States › Virginia

Custis Trail

Greenway in Virginia · OpenStreetMap relation

Runs through Arlington · Arlington County

Conditions now

Loading the weather near Arlington…

Forecast by the National Weather Service for Arlington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Custis Trail is a hilly 4.5 miles (7.2 km)-long shared use path in Arlington County, Virginia. The asphalt-paved trail travels along Interstate 66 (I-66) between Rosslyn and the Washington and Old Dominion Railroad Trail at Bon Air Park.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
4.3 mi 7.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Langston Boulevard mile 0.2 directions to trailhead 1
  2. Parking at Langston Boulevard mile 0.2 directions to trailhead 2
  3. Parking at 21st Street North mile 0.3 directions to trailhead 3
  4. Parking at North Pierce Street mile 0.3 directions to trailhead 4
  5. Parking at 21st Street North mile 0.4 directions to trailhead 5
  6. Parking at 21st Street North mile 0.4 directions to trailhead 6
  7. Parking at Langston Boulevard mile 0.4 directions to trailhead 7
  8. Parking at 21st Street North mile 0.4 directions to trailhead 8
  9. Parking at 21st Street North mile 0.4 directions to trailhead 9
  10. Parking at 21st Road North mile 0.4 directions to trailhead 10
  11. Parking at 21st Road North mile 0.4 directions to trailhead 11
  12. Parking at North Scott Street mile 0.5 directions to trailhead 12
  13. Parking at North Rolfe Street mile 0.5 directions to trailhead 13
  14. Parking at 21st Street North mile 0.5 directions to trailhead 14
  15. Parking at 21st Street North mile 0.5 directions to trailhead 15
  16. Parking at Langston Boulevard mile 0.7 directions to trailhead 16
  17. Parking at Langston Boulevard mile 0.8 directions to trailhead 17
  18. Parking at 21st Court North mile 0.9 directions to trailhead 18
  19. Parking at 21st Court North mile 0.9 directions to trailhead 19
  20. Parking at North Adams Street mile 1.1 directions to trailhead 20
  21. Parking at 20th Road North mile 1.2 directions to trailhead 21
  22. Parking at North Calvert Street mile 1.3 directions to trailhead 22
  23. Parking at Spout Run Parkway mile 1.3 directions to trailhead 23
  24. Parking at North Calvert Street mile 1.3 directions to trailhead 24
  25. Parking at Spout Run Parkway mile 1.4 directions to trailhead 25
  26. Parking at Spout Run Parkway mile 1.4 directions to trailhead 26
  27. Parking at Langston Boulevard mile 1.5 directions to trailhead 27
  28. Parking at North Kirkwood Road mile 1.6 directions to trailhead 28
  29. Parking at Langston Boulevard mile 1.6 directions to trailhead 29
  30. Parking at North Nelson Street mile 2.3 directions to trailhead 30
  31. Parking at 17th Street North mile 2.3 · water directions to trailhead 31
  32. Parking at Generals' Way mile 2.5 directions to trailhead 32
  33. Parking at Washington Boulevard mile 3.1 directions to trailhead 33
  34. Parking at Washington Boulevard mile 3.2 directions to trailhead 34
  35. Parking at North Frederick Street mile 3.7 directions to trailhead 35
  36. Parking at 10th Street North mile 3.7 directions to trailhead 36
  37. Parking at North Harrison Street mile 3.8 directions to trailhead 37
  38. Parking at 11th Street North mile 4 directions to trailhead 38
  39. Parking at North Kennebec Street mile 4.2 · restrooms · water directions to trailhead 39
Custis Trail 01.jpg (opens in a new tab)
Custis Trail 01.jpg · Photo: Mo Kaiwen 莫楷文 · CC BY 2.0 · Wikimedia Commons

About this trail

The Custis Trail is a hilly, asphalt-paved shared-use path of about 4.5 miles in Arlington County, Virginia, running beside Interstate 66 between Rosslyn and the Washington and Old Dominion Railroad Trail at Bon Air Park. I-66 and the trail were built on and near the former right-of-way of the Washington and Old Dominion Railroad's Rosslyn spur, which the state highway department bought in 1962; a temporary natural-surface bike trail on that right-of-way east of Spout Run was in place by 1976. The Virginia Department of Transportation built the Custis Trail, first called the I-66 Trail, from 1977 to 1982 at a cost of $2.5 million, and it opened in the summer of 1982. Its original western section to East Falls Church was later informally rebranded as part of the W&OD Trail.

At its eastern end, an extension and bridge over the George Washington Memorial Parkway opened on June 11, 1988, linking the trail to the Mount Vernon Trail. Near North Lynn Street the trail connects to the Francis Scott Key Bridge toward Georgetown, the Capital Crescent Trail and the C&O Canal towpath. From Rosslyn it follows I-66 west, crossing the highway three times, to its junction with the W&OD Trail near Four Mile Run. All five at-grade street crossings are in the section beside Lee Highway, renamed Langston Boulevard in Arlington in 2021, in and near Rosslyn, where the trail was widened from 10 to 16 feet in 2018 and 2019.

Arlington County's parks department repaved about 2 miles of the trail between North Lincoln Street and North Oak Street in spring 2026. The county has also applied to the Northern Virginia Transportation Authority for a $29.9 million project to rebuild 4.24 miles of the trail, from the W&OD junction to North Oak Street, to a consistent 12-foot width with simpler intersections and new lighting; $2.4 million in authority funds has been approved and completion is expected in fiscal 2036.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dalecarlia Rsvr, 5.4 km from the trail's middle, 29 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434655687684888679685647
Low °F262734445463686659473630
Precipitation, in3.33.24.23.54.44.25.14.44.54.43.33.8
Snow, in2.91.40.7000000000.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Mt. Vernon sheet (1:125,000); the 1956 Washington West sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1161687, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Custis Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q5196329, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Custis Trail Widening and Modernization (ARL-036) — Northern Virginia Transportation Authority · organization · checked Oct 14, 2026
    Supports: Arlington County application submitted July 30, 2025; reconstruct 4.24 miles to a consistent 12-foot width; simplify intersections, remove pinch points, upgrade lighting; western terminus at W&OD Trail to North Oak Street near Rosslyn; total cost $29.9 million; $2.4 million NVTA funds approved; expected completion FY2036
  5. Custis Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: hilly 4.5-mile asphalt shared-use path along I-66 between Rosslyn and the W&OD Trail at Bon Air Park; built on and near W&OD Rosslyn spur right-of-way bought in 1962; Spout Run Bike Trail in place by 1976; VDOT built the $2.5 million trail 1977-1982 (originally I-66 Trail); opened summer 1982; section to East Falls Church rebranded as W&OD Trail; June 11, 1988 extension and bridge to Mount Vernon Trail; Key Bridge connection to Georgetown, Capital Crescent Trail and C&O Canal towpath; crosses I-66 three times; five at-grade crossings beside Lee Highway; widened from 10 to 16 feet in 2018-19
  6. U.S. Route 29 in Virginia — Wikipedia · organization · checked Oct 14, 2026
    Supports: Lee Highway renamed Langston Boulevard in Arlington in July 2021
  7. Parts of Custis Trail close for repaving starting this week — ARLnow (March 30, 2026) · web · checked Oct 14, 2026
    Supports: roughly two-mile stretch closed in segments March 30-April 15, 2026 for milling and repaving between N Oak St and N Lincoln St; part of the Department of Parks and Recreation's annual trail and bridge maintenance program; Langston Blvd name

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.