States › Georgia

Proctor Creek Trail

Greenway in Georgia · OpenStreetMap relation

Runs through Atlanta · Fulton County

Conditions now

Loading the weather near Atlanta…

Forecast by the National Weather Service for Atlanta · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Johnson Road mile 1.8 directions to trailhead 1
Proctor Creek Greenway, Rockdale GA (opens in a new tab)
Proctor Creek Greenway, Rockdale GA · Photo: John Phelan · CC BY 4.0 · Wikimedia Commons

About this trail

This record, named Proctor Creek Trail in OpenStreetMap's route relation, is the Proctor Creek Greenway, a multiuse trail along Proctor Creek on the west side of Atlanta, Georgia. The PATH Foundation, which completed the greenway's master plan in April 2017, gives its length as 2.44 miles. The City of Atlanta broke ground on August 17, 2017, with $3 million in TSPLOST transportation sales-tax revenue for the first segment and further funding from the Mayor's Office of Resilience, the Department of Watershed Management, the PATH Foundation and Atlanta BeltLine, Inc. Mayor Keisha Lance Bottoms opened the first phase at a ribbon cutting on May 7, 2018.

The trail starts beside the Bankhead MARTA station and follows the creek north and west past the planned Westside Quarry Park to the Grove Park and West Highlands neighborhoods, where it meets the existing West Highlands Trail. PATH lists access and parking at the Bankhead MARTA station, Westside Park and Sandford Drive, and connections to Westside Park, Grove Park, West Highlands and the Westside BeltLine Connector. The master plan calls for a seven-mile greenway in six segments, from Maddox Park and the Atlanta BeltLine's Westside Trail to the Chattahoochee River, with 50 acres of linear park and 400 acres of greenspace; the 2017 estimate for the full route was $11.5 million.

OpenStreetMap maps the route as a concrete path with several bridges, about 2.5 miles long. PATH describes a few hills but calls the trail generally suitable for all riders and walkers.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Fulton County Airport, 7.2 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545866748187908984746456
Low °F343743505867706963514136
Precipitation, in4.24.34.53.63.63.8543.43.63.84.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Bolton sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12563871, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Proctor Creek Greenway — PATH Foundation · organization · checked Oct 16, 2026
    Supports: name Proctor Creek Greenway; 2.44 miles; Bankhead MARTA station to the Grove Park and West Highlands neighborhoods; a few hills, generally suitable for all riders and walkers; access and parking at Bankhead MARTA Station, Westside Park and Sandford Drive; connections to Westside Park, Grove Park, West Highlands and the Westside BeltLine Connector
  3. Ground broken on Proctor Creek Greenway — Rough Draft Atlanta (August 18, 2017) · web · checked Oct 16, 2026
    Supports: groundbreaking August 17, 2017; seven miles from Maddox Park to the Chattahoochee River; PATH Foundation completed the master plan in April; six segments; $11.5 million full cost; $3 million TSPLOST for the first segment; Mayor's Office of Resilience, Department of Watershed Management, PATH Foundation and Atlanta BeltLine, Inc. funding; 50 acres of linear park and 400 acres of greenspace; connection to the BeltLine Westside Trail
  4. Ribbon cutting held for first three miles of Proctor Creek Greenway — Rough Draft Atlanta (May 8, 2018) · web · checked Oct 16, 2026
    Supports: ribbon cutting May 7, 2018 with Mayor Keisha Lance Bottoms; first phase from the Bankhead MARTA Station alongside Proctor Creek to the existing West Highlands Trail; planned seven miles from Maddox Park and the BeltLine Westside Trail to the Chattahoochee River
  5. Proctor Creek Greenway opens, an amenity with a little anxiety — SaportaReport (May 8, 2018) · web · checked Oct 16, 2026
    Supports: trail starts beside the Bankhead MARTA station; runs past the planned Westside Quarry Park; Grove Park neighborhood
  6. Proctor Creek Trail (relation 12563871) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: relation name Proctor Creek Trail; member ways named Proctor Creek Greenway; concrete cycleway with bridges; length of about 2.5 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.