at North Queen Street mile 0.3 directions to trailhead 11
  12. Parking at 14th Street North mile 0.3 directions to trailhead 12
  13. Parking at 14th Street North mile 0.3 directions to trailhead 13
  14. Parking at Fairfax Drive mile 0.3 directions to trailhead 14
  15. Parking at 14th Street North mile 0.4 directions to trailhead 15
  16. Parking at North Quinn Street mile 0.4 directions to trailhead 16
  17. Parking at North Rolfe Street mile 0.5 directions to trailhead 17
  18. Parking at North Scott Street mile 0.5 directions to trailhead 18
  19. Parking at Fairfax Drive mile 0.6 directions to trailhead 19
  20. Parking at North Scott Street mile 0.6 directions to trailhead 20
  21. Parking at North Scott Street mile 0.6 directions to trailhead 21
  22. Parking at North Scott Street mile 0.6 directions to trailhead 22
  23. Parking at North Troy Street mile 0.7 directions to trailhead 23
  24. Parking at North Troy Street mile 0.7 directions to trailhead 24
  25. Parking at 13th Street North mile 0.7 directions to trailhead 25
  26. Parking at Fairfax Drive mile 0.7 directions to trailhead 26
  27. Parking at Fairfax Drive mile 0.7 directions to trailhead 27
  28. Parking at Fairfax Drive mile 0.7 directions to trailhead 28
  29. Parking at North Courthouse Road mile 0.8 directions to trailhead 29
  30. Parking at North Wayne Street mile 1.1 directions to trailhead 30
  31. Parking at North Wayne Street mile 1.1 directions to trailhead 31
  32. Parking at North Wayne Street mile 1.2 directions to trailhead 32
  33. Parking at Wainwright Road mile 1.3 directions to trailhead 33
  34. Parking at North Pershing Drive mile 1.3 directions to trailhead 34
  35. Parking at North Pershing Drive mile 1.3 directions to trailhead 35
  36. Parking at North Wayne Street mile 1.3 directions to trailhead 36
  37. Parking at North Wayne Street mile 1.5 directions to trailhead 37
  38. Parking at North Wayne Street mile 1.5 directions to trailhead 38
  39. Parking at North Fillmore Street mile 1.9 directions to trailhead 39
  40. Parking at North Highland Street mile 2.1 directions to trailhead 40
  41. Parking at South Garfield Street mile 2.1 directions to trailhead 41
  42. Parking at South Hudson Street mile 2.2 directions to trailhead 42
  43. Parking at Arlington Boulevard Service Road mile 2.3 directions to trailhead 43
  44. Parking at North Jackson Street mile 2.5 directions to trailhead 44
  45. Parking at North Jackson Street mile 2.5 directions to trailhead 45
  46. Parking at Arlington Boulevard Service Road mile 2.5 directions to trailhead 46
  47. Parking at South Glebe Road mile 2.7 directions to trailhead 47
  48. Parking at South Old Glebe Road mile 2.7 directions to trailhead 48
  49. Parking at North Glebe Road mile 2.8 directions to trailhead 49
  50. Parking at North Glebe Road mile 2.8 directions to trailhead 50
  51. Parking at 1st Street North mile 3.6 directions to trailhead 51
  52. Parking at 1st Street North mile 3.7 directions to trailhead 52
Arlington Boulevard Trail (opens in a new tab)
Photo: alongthepike · CC BY-SA 4.0 · Mapillary

About this trail

The Arlington Boulevard Trail is a set of discontinuous trails and on-road bike routes along both sides of Arlington Boulevard (U.S. Route 50) in Northern Virginia. Wikipedia gives its length as 11 miles, from North Rhodes Street in Arlington County to Fairview Park Drive in Falls Church, and notes a proposal to extend it to Pickets Road in Fairfax. The Washington Area Bicyclist Association describes the corridor as a patchwork of sidewalks and narrow shared-use paths, with significant gaps and deteriorated facilities.

The first section opened on November 18, 1974, alongside preferential bus lanes: about 1.7 miles of paved trail between the Four Mile Run Trail and North Pershing Drive, Arlington's second trail. It was extended about 2.3 miles west in 1976, and in May 1979 east from North Pershing Drive around Fort Myer to Arlington Memorial Bridge. In 2014 a new segment was built from North Pershing Drive to Rolfe Street, and the older path there was widened and extended under 10th Street, closing a gap. In January 2020 about 500 feet of trail between Rolfe and Rhodes streets was widened from 5 to 10 feet as part of street work for a new apartment building. The section mapped here runs about 2.8 miles through Arlington, from west of Glebe Road past North Pershing Drive and Courthouse Road to the North Rhodes Street area.

A county study identified the south side between South George Mason Drive and South Glebe Road, beside the National Guard Bureau and the National Foreign Affairs Training Center, as one of the most constrained sections; there the trail is a 5-foot sidewalk with no buffer from traffic. In March 2023 the bicyclist association backed Arlington County's request for federal design funding there; the county's draft concepts call for a 10-foot multi-use trail with improved crossings.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dalecarlia Rsvr, 7 km from the trail's middle, 27 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434655687684888679685647
Low °F262734445463686659473630
Precipitation, in3.33.24.23.54.44.25.14.44.54.43.33.8
Snow, in2.91.40.7000000000.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Mt. Vernon sheet (1:125,000); the 1956 Washington West sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Arlington Boulevard — Wikipedia · organization · checked Oct 14, 2026
    Supports: set of discontinuous trails and on-road bike routes on both sides of the boulevard, 11 miles, North Rhodes Street to Fairview Park Drive, proposed extension to Pickets Road, opened November 18, 1974 with preferential bus lanes, 1.7 miles between the Four Mile Run Trail and North Pershing Drive, Arlington's second trail, 2.3-mile western extension in 1976, May 1979 extension around Fort Myer to Arlington Memorial Bridge, 2014 Pershing-to-Rolfe segment and 10th Street gap closure, January 2020 widening between Rolfe and Rhodes streets
  3. Letter: Arlington Boulevard Trail Funding — Washington Area Bicyclist Association (March 8, 2023) · organization · checked Oct 14, 2026
    Supports: Route 50 corridor, patchwork of sidewalks and narrow shared-use paths with gaps and deteriorated facilities, South George Mason Drive to South Glebe Road segment beside the National Guard Bureau and NFATC, narrow 5-foot sidewalk with no buffer, county draft concepts for a 10-foot multi-use trail with improved crossings, support for the county's Congressionally Directed Spending design request, county study naming it one of the most critical and constrained sections
  4. Arlington Boulevard Trail — OpenStreetMap · web · checked Oct 14, 2026
    Supports: mapped section of about 2.8 miles through Arlington from west of Glebe Road to the North Rhodes Street area

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.