Martin Luther King Junior Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Des Moines · Polk County
Conditions now
Loading the weather near Des Moines…
Forecast by the National Weather Service for Des Moines · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Scott Avenue mile 2.1 directions to trailhead 1
- Parking at Scott Avenue mile 2.2 directions to trailhead 2
- Parking at Scott Avenue mile 2.4 directions to trailhead 3
- Parking at Southeast 9th Street mile 2.4 directions to trailhead 4
- Parking at Scott Avenue mile 2.5 directions to trailhead 5
- Parking at Raccoon Street mile 2.5 directions to trailhead 6
- Parking at Raccoon Street mile 2.6 directions to trailhead 7
- Parking at Scott Avenue mile 2.6 directions to trailhead 8
- Parking at Raccoon Street mile 2.6 directions to trailhead 9
- Parking at Raccoon Street mile 2.7 directions to trailhead 10
- Parking at Southeast 5th Street mile 2.7 directions to trailhead 11
- Parking at Southeast 5th Street mile 2.7 directions to trailhead 12
- Parking at Scott Avenue mile 2.7 directions to trailhead 13
- Parking at Elm Street mile 2.9 directions to trailhead 14
- Parking at Southwest Water Street mile 3.1 directions to trailhead 15
- Parking at West Martin Luther King Junior Parkway mile 3.2 directions to trailhead 16
- Parking at Southwest 3rd Street mile 3.2 directions to trailhead 17
- Parking at Southwest 5th Street mile 3.3 directions to trailhead 18
- Parking at Elm Street mile 3.4 directions to trailhead 19
- Parking at Elm Street mile 3.4 directions to trailhead 20
- Parking at Southwest 7th Street mile 3.5 directions to trailhead 21
- Parking at Southwest 9th Street mile 3.6 directions to trailhead 22
- Parking at 9th Street mile 3.6 directions to trailhead 23
- Parking at 8th Street mile 3.6 directions to trailhead 24
- Parking at West Martin Luther King Junior Parkway mile 3.7 directions to trailhead 25
- Parking at Mulberry Street mile 4.1 directions to trailhead 26
- Parking at Ingersoll Avenue mile 4.6 directions to trailhead 27
- Parking at Martin Luther King Junior Parkway mile 4.6 directions to trailhead 28
- Parking at Martin Luther King Junior Parkway mile 4.7 directions to trailhead 29
- Parking at Ingersoll Avenue mile 4.7 directions to trailhead 30
- Parking at High Street mile 4.7 directions to trailhead 31
- Parking at Woodland Avenue mile 4.8 directions to trailhead 32
- Parking at High Street mile 4.8 directions to trailhead 33
- Parking at Woodland Avenue mile 4.8 directions to trailhead 34
- Parking at Crocker Street mile 5.2 directions to trailhead 35
- Parking at 19th Street mile 5.2 directions to trailhead 36
- Parking at Crocker Street mile 5.2 directions to trailhead 37
- Parking at Day Street mile 5.5 directions to trailhead 38
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Martin Luther King Jr. Trail is a paved sidepath along Martin Luther King Jr. Parkway in Des Moines, Iowa. On November 20, 2017, the Des Moines City Council approved a map prepared by the Park and Recreation Department and named the route the Martin Luther King Jr. Multi-Use Recreational Trail, which brought it under the city's ordinance for multi-use recreational trails. The trail follows the parkway, not a railroad.
TrailLink lists the named trail as 1.1 miles of asphalt. It starts where a segment of the Meredith Trail crosses the Raccoon River at the parkway and SW 16th Street, then runs east along the southern edge of downtown to SW Water Street. There, near the meeting of the Raccoon and Des Moines rivers, it rejoins the Meredith Trail and meets the John Pat Dorrian Trail into downtown. East of that junction the sidepath continues along the parkway as the Southeast Connector Trail, which TrailLink lists as 3.09 miles of concrete from SW 2nd Street to SE 30th Street. The route mapped here is about 4.5 miles. It combines the parkway path north of the Raccoon River near Ingersoll Avenue, the named trail, and the Southeast Connector path east of downtown. Parking is available at Principal Park on SW 2nd Street at the east end of the named trail, and at Gray's Lake park, off Fleur Drive south of its west end.
The Southeast Connector roadway is being extended east. A 2024 city council communication described the final 2.2-mile segment, from SE 30th Street to U.S. 65, as including a multi-use trail and a 1,515-foot bridge. That segment was planned for bidding by the Iowa Department of Transportation in early 2025, at an estimated construction cost of $59 million.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Norfolk & Southern / Chicago & North Western / BNSF line, built 1870–1882, abandoned 1975–1996 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Des Moines International Airport, 6.8 km from the trail's middle, 51 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 36 49 62 72 82 86 84 77 63 48 36 Low °F 14 18 30 41 52 62 66 64 55 43 30 20 Precipitation, in 1.1 1.3 2.2 4 5.2 5.3 3.8 4.2 3.2 2.8 1.9 1.6 Snow, in 9.4 10.2 4.4 1.2 0.2 0 0 0 0 0.5 2.7 7.9 - On the National Register
- Civic Center Historic District, Des Moines · historic district, listed 1988 · nomination file for Civic Center Historic District
- Greenwood Park Plats Historic District, Des Moines · historic district, listed 2013
- Sherman Hill Historic District (Boundary Increase and Decrease), Des Moines · historic district, listed 2012 · nomination file for Sherman Hill Historic District (Boundary Increase and Decrease)
- Sherman Hill Historic District, Des Moines · historic district, listed 1979
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SE sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Meredith Trail within 0.2 mi · 2.9 mi, paved
- John Pat Dorrian Trail within 0.2 mi · 2.6 mi, paved
- Carl Voss Trail 0.3 mi away · 4.6 mi, paved
- Kruidenier Trail 0.5 mi away · 2.0 mi, paved
- Bill Riley Trail 0.8 mi away · 3.5 mi, paved
- Central Place Levee Trail 0.9 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14509160, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Resolution approving the map and naming of the Martin Luther King Jr. Multi-Use Recreational Trail (November 20, 2017) — City of Des Moines · web · checked Oct 15, 2026 Supports: 2017 naming and map approval; Park and Recreation Department map; multi-use recreational trail ordinance
- Council Communication 24-396: IDOT agreement for the Southeast Connector, SE 30th Street to U.S. Highway 65 — City of Des Moines · web · checked Oct 15, 2026 Supports: final 2.2-mile Southeast Connector segment with multi-use trail and 1,515-foot bridge; IDOT bidding planned early 2025; $59 million estimate
- Martin Luther King Jr. Trail — TrailLink · web · checked Oct 15, 2026 Supports: 1.1 miles, asphalt; endpoints at SW 16th Street (Meredith Trail over the Raccoon River) and SW Water Street; John Pat Dorrian Trail and Southeast Connector links; parking at Principal Park and Gray's Lake
- Southeast Connector Trail — TrailLink · web · checked Oct 15, 2026 Supports: 3.09 miles, concrete, SW 2nd Street to SE 30th Street along the parkway
- Martin Luther King Junior Trail (relation 14509160) — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped extent: parkway path north of the Raccoon River near Ingersoll Avenue through the Southeast Connector section
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.