States › Illinois

Orchard Loop Trail

Greenway in Illinois

Runs through Belleville · St. Clair County

Conditions now

Loading the weather near Belleville…

Forecast by the National Weather Service for Belleville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.0 mi 6.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mascoutah Avenue mile 0.2 directions to trailhead 1
  2. Parking at Mascoutah Avenue mile 0.3 directions to trailhead 2
  3. Parking at Amann Drive mile 1.4 directions to trailhead 3
  4. Parking mile 3 directions to trailhead 4
Belleville, along the trail (opens in a new tab)
Belleville, along the trail · Photo: artistmac · CC BY-SA 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Orchard Loop Trail is a paved trail on the southeast side of Belleville, Illinois, built by the St. Clair County Transit District as an extension of its MetroBikeLink trail system. The district planned it as an eight-mile loop connecting seven subdivisions, a middle school, the MetroBikeLink and Eckert's Orchard, working with the Metro East Park and Recreation District and Eckert's Orchards. Eckert's donated a permanent easement for 2.1 miles of the trail, and Cathedral Catholic Church, PMC Hayes Mechanical and Belle Valley Middle School also donated easements.

The first phase, a 3-mile, 10-foot-wide asphalt segment from the MetroBikeLink at the Fox Valley Subdivision to Eckert's Orchard, was slated to open in late 2018. It parallels farm roads through the Eckert orchard land, uses existing Belle Valley School trails, and crosses Illinois Route 158/177 at a push-button flashing beacon. A second phase was to carry the trail over Green Mount Road on a bridge toward The Orchards subdivision, and a third to close the loop back to the MetroBikeLink through the Plum Hill and Brookhill subdivisions. TrailLink lists the trail at 4 miles, from the MetroBikeLink at Fox Valley Lane to Golf Course Drive at the Orchards pool, and the record here maps about 4 miles. No source found confirms that the third phase has been built.

Trail parking is in the northwest corner of the Eckert's lot at 951 South Green Mount Road, and TrailLink lists more at the Orchards Golf Course, 1499 Golf Course Drive. The junction with the MetroBikeLink lies about halfway between the Belleville and College MetroLink stations.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Belleville Siu Rsch, 9 km from the trail's middle, 17 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434959717987908983735846
Low °F242836465664686557473728
Precipitation, in2.62.23.44.954.643.93.43.13.62.6
Snow, in3.43.3100000000.62.9
Old maps

USGS topographic maps of the trail's middle go back to the 1912 New Athens sheet (1:62,500); the 1954 Freeburg sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Connecting St. Clair County, One Trail at a Time — St. Clair County Transit District · organization · checked Oct 15, 2026
    Supports: eight-mile loop in southeast Belleville; seven subdivisions, a middle school, MetroBikeLink and Eckert farm; partners SCCTD, MERPD and Eckert's; 2.1-mile Eckert's easement and other donated easements; three phases (Fox Valley to Eckert's; bridge over Green Mount Road toward The Orchard subdivision; loop completion via Plum Hill and Brook Hill)
  3. SCCTD to open Orchard Loop Trail — St. Clair County Transit District · organization · checked Oct 15, 2026
    Supports: first phase 3 miles, slated to open late 2018; 10-foot asphalt; parallels farm roads through Eckert lands; uses Belle Valley School trails; Route 158/177 crossing with flashing beacon; Fox Valley Subdivision connection; parking in northwest corner of Eckert's lot
  4. Saint Clair County Orchard Loop Trail — TrailLink · web · checked Oct 15, 2026
    Supports: 4 miles; endpoints MetroBikeLink at Fox Valley Lane and Golf Course Dr. at the Orchards pool; Eckert's lot at 951 S Green Mount Road; Orchards Golf Course parking at 1499 Golf Course Drive; junction halfway between the Belleville and College MetroLink stations

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.