States › Georgia

Beltline Access Line

Greenway in Georgia

Runs through Atlanta · Fulton County

Conditions now

Loading the weather near Atlanta…

Forecast by the National Weather Service for Atlanta · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.6 mi 2.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lake Avenue Northeast mile 0.9 · restrooms · water directions to trailhead 1
  2. Parking at John Wesley Dobbs Avenue Northeast mile 1 directions to trailhead 2
  3. Parking at Willoughby Way Northeast mile 1.4 · restrooms · water directions to trailhead 3
  4. Parking at Bernina Avenue Northeast mile 1.5 directions to trailhead 4
  5. Parking at North Highland Avenue Northeast mile 1.5 directions to trailhead 5
  6. Parking at Elizabeth Street Northeast mile 1.5 directions to trailhead 6
  7. Parking at Elizabeth Street Northeast mile 1.5 directions to trailhead 7
  8. Parking at Monroe Drive Northeast mile 4.1 directions to trailhead 8
Gathering space beneath Freedom Parkway along the Atlanta BeltLine Eastside Trail (opens in a new tab)
Gathering space beneath Freedom Parkway along the Atlanta BeltLine Eastside Trail · Photo: Marc Merlin · CC BY-SA 4.0 · Wikimedia Commons

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 8% of this route as an abandoned line with the track removed and 31% as an out-of-service rail line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Peachtree Airport, 14.5 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664738086898883736254
Low °F333642495866706963514136
Precipitation, in4.64.54.73.93.84.74.74.54.13.44.24.4
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Decatur sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.