States › Iowa

Bill Riley Trail

Rail-trail in Iowa · OpenStreetMap relation

Runs through Des Moines · Polk County

Conditions now

Loading the weather near Des Moines…

Forecast by the National Weather Service for Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.5 mi 5.6 km1
On former railbed
1.1 mi 32%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 45th Street mile 0 directions to trailhead 1
Snow Day in Des Moines (opens in a new tab)
Snow Day in Des Moines · Photo: Phil Roeder · CC BY · Flickr

About this trail

The Bill Riley Trail is a paved multi-use trail in Des Moines, Iowa, managed by the city's Parks and Recreation Department. Opened in 1972, it was the first trail of its kind in Des Moines. In 2003 the city called it the oldest and one of the most heavily used trails in its system, then 1.7 miles from Ashworth Park to Water Works Park, where it met the Great Western Trail, and noted that portions are part of the American Discovery Trail. TrailLink classes it as a greenway rather than a rail-trail.

The city now measures the trail at 3.47 miles, from the Ashworth Pool parking lot in Ashworth Park to its junction with the Meredith Trail on the south side of Gray's Lake Park. From the Ashworth Pool trailhead at 4500 Grand Avenue the trail follows Walnut Creek, meets the Walnut Creek Trail at a T-intersection, and runs through Water Works Park, where it passes the Iowa Interstate Railroad bridge on the bank of Walnut Creek. A trestle bridge carries it across the Raccoon River before it reaches Gray's Lake. The Ashworth Park trailhead has picnic facilities and a playground but no restrooms.

The surface is asphalt. In 2020 the city ordered a $425,000 repair of the trail at the Iowa Interstate Railroad bridge, including bank grading, steel sheet pile and concrete pavement. In March 2024 the City Council ordered a resurfacing of the full trail and of 0.87 miles of the Walnut Creek Trail, estimated at $970,000 and paid with American Rescue Plan Act funds, in four phases so that most of the trail could stay open; the city said no detours were possible. The first phase reopened in July 2024, and the work was expected to finish in early October 2024. City trail counters logged an estimated 236,051 trips on the Bill Riley Trail in 2023.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Union Pacific / Chicago & North Western line, built 1870–1887, abandoned 1975–2002 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).

Shade

31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 3.9 km from the trail's middle, 48 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SW sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Bill Riley Trail (opens in a new tab)
  1. 360° view 1 of 4, photo by iowadatabike
  2. 360° view 2 of 4, photo by iowadatabike
  3. 360° view 3 of 4, photo by iowadatabike
  4. 360° view 4 of 4, photo by iowadatabike
360° panorama · Photo: iowadatabike · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10346915, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Council Communication 24-118: Bill Riley Trail Resurfacing from Ashworth Pool to Gray's Lake — City of Des Moines (March 18, 2024) · organization · checked Oct 15, 2026
    Supports: Park and Recreation Director; 3.47 trail miles from Ashworth Pool parking lot to the Meredith Trail on the south side of Gray's Lake Park; T-intersection with the Walnut Creek Trail; Water Works Park bridge; $970,000 ARPA-funded estimate; 0.87 miles of Walnut Creek Trail; four phases; no detours; completion early October 2024; 236,051 trips in 2023
  3. Roll Call 20-1409: Bill Riley Trail Repair at the Iowa Interstate Railroad Bridge — City of Des Moines (September 14, 2020) · organization · checked Oct 15, 2026
    Supports: $425,000 repair at the Iowa Interstate Railroad bridge in Water Works Park on the bank of Walnut Creek; bank grading, steel sheet pile, concrete pavement
  4. Council Communication 03-462: Bill Riley Trail Federal Recreational Trails Grant Application — City of Des Moines (September 22, 2003) · web · checked Oct 15, 2026
    Supports: 1.7-mile trail from Ashworth Park to Waterworks Park merging into the Great Western Trail; oldest and one of the most heavily used trails in the system; portions part of the American Discovery Trail
  5. Des Moines City Council approves resurfacing of the Bill Riley Trail in Des Moines — BIKEIOWA (March 20, 2024) · web · checked Oct 15, 2026
    Supports: opened in 1972, first of its kind in Des Moines; council approval of resurfacing
  6. Part of popular Bill Riley trail reopening in Des Moines — BIKEIOWA (July 2024) · web · checked Oct 15, 2026
    Supports: first of four phases reopening in July 2024; Des Moines Parks and Recreation
  7. Bill Riley Trail — TrailLink · web · checked Oct 15, 2026
    Supports: greenway category; asphalt; follows Walnut Creek into Ashworth Park; trestle bridge across the Raccoon River; Ashworth Memorial Pool trailhead at 4500 Grand Avenue with picnic facilities and playground, no restrooms

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.