States › Indiana

B-Line Trail

Rail-trail in Indiana · OpenStreetMap relation

Runs through Bloomington · Monroe County

Conditions now

Loading the weather near Bloomington…

Forecast by the National Weather Service for Bloomington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The B-Line Trail is a multi-use trail in Bloomington, Indiana, connecting the city's downtown to outlying neighborhoods. Multiple plazas are located along the trail, as well as numerous works of public art, such as murals and sculptures. The trail's route includes Switchyard Park, a linear park constructed on the site of the former McDoel Switchyard. The trail connects with the Bloomington Rail Trail at Country Club Drive, which in turn connects to the Clear Creek Trail.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Grimes Lane mile 1.1 · water directions to trailhead 1
  2. Parking at West Grimes Lane mile 1.2 · water directions to trailhead 2
  3. Parking at South Morton Street mile 1.2 · water directions to trailhead 3
  4. Parking at West Patterson Drive mile 1.2 · water directions to trailhead 4
  5. Kroger Seminary Square Parking Lot mile 1.7 directions to Kroger Seminary Square Parking Lot
  6. Parking at West 2nd Street mile 1.8 directions to trailhead 6
  7. Parking at South College Avenue mile 1.8 directions to trailhead 7
  8. Parking at West 2nd Street mile 1.8 directions to trailhead 8
  9. Parking at South College Avenue mile 1.9 directions to trailhead 9
  10. Parking at South Morton Street mile 1.9 directions to trailhead 10
  11. Parking at South Morton Street mile 1.9 directions to trailhead 11
  12. Parking at West 3rd Street mile 2 · water directions to trailhead 12
  13. Parking at West 4th Street mile 2 · water directions to trailhead 13
  14. Parking at West 3rd Street mile 2 · water directions to trailhead 14
  15. Parking at West Kirkwood Avenue mile 2.1 · water directions to trailhead 15
  16. Parking at North Morton Street mile 2.2 · water directions to trailhead 16
  17. Parking at West 6th Street mile 2.2 directions to trailhead 17
  18. Parking at North Madison Street mile 2.2 directions to trailhead 18
  19. Parking at North Madison Street mile 2.2 directions to trailhead 19
  20. Parking at West 6th Street mile 2.2 directions to trailhead 20
  21. Showers South Lot mile 2.3 · water directions to Showers South Lot
  22. Parking at North Rogers Street mile 2.3 directions to trailhead 22
  23. Parking at West 8th Street mile 2.4 directions to trailhead 23
  24. Parking at North Rogers Street mile 2.4 directions to trailhead 24
  25. Parking at West 8th Street mile 2.4 · water directions to trailhead 25
  26. Parking at West 10th Street mile 2.5 directions to trailhead 26
  27. Parking at North Rogers Street mile 2.5 directions to trailhead 27
  28. Parking at North Rogers Street mile 2.5 directions to trailhead 28
  29. Parking at North Rogers Street mile 2.5 directions to trailhead 29

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

2022_07_30_b-line-barbies_01 (opens in a new tab)
2022_07_30_b-line-barbies_01 · Photo: dsearls · CC BY · Flickr

About this trail

The B-Line Trail is a paved rail-trail through downtown Bloomington, Indiana, run by the City of Bloomington Parks and Recreation Department. It follows the route of the Monon Railroad through the city; CSX abandoned the line in 1994 and the city bought it in 2004. Because of extensive soil contamination along the corridor, the Environmental Protection Agency has given Bloomington several grants for cleanup. Plazas and public art, including murals and sculptures, line the trail.

The trail runs south from Adams Street to Country Club Drive. About a mile of it passes through Switchyard Park, a linear park built on the site of the former McDoel Switchyard. At Country Club Drive it meets the Bloomington Rail Trail, a 2-mile gravel trail that continues to the Clear Creek Trail at Church Lane. At the north end, the city's B-Line Connection Project is joining the Adams Street terminus to the multi-use path on the 17th Street overpass of I-69: a path along West Fountain Drive and North Crescent Road was finished in 2024, and a 0.1-mile link to the Adams Street trailhead opened in December 2025, bringing the B-Line to 3.2 miles.

The surface is asphalt, and the trail is flat except for the steep approach over the Grimes Lane pedestrian bridge. LED lights are on from dusk to dawn, and city trails are open from 5 a.m. to 11 p.m. Pedal-assist electric bikes are allowed at up to 20 mph; other motor vehicles, apart from mobility devices, are not. Parking is on Fairview Street at Rev. Ernest D. Butler Park and at metered spaces along the cross streets. WonderLab Plaza, where the trail crosses West Fourth Street, has picnic tables, a drinking fountain and a statue of Star Trek's Captain Kathryn Janeway; a seasonal fountain stands at the police substation in Switchyard Park, just south of Grimes Lane.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 99% of this route as a trail on former railroad right-of-way.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bloomington Indiana Univ, 2.3 km from the trail's middle, 29 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374252647482858478665341
Low °F212332425362656456443426
Precipitation, in3.833.75.25.45.44.63.43.83.83.93.5
Snow, in7.14.21.30.1000000.10.24.5
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Bloomington sheet (1:48,000); the 1956 Bloomington sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In September and October 2026 commenters said two B-Line street crossings are hard to see across: Morton and Dodds by Hopscotch Coffee, and First Street, where one cited an electrical box. r/bloomington, Sep 2026
  • One walker said in October 2026 that a quick call-out before passing, and a little extra room, helps on the B-Line. r/bloomington, Sep 2026
2 Reddit threads about this trail, Sep 2026 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2233628, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “B-Line Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q66816471, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. B-Line Trail — City of Bloomington, Indiana · government source · checked Oct 15, 2026
    Supports: Adams Street to Country Club Drive; connection to the Bloomington Rail Trail; asphalt; flat except Grimes Lane bridge approach; LED lights dusk to dawn; pedal-assist e-bikes; parking at Rev. Ernest D. Butler Park and metered street parking; WonderLab Plaza amenities and Janeway statue; Switchyard Park fountain; a mile through Switchyard Park; Bloomington Rail Trail 2 miles gravel to Clear Creek Trail at Church Lane
  5. Trails in Bloomington — City of Bloomington, Indiana · government source · checked Oct 15, 2026
    Supports: trail hours 5 a.m. to 11 p.m.; electric bikes up to 20 mph
  6. Reconstructed Rail Trail Crossing Opens; B-Line Trail North Extension Nears Completion — City of Bloomington (December 19, 2025) · government source · checked Oct 15, 2026
    Supports: B-Line Connection Project to the 17th Street I-69 overpass path; Fountain Drive and Crescent Road path completed 2024; 0.1-mile link to the Adams Street trailhead open; total 3.2 miles
  7. B-Line Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: Monon Railroad route; abandoned by CSX in 1994; bought by the city in 2004; EPA cleanup grants; plazas and public art; Switchyard Park on the former McDoel Switchyard

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.