States › North Carolina

Black Creek Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Cary · Wake County

Conditions now

Loading the weather near Cary…

Forecast by the National Weather Service for Cary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.9 mi 11.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bond Park Drive mile 0 · restrooms directions to trailhead 1
  2. Parking at Bond Park Drive mile 0.1 · restrooms directions to trailhead 2
  3. Parking at Luxon Place mile 0.5 directions to trailhead 3
  4. Parking at Northwest Maynard Road mile 1.3 directions to trailhead 4
  5. Parking at High House Road mile 1.4 directions to trailhead 5
  6. Parking at Northwest Maynard Road mile 1.4 directions to trailhead 6
  7. Parking at Northwest Maynard Road mile 1.5 directions to trailhead 7
  8. Parking at Maynard Crossing Court mile 1.5 directions to trailhead 8
  9. Parking at Northwest Maynard Road mile 1.5 directions to trailhead 9
  10. Parking at Northwest Maynard Road mile 1.5 directions to trailhead 10
  11. Parking at Maynard Crossing Court mile 1.6 directions to trailhead 11
  12. Parking at Maynard Crossing Court mile 1.7 directions to trailhead 12
  13. Parking at Northwest Maynard Road mile 2.5 directions to trailhead 13
  14. Parking at Northwest Maynard Road mile 2.6 directions to trailhead 14
  15. Parking at Triangle Sage Way mile 2.9 directions to trailhead 15
  16. Parking at Triangle Sage Way mile 2.9 directions to trailhead 16
  17. Parking at Triangle Sage Way mile 2.9 directions to trailhead 17
  18. Parking at Optical Lane mile 3 directions to trailhead 18
  19. Parking at Northwest Maynard Road mile 3.1 directions to trailhead 19
  20. Parking at Northwest Maynard Road mile 3.3 · restrooms directions to trailhead 20
  21. Parking at Northwest Maynard Road mile 3.3 · restrooms directions to trailhead 21
  22. Parking at Northwest Maynard Road mile 3.4 · restrooms directions to trailhead 22
  23. Parking at West Dynasty Drive mile 4.5 directions to trailhead 23

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Black Creek Greenway, Cary, NC (opens in a new tab)
Black Creek Greenway, Cary, NC · Photo: James Willamor · CC BY-SA · Flickr

About this trail

The Black Creek Greenway is a paved greenway of about 7.1 miles in Cary, North Carolina, and one of the Town of Cary's longest greenway trails. It is not a rail-trail: it follows Black Creek from Lake Crabtree in the north to Fred G. Bond Metro Park in the south, passing North Cary Park. A segment of about 1.25 miles, from the corner of Maynard Road and High House Road through the Battery Park subdivision and across a new wooden bridge near Castalia Drive to Bond Park, was reported newly opened in January 2013; it nearly completed the greenway, then measured at 6.86 miles on the town's bike and hike map.

The northern trailhead, at 2139 Old Reedy Creek Road overlooking Lake Crabtree, has restrooms and more than 80 parking spaces. From there the greenway runs south through North Cary Park to Bond Park, where it links with the White Oak Creek Greenway, which adds more than 7 miles heading west. The greenway is open from dawn to dusk to walkers, cyclists and leashed pets.

A renovation of the greenway from West Dynasty Drive to Old Reedy Creek Road began in June 2024, together with a pedestrian bridge over Black Creek closing a sidewalk gap on Cary Parkway. The work, by Crowder Construction, is being done in three phases, each closing and detouring its own section. Phase 1, from West Dynasty Drive to Livingstone Drive, reopened on August 29, 2025, and Phase 2, from Livingstone Drive to Weston Parkway, reopened with the Cary Parkway bridge on May 1, 2026. Phase 3, from Weston Parkway to the Old Reedy Creek trailhead, closed on May 4, 2026, for clearing, drainage and grading next to Lake Crabtree to meet flood-pool requirements; paving was to start in mid-September, and in its September 2026 update the project expected the section to reopen in the fall, weather permitting.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh State Univ, 8.5 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525563728087918982726255
Low °F323340495866706963514135
Precipitation, in3.62.94.23.644.94.74.75.73.93.53.7
Snow, in2.50.80.100000000.11
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

11 Reddit threads about this trail, Apr 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4582085, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Black Creek Greenway — Visit Raleigh · web · checked Oct 16, 2026
    Supports: 7.1 miles, one of Cary's longest greenway trails, Old Reedy Creek Road trailhead at Lake Crabtree with restrooms and more than 80 parking spaces, North Cary Park, Fred G. Bond Metro Park, White Oak Creek Greenway adding more than 7 miles west, dawn to dusk, permitted users including cyclists and leashed pets
  3. Black Creek Greenway Renovation Project — Cary Greenway Detour (project information site) · web · checked Oct 16, 2026
    Supports: renovation from West Dynasty Drive to Old Reedy Creek Road and Cary Parkway pedestrian bridge begun June 2024, three phases with closures and detours, Crowder Construction, Phase 1 reopened August 29 (2025), Phase 2 and bridge opened May 1 (2026), Phase 3 closed May 4 (2026), Lake Crabtree flood-pool grading, paving mid-September, September 2026 update expecting a fall reopening
  4. Pictures: New Black Creek Greenway Section — Cary Citizen (January 15, 2013) · web · checked Oct 16, 2026
    Supports: 1.25-mile segment from Maynard and High House through Battery Park to Bond Park, wooden bridge near Castalia Drive, paved, greenway nearly complete at 6.86 miles per the town's Bike & Hike Map
  5. Black Creek Greenway — OpenStreetMap relation 4582085 · web · checked Oct 16, 2026
    Supports: mapped extent from Lake Crabtree to Bond Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.