Belleville Bikeway
Greenway in Illinois · OpenStreetMap relation
Runs through Belleville · St. Clair County
Conditions now
Loading the weather near Belleville…
Forecast by the National Weather Service for Belleville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Saint Clair County.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bellevue Park Drive mile 0 directions to trailhead 1
- Parking at West Main Street mile 0.6 directions to trailhead 2
- Parking at West Main Street mile 0.6 directions to trailhead 3
- Parking at West Main Street mile 0.6 directions to trailhead 4
- Parking at South 44th Street mile 1.7 · restrooms · water directions to trailhead 5
- Parking at West Monroe Street mile 3.9 directions to trailhead 6
- Parking at West Monroe Street mile 3.9 directions to trailhead 7
- Parking at West Adams Street mile 3.9 directions to trailhead 8
- Parking at North 6th Street mile 4 directions to trailhead 9
- Parking at North 3rd Street mile 4.2 directions to trailhead 10
- Parking at North 3rd Street mile 4.3 · restrooms · water directions to trailhead 11
- Parking at Pleasant Hill Drive mile 4.4 · restrooms · water directions to trailhead 12
- Parking at North 3rd Street mile 4.4 · restrooms · water directions to trailhead 13
- Parking at North 3rd Street mile 4.4 · water directions to trailhead 14
- Parking at North Douglas Avenue mile 5 directions to trailhead 15
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Belleville Bikeway is a bicycle route in Belleville, Illinois, mapped in OpenStreetMap as a signed local route (ref BB) that joins two city trails, the West Belleville Bikeway and the East Belleville Bikeway, with street links between them. Belleville's 2025 Bicycle and Pedestrian Master Plan, prepared for the city by Oates Associates with HeartLands Conservancy and funded in part by the Metro East Park and Recreation District, credits the City of Belleville with building the East Belleville Bikeway and lists the West Belleville Bikeway among the city's trails. About 0.6 mile of the western trail is mapped on an abandoned rail line; the rest is not a rail-trail.
The plan describes the West Belleville Bikeway as more than 1.5 miles long, connecting Bellevue Park near Memorial Hospital to Citizens Park. The East Belleville Bikeway, about 2 miles, runs south from its junction with the MetroBikeLink Trail at the Richland Creek Trail and links eight city parks. Between the two, the mapped route follows city streets, including Centreville Avenue and North 2nd Street, for a total of about 3.8 miles. The MetroBikeLink Trail, the St. Clair County Transit District's trail of more than 14.5 miles, runs along the city's northern edge.
OpenStreetMap shows both trails surfaced in asphalt, with a wooden bridge on the East Belleville Bikeway. The master plan names a Citizens Park to East Belleville Bikeway corridor among its priority projects, to connect the west-side parks and trails to downtown, and reports that an extension of the Signal Hill Trail along Foley Drive to West Main Street was under design, part of an effort to connect that trail to the West Belleville Bikeway.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Belleville Siu Rsch, 12.4 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 49 59 71 79 87 90 89 83 73 58 46 Low °F 24 28 36 46 56 64 68 65 57 47 37 28 Precipitation, in 2.6 2.2 3.4 4.9 5 4.6 4 3.9 3.4 3.1 3.6 2.6 Snow, in 3.4 3.3 1 0 0 0 0 0 0 0 0.6 2.9 - On the National Register
- Town of West Belleville Historic District, Belleville · historic district, listed 2014
- Old maps
USGS topographic maps of the trail's middle go back to the 1907 Belleville sheet (1:62,500); the 1954 O'Fallon sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Metro Bike Link Trail within 0.2 mi · 19.0 mi, paved
- Richland Creek Bikeway within 0.2 mi · 1.9 mi, paved
- Orchard Loop Trail 1.8 mi away · 4.0 mi, paved
- St Ellen Trail 2.5 mi away · 2.8 mi, paved
- Metro-East Levee Trail 4.2 mi away · 7.6 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6830114, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Belleville Bicycle and Pedestrian Master Plan (2025) — City of Belleville, hosted by Metro East Park and Recreation District · organization · checked Oct 15, 2026 Supports: plan authorship and MEPRD funding; East Belleville Bikeway built by the city, 2 miles, from the MetroBikeLink Trail at the Richland Creek Trail, eight parks; West Belleville Bikeway over 1.5 miles, Bellevue Park near Memorial Hospital to Citizens Park; MetroBikeLink over 14.5 miles along the northern edge; Citizens Park to East Belleville Bikeway priority corridor; Signal Hill Trail extension along Foley Drive to W. Main Street under design
- MetroBikeLink System — St. Clair County Transit District · organization · checked Oct 15, 2026 Supports: MetroBikeLink as the transit district's trail system in Belleville
- Belleville Bikeway, relation 6830114 — OpenStreetMap · web · checked Oct 15, 2026 Supports: signed local route ref BB combining West and East Belleville Bikeway and street links (Centreville Avenue, North 2nd Street), mapped length, abandoned-railway segments, asphalt surface, wooden bridge
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.