Beltline Access Line
Greenway in Georgia
Runs through Atlanta · Fulton County
Conditions now
Loading the weather near Atlanta…
Forecast by the National Weather Service for Atlanta · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Lake Avenue Northeast mile 0.9 · restrooms · water directions to trailhead 1
- Parking at John Wesley Dobbs Avenue Northeast mile 1 directions to trailhead 2
- Parking at Willoughby Way Northeast mile 1.4 · restrooms · water directions to trailhead 3
- Parking at Bernina Avenue Northeast mile 1.5 directions to trailhead 4
- Parking at North Highland Avenue Northeast mile 1.5 directions to trailhead 5
- Parking at Elizabeth Street Northeast mile 1.5 directions to trailhead 6
- Parking at Elizabeth Street Northeast mile 1.5 directions to trailhead 7
- Parking at Monroe Drive Northeast mile 4.1 directions to trailhead 8
(opens in a new tab) History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 8% of this route as an abandoned line with the track removed and 31% as an out-of-service rail line.
- Shade
22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 14.5 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - On the National Register
- Capitol View Historic District, Atlanta · historic district, listed 2016
- Capitol View Manor Historic District, Atlanta · historic district, listed 2013
- Oakland City Historic District, Atlanta · historic district, listed 2003 · nomination file for Oakland City Historic District
- West End Historic District, Atlanta · historic district, listed 1999 · nomination file for West End Historic District
- Reynoldstown Historic District, Atlanta · historic district, listed 2003 · nomination file for Reynoldstown Historic District
- Martin Luther King, Jr. Historic District (Boundary Increase), Atlanta · historic district, listed 2001 · nomination file for Martin Luther King, Jr. Historic District (Boundary Increase)
- Inman Park Historic District Boundary Increase, Atlanta · historic district, listed 2001 · nomination file for Inman Park Historic District Boundary Increase
- Ansley Park Historic District, Atlanta · historic district, listed 1979 · nomination file for Ansley Park Historic District
- Ansley Park Historic District (Boundary Increase, Decrease and Additional Documentation), Atlanta · historic district, listed 2015
- Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Decatur sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Atlanta Beltline Trail within 0.2 mi · 19.3 mi, paved
- Lionel Hampton Trail within 0.2 mi · 2.0 mi, paved
- Westside Beltline Connector within 0.2 mi · 1.7 mi, paved
- West End Trail within 0.2 mi · 1.6 mi, paved
- Stone Mountain Trail within 0.2 mi · 15.0 mi, paved
- Proctor Creek Trail 0.3 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.