States › Indiana

Clear Creek Trail

Greenway in Indiana · OpenStreetMap relation

Runs through Bloomington · Monroe County

Conditions now

Loading the weather near Bloomington…

Forecast by the National Weather Service for Bloomington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.4 mi 3.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West That Road mile 0.6 · restrooms directions to trailhead 1
  2. Parking at West Tapp Road mile 2.3 directions to trailhead 2
Woolery Stone Company, beside the trail (opens in a new tab)
Woolery Stone Company, beside the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Clear Creek Trail is a paved multi-use trail on the south side of Bloomington, Indiana, run by the City of Bloomington Parks and Recreation as a 20.8-acre "linear park". The city acquired the corridor in 1997 through 12 separate purchases with City of Bloomington Utilities. Phase I, between Tapp Road and That Road, opened on May 23, 2001, and Phase II, from That Road to Church Lane, opened on October 30, 2003.

The city gives the trail's length as 2.4 miles, from Country Club Drive south past Tapp Road to Church Lane, where it connects with the Bloomington Rail Trail. Near the Church Lane trailhead the trail crosses Clear Creek on a 150-foot wrought-iron bridge that spanned Big Pine Creek in Warren County from 1887; it was restored and set in place on August 1, 2003, and the Bloomington Rail Trail joins just north of it. OpenStreetMap shows trailhead parking near West That Road, with restrooms, and at West Tapp Road.

The whole Clear Creek Trail is wheelchair accessible; the connecting Bloomington Rail Trail is not. The trail is open from 5 a.m. to 11 p.m. daily. Electric bicycles are allowed when operated at no more than 20 mph, and other motor vehicles are prohibited except mobility aids. The Monroe County Highway Department's Fullerton Pike Phase 3 project, which began construction on April 9, 2024, put a paved detour on the trail about half a mile south of Rockport Road and half a mile north of West That Road. The city's page, last updated in July 2024, expected the road project to finish in August 2025 and said the detour would remain afterward as a permanent trail access.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 73% of this route as a trail on former railroad right-of-way.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bloomington Monroe County Airport, 5.6 km from the trail's middle, 50 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394354667482858478675342
Low °F222533435362646255443427
Precipitation, in3.42.73.84.94.55.14.93.33.63.73.73.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Bloomington sheet (1:48,000); the 1956 Clear Creek sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1178491, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Clear Creek Trail | City of Bloomington, Indiana · government source · checked Oct 15, 2026
    Supports: manager, linear park, 20.8 acres, 1997 acquisition, phase opening dates, 2.4-mile length and endpoints, Bloomington Rail Trail connection, 1887 bridge history, accessibility, hours, e-bike rule, Fullerton Pike detour and schedule
  3. Clear Creek Trail, relation 1178491 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trailhead parking near West That Road and West Tapp Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.